{"id":7738,"date":"2026-06-03T11:30:54","date_gmt":"2026-06-03T09:30:54","guid":{"rendered":"https:\/\/hermix.com\/?p=7738"},"modified":"2026-06-03T11:30:54","modified_gmt":"2026-06-03T09:30:54","slug":"licitatie-publica-pentru-furnizarea-instalarea-si-intretinerea-turbinelor-eoliene-pe-malul-stang-al-raului-scheldt-in-portul-anvers","status":"publish","type":"post","link":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/","title":{"rendered":"Licita\u021bie public\u0103 WIND AAN DE STROOM pentru furnizarea, instalarea \u0219i \u00eentre\u021binerea turbinelor eoliene pe malul st\u00e2ng al r\u00e2ului Scheldt \u00een Portul Anvers"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Vede\u021bi datele complete ale licita\u021biei: <a href=\"https:\/\/app.hermix.com\/opportunities\/00231679-2026\">https:\/\/app.hermix.com\/opportunities\/00231679-2026<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Un cadru de 32,4 milioane de euro pentru p\u00e2n\u0103 la patru turbine eoliene pe malul st\u00e2ng al ora\u0219ului Anvers ofer\u0103 furnizorilor o oportunitate rar\u0103 de infrastructur\u0103 portuar\u0103 care combin\u0103 durata lung\u0103 de via\u021b\u0103 a activelor, livrarea etapizat\u0103 \u0219i flexibilitatea \u00een negocieri, men\u021bin\u00e2nd \u00een acela\u0219i timp construc\u021bia final\u0103 legat\u0103 de rezultatele ob\u021binute \u00een materie de mediu \u0219i autoriza\u021bii.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">WIND AAN DE STROOM adopt\u0103 o cale negociat\u0103 c\u0103tre pia\u021b\u0103 pentru un cadru care acoper\u0103 furnizarea, instalarea \u0219i \u00eentre\u021binerea turbinelor eoliene \u00een zona portuar\u0103 din Anvers. Ambi\u021bia declarat\u0103 este dezvoltarea etapizat\u0103 a uneia p\u00e2n\u0103 la patru turbine pe Linkerscheldeoever, num\u0103rul final depinz\u00e2nd \u00eenc\u0103 de evaluarea de mediu \u00een curs \u0219i de procedurile de autorizare.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Aceast\u0103 combina\u021bie conteaz\u0103. Valoarea este semnificativ\u0103, durata este neobi\u0219nuit de lung\u0103, de 275 de luni, iar autoritatea a \u00eemp\u0103r\u021bit \u00een mod explicit sarcina \u00eentr-o parte fix\u0103 \u0219i o parte condi\u021bionat\u0103. Pentru ofertan\u021bi, acest lucru indic\u0103 o achizi\u021bie comercial\u0103 la scar\u0103 larg\u0103, dar totu\u0219i structural influen\u021bat\u0103 de riscul de planificare \u0219i de constr\u00e2ngerile naturale.<\/p>\n\n\n\n\n\n\n<h2 class=\"wp-block-heading\">Prezentare general\u0103 a oportunit\u0103\u021bii<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Autoritatea contractant\u0103:<\/strong> V\u00c2NTUL LA \u0218UFLET<\/li>\n\n\n\n<li><strong>Tipul cump\u0103r\u0103torului: <\/strong>Autoritate regional\u0103 sau local\u0103<\/li>\n\n\n\n<li><strong>Activitate principal\u0103:<\/strong> Servicii publice generale<\/li>\n\n\n\n<li><strong>Num\u0103r de referin\u021b\u0103:<\/strong> PPP0B3-19558\/6411\/B11330<\/li>\n\n\n\n<li><strong>ID document: <\/strong>00231679-2026 \/ b022e457-07ef-49fa-9893-618c6ce631b0 \/ 01KN8A7E00MBEBYKPJ213Q0G2H<\/li>\n\n\n\n<li><strong>Surs\u0103: <\/strong>BOSA TED<\/li>\n\n\n\n<li><strong>Titlul ofertei: <\/strong>Acord-cadru pentru furnizarea, instalarea \u0219i \u00eentre\u021binerea turbinelor eoliene pe malul st\u00e2ng al r\u00e2ului Scheldt \u00een portul Anvers<\/li>\n\n\n\n<li><strong>Contact: <\/strong>tanja.vervaet@windaandestroom.be | +32 32052233<\/li>\n\n\n\n<li><strong>URL-ul cump\u0103r\u0103torului:<\/strong> <a href=\"http:\/\/www.portofantwerpbruges.com\/\">http:\/\/www.portofantwerpbruges.com\/<\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Domeniul de activitate: <\/strong>Furnizarea de echipamente \u0219i executarea lucr\u0103rilor necesare pentru sistemele de semnalizare luminoas\u0103, semnalizarea retroreflectorizant\u0103, iluminatul fotovoltaic \u0219i tablourile de joas\u0103 tensiune pentru alte echipamente dec\u00e2t iluminatul public, legate de dezvoltarea fazat\u0103 a turbinelor eoliene pe re\u021beaua portuar\u0103 strategic\u0103.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Dezvoltarea \u00een etape a uneia p\u00e2n\u0103 la patru turbine eoliene \u00een zona portuar\u0103 din Anvers, \u00een special la Linkerscheldeoever.<\/li>\n\n\n\n<li>Num\u0103rul final de turbine depinde \u00een continuare de evaluarea impactului asupra mediului \u0219i de procedurile de autorizare \u00een curs.<\/li>\n\n\n\n<li>Contractul este \u00eemp\u0103r\u021bit \u00eentr-o parte fix\u0103 \u0219i o parte condi\u021bionat\u0103.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Structura lotului:<\/strong> Un lot care acoper\u0103 \u00eentregul cadru.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lotul 1: furnizarea, instalarea \u0219i \u00eentre\u021binerea turbinelor eoliene pe Linkerscheldeover din Portul Anvers. Valoare partajat\u0103 a cadrului: 32.392.496,60 EUR.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Locul execut\u0103rii: <\/strong>Sosire Antwerpen, Belgia<\/li>\n\n\n\n<li><strong>Valoare total\u0103 estimat\u0103<\/strong>: \u20ac32,392,496.60<\/li>\n\n\n\n<li><strong>Tipul contractului:<\/strong> Furnituri<\/li>\n\n\n\n<li><strong>Durata contractului: <\/strong>275 de luni<\/li>\n\n\n\n<li><strong>Tipul procedurii:<\/strong> Negociat cu publicarea prealabil\u0103 a unei invita\u021bii la o licita\u021bie de concurs \/ competitiv cu negociere<\/li>\n\n\n\n<li><strong>Criterii de acordare a premiului:<\/strong> Cost, Calitate<\/li>\n\n\n\n<li><strong>Data public\u0103rii: <\/strong>3 aprilie 2026<\/li>\n\n\n\n<li><strong>Termen limit\u0103 de depunere:<\/strong> 13 mai 2026<\/li>\n\n\n\n<li><strong>Data deschiderii ofertelor: <\/strong>Nedeclarat<\/li>\n\n\n\n<li><strong>Cerin\u021be lingvistice: <\/strong>flamand<\/li>\n\n\n\n<li><strong>Finan\u021bare UE:<\/strong> Nu<\/li>\n\n\n\n<li><strong>Garan\u021bii financiare: <\/strong>Garan\u021bie egal\u0103 cu 5% din valoarea estimat\u0103 a contractului, f\u0103r\u0103 TVA, rotunjit\u0103 la urm\u0103toarea zece sum\u0103 mai mare<\/li>\n\n\n\n<li><strong>Portal de trimitere:<\/strong> <a href=\"https:\/\/www.publicprocurement.be\">https:\/\/www.publicprocurement.be<\/a><\/li>\n\n\n\n<li><strong>Notific\u0103ri conexe: <\/strong>Un anun\u021b de contract conex din data de 3 aprilie 2026. Nu este listat\u0103 nicio notificare prealabil\u0103. Nu este afi\u0219at istoricul atribuirii contractelor sau re\u00eennoirile \u00een contextul vizibil Hermix.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>E\u0219ti gata s\u0103 califici licita\u021bii de acest gen mai rapid? Creeaz\u0103-\u021bi contul gratuit Hermix la <a href=\"https:\/\/hermix.com\/ro\/sign-up\/\">https:\/\/hermix.com\/sign-up\/<\/a> \u0219i accesa\u021bi analize ale licita\u021biilor bazate pe inteligen\u021b\u0103 artificial\u0103, informa\u021bii competitive \u0219i monitorizare automat\u0103 pe pia\u021ba european\u0103 de achizi\u021bii publice, \u00een valoare de 2 trilioane de euro.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Autoritatea \u0219i contextul achizi\u021biilor publice<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Cump\u0103r\u0103torul este listat ca o autoritate regional\u0103 sau local\u0103, a c\u0103rei activitate principal\u0103 este furnizarea de servicii publice generale. Dincolo de aceasta, anun\u021bul r\u0103m\u00e2ne restr\u00e2ns \u0219i practic. Nu adaug\u0103 o descriere institu\u021bional\u0103 ampl\u0103, astfel \u00eenc\u00e2t achizi\u021bia trebuie interpretat\u0103 \u00een ansamblu: un cadru pe termen lung pentru turbine eoliene \u00eentr-un mediu portuar de importan\u021b\u0103 strategic\u0103, cu o secven\u021biere a livr\u0103rilor legat\u0103 de constr\u00e2ngeri de planificare \u0219i ecologice.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Contextul Hermix vizibil \u00een surs\u0103 este rar pentru acest cump\u0103r\u0103tor. Nu exist\u0103 licita\u021bii deschise similare, re\u00eennoiri, atribuiri de contracte similare \u0219i notific\u0103ri prealabile \u00een profilul vizibil al cump\u0103r\u0103torului. Aceast\u0103 absen\u021b\u0103 este util\u0103 \u00een sine. \u00censeamn\u0103 c\u0103 ofertan\u021bii nu se pot baza pe o eviden\u021b\u0103 vizibil\u0103 a ciclurilor repetate de licita\u021bii sau a modelelor de atribuire ale titularilor \u00een aceast\u0103 vizualizare rezumativ\u0103. Interpretarea mai puternic\u0103 este c\u0103 aceast\u0103 oportunitate ar trebui calificat\u0103 \u00een principal pe baza cerin\u021belor proiectului, a pragurilor financiare \u0219i a compatibilit\u0103\u021bii execu\u021biei, mai degrab\u0103 dec\u00e2t pe baza comportamentului istoric al cump\u0103r\u0103torului.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Licita\u021bii deschise similare: 0, valoare 0 \u20ac<\/li>\n\n\n\n<li>Toate licita\u021biile deschise: 0, valoare 0 \u20ac<\/li>\n\n\n\n<li>Re\u00eennoiri similare: 0, valoare 0 \u20ac<\/li>\n\n\n\n<li>Toate re\u00eennoirile: 0, valoare 0 \u20ac<\/li>\n\n\n\n<li>Atribuiri de contracte similare: 0, valoare 0 \u20ac<\/li>\n\n\n\n<li>Toate contractele atribuite: 0, valoare 0 \u20ac<\/li>\n\n\n\n<li>Al\u021bi cump\u0103r\u0103tori cu proiecte similare: 260, valoare 186 milioane \u20ac<\/li>\n\n\n\n<li>Notific\u0103ri anterioare similare: 0, valoare 0 \u20ac<\/li>\n\n\n\n<li>Toate notific\u0103rile prealabile: 0, valoare 0 \u20ac<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Sec\u021biunea de anun\u021buri aferente prezint\u0103 anun\u021bul de participare \u00een sine \u0219i nimic mai mult. Nu exist\u0103 nicio notificare prealabil\u0103 \u00een \u00eenregistrarea vizibil\u0103 \u0219i nicio notificare separat\u0103 de atribuire sau dovad\u0103 de re\u00eennoire pentru a fi consultat\u0103. Din perspectiva ofertantului, acest lucru reduce cantitatea de semnalizare istoric\u0103 public\u0103 disponibil\u0103 \u00eenainte de a consulta documentele de licita\u021bie.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Peisaj competitiv<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">\u00cen \u00eenregistrarea surs\u0103 pentru aceast\u0103 oportunitate nu este vizibil niciun tabel cu c\u00e2\u0219tig\u0103torii contractelor similare. Aceasta \u00eenseamn\u0103 c\u0103 nu exist\u0103 o list\u0103 clasat\u0103 a contractorilor, valori ale contractelor, num\u0103r\u0103ri \u0219i nicio defalcare pe \u021b\u0103ri a c\u00e2\u0219tig\u0103torilor anteriori pentru a se compara direct cu acest cump\u0103r\u0103tor \u00een vizualizarea Hermix curent\u0103.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">C\u00e2nd tabelul respectiv lipse\u0219te, lentila concuren\u021bial\u0103 trebuie s\u0103 se mute spre exterior. Singurul punct de referin\u021b\u0103 vizibil pe pia\u021b\u0103 este prezen\u021ba a al\u021bi 260 de cump\u0103r\u0103tori cu proiecte similare \u00een valoare de 186 de milioane de euro. Acest lucru ne spune c\u0103 exist\u0103 o pia\u021b\u0103 adresabil\u0103 mai larg\u0103 pentru lucr\u0103ri similare legate de turbinele eoliene sau lucr\u0103ri de infrastructur\u0103 energetic\u0103 comparabile, dar nu identific\u0103 operatorii existen\u021bi numi\u021bi pentru aceast\u0103 autoritate specific\u0103.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Practic, acest lucru creeaz\u0103 un c\u00e2mp de calificare pu\u021bin mai curat. Furnizorii nu au un titular evident publicat \u00eempotriva c\u0103ruia s\u0103 se pozi\u021bioneze \u00een acest rezumat. \u00cen schimb, competi\u021bia se va baza probabil pe credibilitatea tehnic\u0103, structura comercial\u0103, capacitatea de a gestiona implementarea etapizat\u0103 \u0219i \u00eencrederea \u00een por\u021biunile fixe \u0219i condi\u021bionate ale sarcinii.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Semnale comerciale \u0219i procedurale<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Mai mul\u021bi indicatori comerciali ies imediat \u00een eviden\u021b\u0103. \u00cen primul r\u00e2nd, contractul utilizeaz\u0103 o procedur\u0103 negociat\u0103 cu publicare prealabil\u0103. Aceasta este diferit\u0103 de o atribuire deschis\u0103 direct\u0103, doar pe h\u00e2rtie. Aceasta \u00eenseamn\u0103 c\u0103 furnizorii ar trebui s\u0103 se a\u0219tepte la o dinamic\u0103 de selec\u021bie mai activ\u0103, \u00een care autoritatea poate modela c\u00e2mpul concuren\u021bial prin dialog \u0219i negociere, \u00een loc s\u0103 se bazeze exclusiv pe o singur\u0103 compara\u021bie sigur\u0103.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00cen al doilea r\u00e2nd, achizi\u021bia este lung\u0103. O durat\u0103 de 275 de luni indic\u0103 o rela\u021bie cu activele, mai degrab\u0103 dec\u00e2t un pachet de construc\u021bie scurt. Acest lucru este important pentru stabilirea pre\u021burilor, ipotezele de \u00eentre\u021binere, planificarea serviciilor pe durata de via\u021b\u0103 \u0219i alocarea riscurilor. Ofertan\u021bii trebuie s\u0103 se g\u00e2ndeasc\u0103 dincolo de livrarea \u0219i instalarea turbinelor \u0219i de pre\u021b, pentru un orizont de operare lung.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00cen al treilea r\u00e2nd, scurta descriere explic\u0103 logica etapizat\u0103. Cump\u0103r\u0103torul dore\u0219te s\u0103 continue cu una p\u00e2n\u0103 la patru turbine, dar num\u0103rul final depinde \u00eenc\u0103 de evaluarea de mediu \u0219i de ob\u021binerea autoriza\u021biilor. Aceasta nu este o culoare de fundal. Este una dintre condi\u021biile comerciale de baz\u0103 ale oportunit\u0103\u021bii. Furnizorii ar trebui s\u0103 trateze flexibilitatea volumului, secven\u021bierea \u0219i mobilizarea condi\u021bionat\u0103 ca aspecte legate de licita\u021bia real\u0103, nu ca note secundare.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cadrul este, de asemenea, \u00eemp\u0103r\u021bit \u00eentr-o parte fix\u0103 \u0219i o parte condi\u021bionat\u0103. Chiar dac\u0103 anun\u021bul nu detaliaz\u0103 valorile pentru aceste componente, structura conteaz\u0103. Aceasta implic\u0103 un angajament de baz\u0103 plus o cale de extindere care depinde de modul \u00een care evolueaz\u0103 planificarea \u0219i constr\u00e2ngerile legate de natur\u0103. Pentru ofertan\u021bi, acest lucru afecteaz\u0103 programarea produc\u021biei, subcontractarea, planificarea amplasamentului \u0219i, eventual, modul \u00een care marja este distribuit\u0103 \u00een cadrul modelului comercial.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Limba este o alt\u0103 poart\u0103 de acces. Ofertele trebuie depuse \u00een limba flamand\u0103. Acest lucru restr\u00e2nge grupul realist de furnizori la cei care pot gestiona nu doar livrarea tehnic\u0103 \u00een Belgia, ci \u0219i redactarea ofertelor, negocierea \u0219i executarea contractelor \u00een limba solicitat\u0103.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Garan\u021bia financiar\u0103 este concret\u0103. Notificarea solicit\u0103 o garan\u021bie egal\u0103 cu 5% din valoarea estimat\u0103 a contractului, f\u0103r\u0103 TVA, rotunjit\u0103 la urm\u0103toarea zece cifre superioare. Aceasta este o cerin\u021b\u0103 de securitate semnificativ\u0103 pentru furnizori \u0219i ar trebui verificat\u0103 din timp \u00een func\u021bie de capacitatea de trezorerie \u0219i de aranjamentele bancare.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Perioada de depunere a ofertelor este \u00eentre 3 aprilie 2026 \u0219i 13 mai 2026, ceea ce ofer\u0103 ofertan\u021bilor 40 de zile calendaristice. Aceast\u0103 perioad\u0103 este fezabil\u0103, dar nu generoas\u0103 pentru o achizi\u021bie public\u0103 negociat\u0103 pentru infrastructura energetic\u0103, cu complexitate de mediu \u0219i de e\u0219alonare. Furnizorii vor trebui s\u0103 pun\u0103 rapid \u00een aplicare aspectele juridice, tehnice \u0219i financiare.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Context strategic \u0219i interpretare<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Aceast\u0103 licita\u021bie se situeaz\u0103 \u00eentr-o zon\u0103 intermediar\u0103 interesant\u0103. Pe de o parte, este o oportunitate de infrastructur\u0103 clar definit\u0103, cu o valoare publicat\u0103, un singur lot \u0219i o zon\u0103 geografic\u0103 identificabil\u0103 a amplasamentului. Pe de alt\u0103 parte, construc\u021bia propriu-zis\u0103 r\u0103m\u00e2ne par\u021bial fluid\u0103, deoarece num\u0103rul final de turbine depinde de rezultatele de mediu \u0219i de autorizare. Acest lucru face ca proiectul s\u0103 semene mai pu\u021bin cu o v\u00e2nzare simpl\u0103 de echipamente \u0219i mai mult cu un program structurat de infrastructur\u0103 cu op\u021bionalitate etapizat\u0103.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Durata lung\u0103 \u00eent\u0103re\u0219te aceast\u0103 interpretare. Un termen de 275 de luni sugereaz\u0103 c\u0103 autoritatea achizi\u021bioneaz\u0103 pentru o rela\u021bie pe termen lung, mai degrab\u0103 dec\u00e2t doar pentru un pachet de construc\u021bii pe termen scurt. Furnizorii care optimizeaz\u0103 doar pentru costul ini\u021bial de livrare ar putea \u00eent\u00e2mpina dificult\u0103\u021bi dac\u0103 nu demonstreaz\u0103, de asemenea, o logic\u0103 credibil\u0103 de \u00eentre\u021binere pe termen lung \u0219i rezilien\u021b\u0103 opera\u021bional\u0103.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Absen\u021ba premiilor \u0219i re\u00eennoirilor istorice vizibile \u00een profilul cump\u0103r\u0103torului \u00eenseamn\u0103 c\u0103 exist\u0103 mai pu\u021bin\u0103 recunoa\u0219tere public\u0103 a tiparelor disponibile dec\u00e2t \u00een categoriile mai mature de achizi\u021bii repetate. Acest lucru poate \u00eengreuna calificarea, dar reduce \u0219i atrac\u021bia gravita\u021bional\u0103 a unei nara\u021biuni vizibile a unui concurent existent. Practic, documentele conteaz\u0103 mai mult dec\u00e2t istoricul, deoarece istoricul prezentat aici este aproape inexistent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Combina\u021bia dintre o procedur\u0103 negociat\u0103, o structur\u0103 fix\u0103 plus condi\u021bionat\u0103 \u0219i o dependen\u021b\u0103 explicit\u0103 de permis sugereaz\u0103 un cump\u0103r\u0103tor care dore\u0219te spa\u021biu de manevr\u0103 pentru a modela rezultatul comercial final, \u00een loc s\u0103 blocheze fiecare variabil\u0103 \u00een etapa de notificare. Furnizorii ar trebui s\u0103 interpreteze acest lucru ca pe o instruc\u021biune de a prezenta flexibilitatea \u00eentr-un mod controlat: robust\u0103 acolo unde domeniul de aplicare fix este clar, adaptabil\u0103 acolo unde domeniul de aplicare condi\u021bionat se poate extinde sau contracta.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Utilizatorii Hermix care analizeaz\u0103 aceast\u0103 licita\u021bie pot accesa instantaneu aceste informa\u021bii competitive, inclusiv profiluri detaliate ale contractorilor, modele de cheltuieli ale autorit\u0103\u021bilor \u0219i fluxul complet de re\u00eennoiri, \u00een c\u00e2teva minute, \u00een loc de ore.<\/p>\n\n\n\n\n\n\n<h2 class=\"wp-block-heading\">Concluzii practice pentru ofertan\u021bi<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Cui i se potrive\u0219te aceast\u0103 ofert\u0103<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Furnizori cu capacitate de livrare \u0219i instalare a turbinelor eoliene \u00een Belgia, \u00een special cei capabili s\u0103 opereze \u00eentr-un port sau \u00eentr-un mediu de transport strategic.<\/li>\n\n\n\n<li>Ofertan\u021bi care pot sus\u021bine at\u00e2t livrarea de capital, c\u00e2t \u0219i mentenan\u021ba pe termen lung pe un orizont de 275 de luni.<\/li>\n\n\n\n<li>Echipe cu capacitatea juridic\u0103 \u0219i comercial\u0103 de a gestiona o achizi\u021bie public\u0103 negociat\u0103 \u00een limba flamand\u0103.<\/li>\n\n\n\n<li>Furnizorii sunt confortabili cu implementarea \u00een etape, unde volumul final poate varia de la una la patru turbine, iar o parte din domeniul de aplicare este condi\u021bionat\u0103.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Puncte critice de aten\u021bie<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Trata\u021bi suma de 32.392.496,60 EUR ca fiind totalul cadrului comun. Exist\u0103 un lot, iar valoarea publicat\u0103 a lotului corespunde cu totalul estimat declarat.<\/li>\n\n\n\n<li>Planifica\u021bi o garan\u021bie de bun\u0103 execu\u021bie de 5% pentru suma estimat\u0103, f\u0103r\u0103 TVA, rotunjit\u0103 la urm\u0103toarea zece cifr\u0103 mai mare.<\/li>\n\n\n\n<li>Nu subestima\u021bi constr\u00e2ngerile de planificare \u0219i cele legate de natur\u0103. Num\u0103rul final de turbine depinde de evaluarea de mediu \u00een curs \u0219i de procedurile de autorizare.<\/li>\n\n\n\n<li>Construi\u021bi un model de ofert\u0103 care separ\u0103 clar partea fix\u0103 de partea condi\u021bionat\u0103 a atribuirii, chiar dac\u0103 notificarea nu le atribuie valori separate.<\/li>\n\n\n\n<li>P\u0103stra\u021bi competen\u021ba lingvistic\u0103 \u00een raza de ac\u021biune \u00eenc\u0103 de la \u00eenceput. Limba oferit\u0103 este flamanda, ceea ce are implica\u021bii practice pentru redactare, negociere \u0219i execu\u021bie.<\/li>\n\n\n\n<li>Lucra\u021bi cu intervalul de 40 de zile pentru depunerea ofertelor \u0219i nu presupune\u021bi o resetare ulterioar\u0103. Notificarea nu men\u021bioneaz\u0103 o dat\u0103 de deschidere a ofertelor dup\u0103 termenul limit\u0103 de depunere.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Paragraf de \u00eencheiere<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Aceasta este o oportunitate notabil\u0103 deoarece combin\u0103 o valoare-cadru semnificativ\u0103 cu un orizont lung de livrare \u0219i o structur\u0103 a proiectului modelat\u0103 de autoriza\u021bii \u0219i dependen\u021ba de mediu, mai degrab\u0103 dec\u00e2t de un num\u0103r fix de construc\u021bii. Pentru ofertan\u021bi, acest lucru face ca calificarea disciplinat\u0103 s\u0103 fie esen\u021bial\u0103: cele mai puternice propuneri vor fi cele care pot stabili pre\u021bul \u0219i pot oferi certitudine acolo unde anun\u021bul este ferm, r\u0103m\u00e2n\u00e2nd \u00een acela\u0219i timp credibile din punct de vedere comercial acolo unde domeniul de aplicare r\u0103m\u00e2ne condi\u021bionat.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Creeaz\u0103-\u021bi contul gratuit ast\u0103zi la <a href=\"https:\/\/hermix.com\/ro\/sign-up\/\">https:\/\/hermix.com\/sign-up\/<\/a> \u0219i c\u00e2\u0219tiga\u021bi mai multe contracte publice cu ajutorul abord\u0103rii bazate pe date, care ajut\u0103 companiile s\u0103 aib\u0103 succes constant \u00een v\u00e2nz\u0103rile B2G \u00een \u00eentreaga Europ\u0103.<\/p>\n\n\n<figure class=\"wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1200\" height=\"628\" src=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Licita\u021bie public\u0103 WIND AAN DE STROOM pentru furnizarea, instalarea \u0219i \u00eentre\u021binerea turbinelor eoliene pe malul st\u00e2ng al r\u00e2ului Scheldt \u00een Portul Anvers\" style=\"object-fit:cover;\" srcset=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png 1200w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image-300x157.png 300w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image-1024x536.png 1024w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image-768x402.png 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp&#8217;s Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":7883,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","inline_featured_image":false,"page_builder":"","footnotes":"","_ppma_block_editor_authors":""},"categories":[35],"tags":[],"ppma_author":[17],"class_list":["post-7738","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tender-analysis"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp&#039;s Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Andreea Ilie\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"ro_RO\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Hermix - Win Public Contracts with the Power of AI\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix\" \/>\n\t\t<meta property=\"og:description\" content=\"View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp&#039;s Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-06-03T09:30:54+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-06-03T09:30:54+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/hermixapp\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:title\" content=\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix\" \/>\n\t\t<meta name=\"twitter:description\" content=\"View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp&#039;s Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#blogposting\",\"name\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix\",\"headline\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp\",\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/andreea-ilie\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png\",\"width\":1200,\"height\":628,\"caption\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp\"},\"datePublished\":\"2026-06-03T11:30:54+03:00\",\"dateModified\":\"2026-06-03T11:30:54+03:00\",\"inLanguage\":\"ro-RO\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#webpage\"},\"articleSection\":\"Tender Analysis, Andreea Ilie\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hermix.com\\\/ro\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/category\\\/tender-analysis\\\/#listItem\",\"position\":2,\"name\":\"Tender Analysis\",\"item\":\"https:\\\/\\\/hermix.com\\\/ro\\\/category\\\/tender-analysis\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#listItem\",\"name\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#listItem\",\"position\":3,\"name\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#organization\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"url\":\"https:\\\/\\\/hermix.com\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.hermix.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hermix_logo.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/hermixapp\",\"https:\\\/\\\/twitter.com\\\/Hermix_sw\",\"https:\\\/\\\/www.instagram.com\\\/hermix_sw\\\/\",\"https:\\\/\\\/be.linkedin.com\\\/company\\\/hermix\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/andreea-ilie\\\/#author\",\"url\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/andreea-ilie\\\/\",\"name\":\"Andreea Ilie\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#webpage\",\"url\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/\",\"name\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix\",\"description\":\"View full tender data: https:\\\/\\\/app.hermix.com\\\/opportunities\\\/00231679-2026 A \\u20ac32.4 million framework for up to four wind turbines on Antwerp's Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated\",\"inLanguage\":\"ro-RO\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/andreea-ilie\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/andreea-ilie\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#mainImage\",\"width\":1200,\"height\":628,\"caption\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#mainImage\"},\"datePublished\":\"2026-06-03T11:30:54+03:00\",\"dateModified\":\"2026-06-03T11:30:54+03:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/hermix.com\\\/ro\\\/\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"inLanguage\":\"ro-RO\",\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Licita\u021bie public\u0103 WIND AAN DE STROOM pentru furnizarea, instalarea \u0219i \u00eentre\u021binerea turbinelor eoliene pe malul st\u00e2ng al r\u00e2ului Scheldt \u00een Portul Anvers - Hermix","description":"Vede\u021bi datele complete ale licita\u021biei: https:\/\/app.hermix.com\/opportunities\/00231679-2026 Un cadru de 32,4 milioane EUR pentru p\u00e2n\u0103 la patru turbine eoliene pe malul st\u00e2ng al ora\u0219ului Anvers ofer\u0103 furnizorilor o oportunitate rar\u0103 de infrastructur\u0103 portuar\u0103 care combin\u0103 durata lung\u0103 de via\u021b\u0103 a activelor, livrarea etapizat\u0103 \u0219i flexibilitatea negocierii, men\u021bin\u00e2nd \u00een acela\u0219i timp construc\u021bia final\u0103 legat\u0103 de rezultatele de mediu \u0219i de autorizare. WIND AAN DE STROOM negociaz\u0103...","canonical_url":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#blogposting","name":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix","headline":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp","author":{"@id":"https:\/\/hermix.com\/ro\/author\/andreea-ilie\/#author"},"publisher":{"@id":"https:\/\/hermix.com\/ro\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png","width":1200,"height":628,"caption":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp"},"datePublished":"2026-06-03T11:30:54+03:00","dateModified":"2026-06-03T11:30:54+03:00","inLanguage":"ro-RO","mainEntityOfPage":{"@id":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#webpage"},"isPartOf":{"@id":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#webpage"},"articleSection":"Tender Analysis, Andreea Ilie"},{"@type":"BreadcrumbList","@id":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro#listItem","position":1,"name":"Home","item":"https:\/\/hermix.com\/ro","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/#listItem","position":2,"name":"Tender Analysis","item":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#listItem","name":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp"},"previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#listItem","position":3,"name":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp","previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}}]},{"@type":"Organization","@id":"https:\/\/hermix.com\/ro\/#organization","name":"Hermix","description":"Win Public Contracts with the Power of AI","url":"https:\/\/hermix.com\/ro\/","logo":{"@type":"ImageObject","url":"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png","@id":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#organizationLogo"},"image":{"@id":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/hermixapp","https:\/\/twitter.com\/Hermix_sw","https:\/\/www.instagram.com\/hermix_sw\/","https:\/\/be.linkedin.com\/company\/hermix"]},{"@type":"Person","@id":"https:\/\/hermix.com\/ro\/author\/andreea-ilie\/#author","url":"https:\/\/hermix.com\/ro\/author\/andreea-ilie\/","name":"Andreea Ilie"},{"@type":"WebPage","@id":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#webpage","url":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/","name":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix","description":"View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp's Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated","inLanguage":"ro-RO","isPartOf":{"@id":"https:\/\/hermix.com\/ro\/#website"},"breadcrumb":{"@id":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#breadcrumblist"},"author":{"@id":"https:\/\/hermix.com\/ro\/author\/andreea-ilie\/#author"},"creator":{"@id":"https:\/\/hermix.com\/ro\/author\/andreea-ilie\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png","@id":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#mainImage","width":1200,"height":628,"caption":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp"},"primaryImageOfPage":{"@id":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#mainImage"},"datePublished":"2026-06-03T11:30:54+03:00","dateModified":"2026-06-03T11:30:54+03:00"},{"@type":"WebSite","@id":"https:\/\/hermix.com\/ro\/#website","url":"https:\/\/hermix.com\/ro\/","name":"Hermix","description":"Win Public Contracts with the Power of AI","inLanguage":"ro-RO","publisher":{"@id":"https:\/\/hermix.com\/ro\/#organization"}}]},"og:locale":"ro_RO","og:site_name":"Hermix - Win Public Contracts with the Power of AI","og:type":"article","og:title":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix","og:description":"View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp's Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated","og:url":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/","og:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png","og:image:secure_url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png","og:image:width":1200,"og:image:height":628,"article:published_time":"2026-06-03T09:30:54+00:00","article:modified_time":"2026-06-03T09:30:54+00:00","article:publisher":"https:\/\/www.facebook.com\/hermixapp","twitter:card":"summary_large_image","twitter:site":"@Hermix_sw","twitter:title":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix","twitter:description":"View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp's Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated","twitter:creator":"@Hermix_sw","twitter:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png"},"aioseo_meta_data":{"post_id":"7738","title":null,"description":null,"keywords":null,"keyphrases":{"focus":[],"additional":[]},"focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-08-13 01:26:49","updated":"2026-08-20 11:56:21"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/ro\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/ro\/category\/tender-analysis\/\" title=\"Tender Analysis\">Tender Analysis<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tWIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/hermix.com\/ro"},{"label":"Tender Analysis","link":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/"},{"label":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp","link":"https:\/\/hermix.com\/ro\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/"}],"authors":[{"term_id":17,"user_id":3,"is_guest":0,"slug":"andreea-ilie","display_name":"Andreea Ilie","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/cb0674b58c82c13f3140f57ce6b238abab5257f06d482468c588e76c72b29e8c?s=96&d=mm&r=g","author_category":"","first_name":"","last_name":"","user_url":"","job_title":"","description":""}],"_links":{"self":[{"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/posts\/7738","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/comments?post=7738"}],"version-history":[{"count":0,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/posts\/7738\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/media\/7883"}],"wp:attachment":[{"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/media?parent=7738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/categories?post=7738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/tags?post=7738"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/ppma_author?post=7738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}