Vedeți datele complete ale licitației: https://app.hermix.com/opportunities/00823170-2026
The €8.91 million EU-funded construction tender covers 295 homes across four developments, with 18 calendar days between publication and submission.
The Canary Islands Housing Institute is procuring energy retrofit works for four protected housing developments in Gran Canaria. Bidders have until 14 December 2026 to assess the work across all four sites and decide whether they can price and staff it. The developments range from 42 to 96 homes, so a bid team should start with a separate assessment of each site.
Prezentare generală a oportunității
- Contracting authority. Instituto Canario de la Vivienda, Spain.
- References. Notice 00823170-2026. Procurement reference OBR-PAU-MRR.P1.C2.I01-01/26.
- Scope. Energy retrofit construction works at four protected housing developments on Gran Canaria. The tender identifies 84 homes at San Fernando, 96 at Ciudad Campo, 42 at Mogán and 73 at Residencial Las Rosas.
- Published value. €8,911,501.20.
- Classification. Construction works, CPV 45211100.
- Dates. Published 26 November 2026. The deadline is 14 December 2026, an 18-calendar-day submission window.
- Funding. NextGenerationEU funding through the Recovery and Resilience Facility, identified in the tender title.
Sunteți gata să calificați mai rapid licitații de acest gen?
Creează-ți contul gratuit Hermix la https://hermix.com/sign-up/ și accesați analize ale licitațiilor bazate pe inteligență artificială, informații competitive și monitorizare automată pe piața europeană de achiziții publice, în valoare de 2 trilioane de euro.
Autoritate și context de achiziții
The institute has issued several notices for energy retrofits of protected housing. In September 2025 it published a €9,550,132.40 opportunity covering seven groups of publicly developed protected homes. That is a similar published value to the Gran Canaria tender, with a different number of developments. A bidder can use the earlier notice to look for comparable work while building its estimate from the scope at the four current sites. September 2025 notice
A January 2026 notice covered 14 groups across the provinces of Santa Cruz de Tenerife and Las Palmas. Hermix records a published value of €26,180,495.70. This is a useful comparison for companies that have managed work across several developments and can describe how they assigned supervision and specialist staff. The earlier project’s wider geography is part of the comparison. January 2026 notice.
The same buyer published a €1,990,782.82 opportunity in October 2026 covering five groups in Las Palmas province. It names more groups than the Gran Canaria tender and has a lower published value. This is important because the number of groups alone is a poor guide to how much work a bidder will have to price. Use the dwelling counts to organise the review, then build quantities and costs from the site requirements. October 2026 notice.
Peisaj competitiv
Hermix lists ten prior suppliers for the housing institute under CPV division 45, which covers construction work. The table shows the returned records ranked by contract count. The category is broader than energy retrofits, so check the scope of particular awards before treating a company as directly comparable on this tender.
| Supplier | Contracte | Recorded value | Recorded average |
|---|---|---|---|
| VVO CONSTRUCCIONES P MULTISERVICIOS VERDE SUAREZ | 6 | €19,282,904.28 | €9,641,452.14 |
| HORMICONSA CANARIAS | 5 | €43,972,157.33 | €8,794,431.47 |
| CITANIAS OBRAS Y SERVICIOS | 5 | €15,080,675.72 | €3,016,135.14 |
| CONSTRUPLAN CONSTRUCCIONES Y PLANIFICACION | 3 | €10,641,874.37 | €3,547,291.46 |
| VVO CONSTRUCCIONES P COMPANIA DE EFICIENCIA Y SERVICIOS INTEGRALES | 2 | €15,439,864.94 | €7,719,932.47 |
| TECNOLOGIA DE LA CONSTRUCCION Y OBRAS PUBLICAS OBRAS PUBLICAS CANARIAS OPC | 2 | €13,633,155.70 | €6,816,577.85 |
| TALLER DE CONSTRUCCION TMR | 2 | €10,654,816.70 | €10,654,816.70 |
| FOMENTO Y CONSTRUCCIONES ROQUE NUBLO | 2 | €4,626,264.00 | €2,313,132.00 |
| FACHADAS DIMUROL | 2 | €2,346,000.00 | €1,173,000.00 |
| VELPLUS CONSTRUCCIONES | 2 | €1,919,314.21 | €959,657.11 |
HORMICONSA CANARIAS and CITANIAS OBRAS Y SERVICIOS each appear against five contracts. Their recorded totals are about €44 million and €15.1 million respectively. Matching contract counts therefore tells a bidder little about the work each supplier has delivered. The more useful comparison is an award with a similar scope and a clear account of the supplier’s role.
For two rows, the recorded average differs from the total divided by the displayed contract count. VVO CONSTRUCCIONES P MULTISERVICIOS VERDE SUAREZ shows an average of €9,641,452.14, while its displayed total divided by six is €3,213,817.38. TALLER DE CONSTRUCCION TMR shows €10,654,816.70, while its total divided by two is €5,327,408.35. The table preserves Hermix’s recorded values. Inspect the underlying awards before relying on either average.
What affects the bid
Set up the estimate by development
San Fernando and Ciudad Campo together account for 180 of the 295 homes, just over 61%. That is a starting point for deciding where to focus the estimating team’s time. The two smaller developments still need their own assessment of access, supervision and how supplies reach the work area. A smaller dwelling count can leave some of those costs largely intact.
Start each site estimate with the quantities and specifications for that development. Once those are entered, review which rates can be shared across sites and which costs depend on the location or sequence of work. For example, a company could use the same purchasing assumptions for materials that the tender specifies across multiple sites, then price handling and storage separately where its delivery plan differs. The tender requirements determine whether that example applies.
Use the short window to resolve scope questions early
The 18-day window makes the first review important. If the team needs a specialist subcontractor to price part of the retrofit, send the relevant scope early enough to review the quote before the deadline. Agree who will check that the main estimate reflects the specialist’s assumptions. That step is particularly useful where a decision at one site affects the labour available at another.
The four named developments describe the physical scope. Before deciding whether to price any subset, check how the authority has structured submission and whether the tender permits separate offers. That check affects how a company allocates estimating time. It also determines whether a local firm’s capacity at one development is enough to make a bid feasible.
Establish what the funding means for delivery
The procurement identifies the Recovery and Resilience Facility as its source of EU funding. A bid team should identify the milestones, reporting requirements and records that the tender actually calls for, then assign responsibility for them when it builds the delivery plan. This gives the company a way to price the work of collecting information and reviewing it during construction. The funding label alone cannot establish the dates or records the buyer will require.
Each development needs its own estimate
The spread in site sizes gives bidders a way to test their staffing plan. If they propose to move trades between developments, they should check which activities need the same supervisors or specialists and where a late start could restrict that movement. If their plan uses separate teams, they can examine how much site management and coordination each team will need. Any sequencing proposal should follow the contract timetable.
Use the prior retrofit notices to choose examples that show this work clearly. A company with one large housing retrofit could explain the scale of the interventions and how it organised delivery across buildings. A company with several smaller projects might show how it scheduled shared staff or managed handovers across locations. The strongest example lets the reader understand the company’s role under the previous contract and the part of the Gran Canaria work it could perform.
One useful decision on the first read is who will own the four estimates. Site leads can establish their own assumptions, then compare costs that appear in more than one estimate. That review gives the commercial lead a chance to catch overlap or an omission before consolidating the price. It also helps the company decide whether its team can prepare the offer by 14 December.
Utilizatorii Hermix care analizează această licitație pot accesa instantaneu aceste informații competitive, inclusiv profiluri detaliate ale contractorilor, modele de cheltuieli ale autorităților și fluxul complet de reînnoiri, în câteva minute, în loc de ore.
Takeaways for Bidders
Cui i se potrivește această ofertă
- Companies with protected-housing retrofit experience. Choose project examples that show what the business did to improve the energy performance of housing and how it organised the construction work.
- Teams able to plan works across several developments. Check that the proposed site leads, supervisors and specialist trades can cover the four locations under the tender’s timetable.
Puncte critice de atenție
- Work back from 14 December 2026. Set internal dates for the four site estimates, specialist quotes and final review.
- Check the submission structure before choosing sites. Use the opportunity to confirm whether separate offers are permitted.
- Build the price from site scope. Check the quantities and requirements for each development before assigning costs across the 295 homes.
- Assign responsibility for funding-related records. Identify any requirements in the tender and allow for the staff time needed to meet them.
The €8.91 million tender brings four housing developments into the same procurement. A bidder can decide whether to proceed by checking the work at each development and confirming that its team can prepare one consistent delivery plan and estimate by 14 December.
Creează-ți contul gratuit astăzi la https://hermix.com/sign-up/ și câștigați mai multe contracte publice cu ajutorul abordării bazate pe date, care ajută companiile să aibă succes constant în vânzările B2G în întreaga Europă.