{"id":11429,"date":"2026-10-30T15:12:14","date_gmt":"2026-10-30T13:12:14","guid":{"rendered":"https:\/\/hermix.com\/?p=11429"},"modified":"2026-10-30T15:12:15","modified_gmt":"2026-10-30T13:12:15","slug":"departamentul-pentru-locuinte-administratie-locala-si-patrimoniu-licitatie-publica-pentru-modernizarea-alimentarii-cu-apa-a-parcului-coole","status":"publish","type":"post","link":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/","title":{"rendered":"Licita\u021bie public\u0103 a Departamentului pentru Locuin\u021be, Administra\u021bie Local\u0103 \u0219i Patrimoniu pentru modernizarea aliment\u0103rii cu ap\u0103 din Coole Park"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>Vede\u021bi datele complete ale licita\u021biei:<\/strong> <a href=\"https:\/\/app.hermix.com\/opportunities\/00652874-2026\">https:\/\/app.hermix.com\/opportunities\/00652874-2026<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Un contract de lucr\u0103ri \u00een valoare de 500.000 EUR acoper\u0103 o nou\u0103 conduct\u0103 principal\u0103 de ap\u0103, un rezervor de stocare a apei, o hal\u0103 de tratare \u0219i o conduct\u0103 de serviciu \u00een Rezerva\u021bia Natural\u0103 Coole Park, cu o perioad\u0103 de livrare de trei luni \u0219i un lot integrat.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Departamentul pentru Locuin\u021be, Administra\u021bie Local\u0103 \u0219i Patrimoniu achizi\u021bioneaz\u0103 o modernizare compact\u0103 a infrastructurii de ap\u0103 la Rezerva\u021bia Natural\u0103 Coole Park. Lucr\u0103rile combin\u0103 instalarea de conducte, stocarea apei, infrastructura de tratare \u0219i conductele de servicii \u00eentr-un lot de 500.000 EUR, toate componentele enumerate fiind incluse \u00een acela\u0219i lot.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Achizi\u021bia este deschis\u0103, perioada contractului este de trei luni, iar furnizorii au la dispozi\u021bie 24 de zile calendaristice \u00eentre publicarea din 22 septembrie 2026 \u0219i termenul limit\u0103 de depunere a cererilor, 16 octombrie 2026. Profilul cump\u0103r\u0103torului nu con\u021bine atribuiri de contracte \u00eenregistrate \u00een contextul Hermix disponibil, astfel \u00eenc\u00e2t ofertan\u021bii au pu\u021bin istoric specific atribuirilor cump\u0103r\u0103torului pe care s\u0103 \u00eel utilizeze atunci c\u00e2nd evalueaz\u0103 probabilitatea de ocupare a postului sau modelele de furnizori fideli.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Prezentare general\u0103 a oportunit\u0103\u021bii<\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Autoritatea contractant\u0103:<\/strong> DEPARTAMENTUL LOCUIN\u021aELOR, ADMINISTRA\u021aIEI LOCALE \u0218I PATRIMONIULUI<\/li>\n\n\n\n<li><strong>Tipul cump\u0103r\u0103torului:<\/strong> Minister sau orice alt\u0103 autoritate na\u021bional\u0103 sau federal\u0103<\/li>\n\n\n\n<li><strong>Activitate principal\u0103:<\/strong> Protec\u021bia mediului<\/li>\n\n\n\n<li><strong>ID document:<\/strong> 00652874-2026<\/li>\n\n\n\n<li><strong>Referin\u021b\u0103 TED:<\/strong> 2026\/S 183-00652874<\/li>\n\n\n\n<li><strong>Titlul ofertei:<\/strong> Modernizarea aliment\u0103rii cu ap\u0103 a parcului Coole<\/li>\n\n\n\n<li><strong>Contact:<\/strong> strategy@housing.gov.ie; +53 9117410<\/li>\n\n\n\n<li><strong>Domeniul de activitate:<\/strong> Instalarea unei noi conducte principale de ap\u0103, a unui rezervor de stocare a apei, a unei hale de tratare \u0219i a unor conducte de serviciu \u00een Rezerva\u021bia Natural\u0103 Coole Park<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Instala\u021bie nou\u0103 de ap\u0103<\/li>\n\n\n\n<li>Rezervor de stocare a apei<\/li>\n\n\n\n<li>\u0218opron de tratament<\/li>\n\n\n\n<li>Conducte de serviciu<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Structura lotului:<\/strong> Lotul 1 \u2013 Modernizarea aliment\u0103rii cu ap\u0103 Coole Park, valoare 500.000,00 EUR. Achizi\u021bia complet\u0103 este inclus\u0103 \u00een acest lot unic.<\/li>\n\n\n\n<li><strong>Locul execu\u021biei:<\/strong> Geografia la nivel de oportunitate este listat\u0103 ca Vest, Sud-Est. Lotul 1 men\u021bioneaz\u0103 Sud-Estul ca principal loc de execu\u021bie.<\/li>\n\n\n\n<li><strong>Valoare total\u0103 estimat\u0103:<\/strong> 500.000,00 EUR<\/li>\n\n\n\n<li><strong>Tipul contractului:<\/strong> Fabric\u0103<\/li>\n\n\n\n<li><strong>Durata contractului:<\/strong> 3 luni<\/li>\n\n\n\n<li><strong>Tipul procedurii:<\/strong> Deschide<\/li>\n\n\n\n<li><strong>Criterii de premiere:<\/strong> Nedeclarat<\/li>\n\n\n\n<li><strong>Data public\u0103rii:<\/strong> 22 septembrie 2026<\/li>\n\n\n\n<li><strong>Termen limit\u0103 de depunere:<\/strong> 16 octombrie 2026<\/li>\n\n\n\n<li><strong>Data deschiderii ofertelor:<\/strong> 16 octombrie 2026<\/li>\n\n\n\n<li><strong>Cerin\u021be lingvistice:<\/strong> Englez\u0103<\/li>\n\n\n\n<li><strong>Finan\u021bare UE:<\/strong> Nu<\/li>\n\n\n\n<li><strong>Portal de trimitere:<\/strong> https:\/\/www.etenders.gov.ie\/epps\/cft\/viewTenders.do?resourceId=9113006<\/li>\n\n\n\n<li><strong>Surs\u0103:<\/strong> TED<\/li>\n\n\n\n<li><strong>Notific\u0103ri conexe:<\/strong> Nu este listat\u0103 nicio achizi\u021bie public\u0103 sau rectificare anterioar\u0103 conex\u0103. Intrarea conex\u0103 afi\u0219at\u0103 este intrarea contractului actual publicat\u0103 la 22 septembrie 2026 la 500.000,00 EUR.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>E\u0219ti gata s\u0103 califici licita\u021bii de acest gen mai rapid? Creeaz\u0103-\u021bi contul gratuit Hermix la<\/strong> <a href=\"https:\/\/hermix.com\/ro\/inscrie-te\/\">https:\/\/hermix.com\/sign-up\/<\/a> \u0219i accesa\u021bi analize ale licita\u021biilor bazate pe inteligen\u021b\u0103 artificial\u0103, informa\u021bii competitive \u0219i monitorizare automatizat\u0103 pe pia\u021ba european\u0103 de achizi\u021bii publice, \u00een valoare de 2 trilioane de euro.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Autoritatea \u0219i contextul achizi\u021biilor publice<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Autoritatea contractant\u0103 este Departamentul pentru Locuin\u021be, Administra\u021bie Local\u0103 \u0219i Patrimoniu din Irlanda. Acesta este clasificat drept minister sau alt\u0103 autoritate na\u021bional\u0103 sau federal\u0103, iar principala sa activitate este protec\u021bia mediului. Prin urmare, achizi\u021biile publice sunt gestionate de o autoritate public\u0103 na\u021bional\u0103, mai degrab\u0103 dec\u00e2t de un cump\u0103r\u0103tor local sau regional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pentru aceast\u0103 oportunitate, cump\u0103r\u0103torul caut\u0103 un antreprenor de lucr\u0103ri pentru o modernizare fizic\u0103 clar delimitat\u0103 la Rezerva\u021bia Natural\u0103 Coole Park. Domeniul de aplicare al achizi\u021biei este specific: o nou\u0103 conduct\u0103 de ap\u0103, un rezervor de stocare a apei, o hal\u0103 de tratare \u0219i conducte de serviciu. Nu sunt enumerate elemente de construc\u021bie suplimentare \u00een domeniul de aplicare disponibil, a\u0219adar ofertan\u021bii ar trebui s\u0103 separe ceea ce este inclus \u00een mod expres de cerin\u021bele care pot ap\u0103rea doar \u00een pachetul de achizi\u021bii de pe portalul de depunere a cererilor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Profilul cump\u0103r\u0103torului Hermix este relativ limitat pentru aceast\u0103 categorie. Acest lucru influen\u021beaz\u0103 c\u00e2t de multe se pot deduce din comportamentul istoric \u00een achizi\u021bii:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Licita\u021bii deschise similare: 0, cu o valoare \u00eenregistrat\u0103 de 0 EUR.<\/li>\n\n\n\n<li>Toate licita\u021biile deschise: 4, cu o valoare \u00eenregistrat\u0103 combinat\u0103 de 300.000 EUR.<\/li>\n\n\n\n<li>Re\u00eennoiri similare: 1, \u00een valoare de 50.000 EUR.<\/li>\n\n\n\n<li>Toate re\u00eennoirile: 5, cu o valoare \u00eenregistrat\u0103 combinat\u0103 de 350.000 EUR.<\/li>\n\n\n\n<li>Atribuiri de contracte similare: 0, cu o valoare \u00eenregistrat\u0103 de 0 EUR.<\/li>\n\n\n\n<li>Toate contractele atribuite: 0, cu o valoare \u00eenregistrat\u0103 de 0 EUR.<\/li>\n\n\n\n<li>Al\u021bi cump\u0103r\u0103tori cu proiecte similare: 794, reprezent\u00e2nd o valoare \u00eenregistrat\u0103 de 13 miliarde EUR.<\/li>\n\n\n\n<li>Notific\u0103ri prealabile similare: 0. Toate notific\u0103rile prealabile: 0.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Absen\u021ba atribuirilor \u00eenregistrate \u00eenseamn\u0103 c\u0103 nu exist\u0103 un set istoric de c\u00e2\u0219tig\u0103tori specific cump\u0103r\u0103torului, din care s\u0103 se poat\u0103 identifica furnizorii fideli, contractorii existen\u021bi sau dimensiunile tipice ale contractelor. Aceasta este o limitare important\u0103 pentru analiza concuren\u021bial\u0103. Contextul mai larg al pie\u021bei este \u00eens\u0103 mult mai profund, cu al\u021bi 794 de cump\u0103r\u0103tori asocia\u021bi cu proiecte similare \u0219i o valoare \u00eenregistrat\u0103 de 13 miliarde EUR. Aceast\u0103 cifr\u0103 este util\u0103 ca context general al pie\u021bei, dar nu ar trebui tratat\u0103 ca o list\u0103 de concuren\u021bi direc\u021bi pentru acest proiect de 500.000 EUR.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Peisaj competitiv<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Nu sunt enumera\u021bi c\u00e2\u0219tig\u0103tori ai unor contracte similare pentru acest profil de cump\u0103r\u0103tor, iar contextul Hermix \u00eenregistreaz\u0103 zero atribuiri de contracte similare \u0219i zero atribuiri totale de contracte. Prin urmare, nu exist\u0103 o clasificare fiabil\u0103 a contractorilor care s\u0103 poat\u0103 fi reprodus\u0103 pentru aceast\u0103 autoritate \u0219i nicio dovad\u0103 \u00een datele disponibile care ar putea sus\u021bine numirea unui posibil titular.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pentru ofertan\u021bi, consecin\u021ba practic\u0103 este c\u0103 calificarea trebuie s\u0103 se bazeze mai mult pe domeniul de aplicare \u0219i procedura actuale dec\u00e2t pe istoricul furnizorilor specifici cump\u0103r\u0103torului. Contextul pie\u021bei arat\u0103 o activitate substan\u021bial\u0103 \u00een afara acestei autorit\u0103\u021bi: al\u021bi 794 de cump\u0103r\u0103tori sunt asocia\u021bi cu proiecte similare \u00een valoare total\u0103 de 13 miliarde EUR. Aceasta ofer\u0103 un context de pia\u021b\u0103 mai larg pentru lucr\u0103rile de construc\u021bie \u0219i de proiectare aferente, spun\u00e2nd \u00een acela\u0219i timp foarte pu\u021bine lucruri despre cine este cel mai bine pozi\u021bionat pentru aceast\u0103 achizi\u021bie specific\u0103.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">De asemenea, nu exist\u0103 o defalcare pe \u021b\u0103ri, at\u00e2t pentru contractori, c\u00e2t \u0219i pentru o list\u0103 de c\u00e2\u0219tig\u0103tori pentru acest cump\u0103r\u0103tor. Prin urmare, orice concluzie privind concuren\u021ba local\u0103 versus cea interna\u021bional\u0103 ar dep\u0103\u0219i dovezile disponibile. Singurele date geografice care pot fi utilizate direct sunt autoritatea contractant\u0103 irlandez\u0103, locul de executare la nivel de oportunitate listat ca Vest \u0219i Sud-Est \u0219i loca\u021bia la nivel de lot listat\u0103 ca Sud-Est.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Semnale comerciale \u0219i procedurale<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Mai multe caracteristici afecteaz\u0103 modul \u00een care furnizorii ar trebui s\u0103 evalueze oportunitatea \u00eenainte de a decide dac\u0103 s\u0103 liciteze.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Criterii de atribuire: criteriile \u0219i ponderile acestora nu sunt men\u021bionate. Furnizorii au nevoie de cerin\u021bele de achizi\u021bii din portalul de depunere a ofertelor pentru a \u00een\u021belege cum vor fi evalua\u021bi pre\u021bul, calitatea tehnic\u0103 sau al\u021bi factori.<\/li>\n\n\n\n<li>Procedur\u0103 deschis\u0103: achizi\u021bia este listat\u0103 ca fiind deschis\u0103. Nu exist\u0103 o etap\u0103 separat\u0103 de selec\u021bie restr\u00e2ns\u0103 men\u021bionat\u0103 \u00een datele privind oportunitatea, a\u0219adar furnizorii ar trebui s\u0103 se preg\u0103teasc\u0103 \u00een func\u021bie de cerin\u021bele competi\u021biei deschise.<\/li>\n\n\n\n<li>Structur\u0103 cu un singur lot: \u00eentregul proiect de 500.000 EUR se afl\u0103 \u00een Lotul 1. Nu exist\u0103 op\u021biunea de a licita separat pentru conducta principal\u0103 de ap\u0103, rezervor, depozit de tratare sau conducte de serviciu.<\/li>\n\n\n\n<li>Durata contractului: trei luni. Aceasta creeaz\u0103 o perioad\u0103 scurt\u0103 de livrare pentru un pachet integrat de lucr\u0103ri, de\u0219i nu este men\u021bionat\u0103 o dat\u0103 separat\u0103 de mobilizare sau de \u00eencepere.<\/li>\n\n\n\n<li>Termen de depunere: 24 de zile calendaristice de la publicarea din 22 septembrie p\u00e2n\u0103 la termenul limit\u0103 din 16 octombrie 2026. Data deschiderii ofertelor este, de asemenea, 16 octombrie 2026.<\/li>\n\n\n\n<li>Limb\u0103: ofertele sunt permise \u00een limba englez\u0103.<\/li>\n\n\n\n<li>Finan\u021bare UE: achizi\u021bia public\u0103 este listat\u0103 ca nefinan\u021bat\u0103 cu fonduri UE.<\/li>\n\n\n\n<li>Acoperire geografic\u0103: locul de executare la nivel de oportunitate este Vest, Sud-Est, \u00een timp ce locul la nivel de lot este Sud-Est. Furnizorii ar trebui s\u0103 confirme geografia opera\u021bional\u0103 exact\u0103 \u00een cerin\u021bele de achizi\u021bii \u00eenainte de a stabili pre\u021bul logisticii sau al mobiliz\u0103rii.<\/li>\n\n\n\n<li>Rectific\u0103ri: niciuna nu este enumerat\u0103 \u00een intr\u0103rile aferente din cadrul achizi\u021biilor publice.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Clasific\u0103rile CPV consolideaz\u0103 natura fizic\u0103 a lucr\u0103rii: lucr\u0103ri de construc\u021bii, lucr\u0103ri de construc\u021bii pentru conducte, lucr\u0103ri generale de construc\u021bii pentru conducte \u0219i lucr\u0103ri auxiliare pentru conducte de ap\u0103. Combinate cu structura pe lot unic, aceste clasific\u0103ri arat\u0103 c\u0103 componentele de modernizare a aliment\u0103rii cu ap\u0103 enumerate sunt achizi\u021bionate \u00eempreun\u0103, mai degrab\u0103 dec\u00e2t \u00eemp\u0103r\u021bite \u00een loturi separate.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Context strategic \u0219i interpretare<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Aceasta este o oportunitate de lucr\u0103ri publice \u00een valoare de 500.000 EUR, cu o structur\u0103 concentrat\u0103 pe un singur lot. Estimarea de 500.000 EUR este alocat\u0103 unui singur lot, iar antreprenorul trebuie s\u0103 acopere \u00eentregul pachet declarat, mai degrab\u0103 dec\u00e2t o component\u0103 izolat\u0103. Acest lucru face ca \u00eencadrarea \u00een domeniul de aplicare s\u0103 fie mai important\u0103 dec\u00e2t valoarea principal\u0103 \u00een sine: un ofertant are nevoie de capacitate pentru lucr\u0103rile de conducte, depozitare, epurare \u0219i conducte enumerate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Durata contractului de trei luni este cea mai clar\u0103 constr\u00e2ngere comercial\u0103. Nu dezv\u0103luie data de \u00eencepere sau secven\u021bierea detaliat\u0103, dar stabile\u0219te c\u0103 perioada contractat\u0103 este scurt\u0103. Prin urmare, furnizorii care evalueaz\u0103 oportunitatea ar trebui s\u0103 se concentreze asupra faptului dac\u0103 pot livra lucr\u0103rile combinate \u00een perioada respectiv\u0103 odat\u0103 ce contractul \u00eencepe, mai degrab\u0103 dec\u00e2t s\u0103 presupun\u0103 un model de livrare mai lung, de tip cadru.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Informa\u021biile concuren\u021biale specifice cump\u0103r\u0103torilor sunt limitate. F\u0103r\u0103 atribuiri \u00eenregistrate \u0219i f\u0103r\u0103 o list\u0103 de c\u00e2\u0219tig\u0103tori, nu exist\u0103 o baz\u0103 de dovezi pentru calcularea concentr\u0103rii furnizorilor sau identificarea contractorilor existen\u021bi pentru aceast\u0103 autoritate. Cel mai puternic context comparativ se afl\u0103 \u00een afara cump\u0103r\u0103torului, unde Hermix \u00eenregistreaz\u0103 al\u021bi 794 de cump\u0103r\u0103tori cu proiecte similare \u00een valoare de 13 miliarde EUR. Aceast\u0103 cifr\u0103 mai larg\u0103 ofer\u0103 dovezi ale profunzimii pie\u021bei, dar nu \u0219i ale probabilului c\u00e2mp de licita\u021bii pentru Coole Park.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lipsa unor criterii de atribuire dezv\u0103luite limiteaz\u0103, de asemenea, calificarea timpurie. Un contractant poate evalua valoarea, domeniul de aplicare, geografia, procedura, limba \u0219i calendarul pe baza informa\u021biilor disponibile, dar nu poate \u00eenc\u0103 determina cum va echilibra autoritatea factorii comerciali \u0219i tehnici. Acest lucru face ca recuperarea cerin\u021belor complete de achizi\u021bii s\u0103 fie un pas necesar \u00eenainte de alocarea resurselor pentru licita\u021bie.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Utilizatorii Hermix care analizeaz\u0103 aceast\u0103 licita\u021bie pot accesa instantaneu aceste informa\u021bii competitive, inclusiv profiluri detaliate ale contractorilor, modele de cheltuieli ale autorit\u0103\u021bilor \u0219i fluxul complet de re\u00eennoiri, \u00een c\u00e2teva minute, \u00een loc de ore.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Concluzii practice pentru ofertan\u021bi<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Cui i se potrive\u0219te aceast\u0103 ofert\u0103<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Antreprenori de lucr\u0103ri capabili s\u0103 livreze un pachet de infrastructur\u0103 pentru ap\u0103, \u00een valoare de 500.000 EUR, care include o nou\u0103 conduct\u0103 principal\u0103 de ap\u0103, un rezervor de stocare, o hal\u0103 de tratare \u0219i conducte de serviciu.<\/li>\n\n\n\n<li>Furnizori cu capacitatea de a finaliza lucr\u0103rile contractate \u00eentr-o perioad\u0103 de trei luni.<\/li>\n\n\n\n<li>Ofertan\u021bii pot trimite lucr\u0103rile \u00een limba englez\u0103 \u0219i le pot livra \u00een loca\u021bia men\u021bionat\u0103 \u00een sud-est, verific\u00e2nd \u00een acela\u0219i timp dac\u0103 geografia mai larg\u0103 la nivel de oportunitate, orientat\u0103 spre vest \u0219i sud-est, adaug\u0103 alte cerin\u021be.<\/li>\n\n\n\n<li>Antreprenorii se simt confortabil s\u0103 liciteze printr-o procedur\u0103 deschis\u0103, f\u0103r\u0103 a se baza pe un lot separat pentru o singur\u0103 parte a lucr\u0103rilor fizice.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Puncte critice de aten\u021bie<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Termenul limit\u0103 de depunere a ofertelor este 16 octombrie 2026, la doar 24 de zile calendaristice de la publicare. Data deschiderii ofertelor este \u00een aceea\u0219i zi.<\/li>\n\n\n\n<li>Criteriile de atribuire nu sunt men\u021bionate, a\u0219adar cerin\u021bele de achizi\u021bii trebuie verificate \u00eenainte de a se face presupuneri privind scorul sau ponderarea pre\u021bului.<\/li>\n\n\n\n<li>Durata contractului este de trei luni. Nu este men\u021bionat\u0103 o dat\u0103 separat\u0103 de mobilizare.<\/li>\n\n\n\n<li>Achizi\u021bia este un lot \u00een valoare de 500.000,00 EUR. Cele patru componente de lucr\u0103ri enumerate nu sunt oferite ca loturi separate.<\/li>\n\n\n\n<li>Geografia trebuie verificat\u0103 cu aten\u021bie: intrarea la nivel de oportunitate listeaz\u0103 Vest, Sud-Est, \u00een timp ce Lotul 1 listeaz\u0103 Sud-Est.<\/li>\n\n\n\n<li>Nu este listat\u0103 nicio achizi\u021bie public\u0103 sau rectificare anterioar\u0103 conex\u0103, prin urmare nu exist\u0103 un istoric al modific\u0103rilor \u00een intr\u0103rile conexe disponibile pentru revizuire.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Concluzie<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Modernizarea aliment\u0103rii cu ap\u0103 a sistemului Coole Park este o achizi\u021bie public\u0103 de lucr\u0103ri \u00een valoare de 500.000 EUR, cu o durat\u0103 de trei luni, care acoper\u0103 patru componente de infrastructur\u0103 clar identificate \u00eentr-un singur lot. Profilul cump\u0103r\u0103torului ofer\u0103 foarte pu\u021bine dovezi istorice ale atribuirii, astfel \u00eenc\u00e2t furnizorii nu se pot baza pe modelele \u00eenregistrate ale contractelor existente atunci c\u00e2nd decid dac\u0103 s\u0103 o continue.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Prin urmare, o calificare structurat\u0103 ar trebui s\u0103 se concentreze pe potrivirea domeniului de aplicare, perioada scurt\u0103 a contractului, cerin\u021bele geografice \u0219i metodologia detaliat\u0103 de atribuire odat\u0103 ce este preluat\u0103 de pe portalul de achizi\u021bii. Ace\u0219ti factori ofer\u0103 cea mai clar\u0103 baz\u0103 pentru a decide dac\u0103 oportunitatea merit\u0103 resursele licitate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Creeaz\u0103-\u021bi contul gratuit ast\u0103zi la<\/strong> <a href=\"https:\/\/hermix.com\/ro\/inscrie-te\/\">https:\/\/hermix.com\/sign-up\/<\/a> \u0219i c\u00e2\u0219tiga\u021bi mai multe contracte publice cu ajutorul abord\u0103rii bazate pe date, care ajut\u0103 companiile s\u0103 aib\u0103 succes constant \u00een v\u00e2nz\u0103rile B2G \u00een \u00eentreaga Europ\u0103.<\/p>","protected":false},"excerpt":{"rendered":"<p>View full tender data: https:\/\/app.hermix.com\/opportunities\/00652874-2026 A EUR 500,000 works contract covers a new watermain, water storage tank, treatment shed and service ducting at Coole Park Nature Reserve, with a three-month delivery period and one integrated lot. The Department of Housing, Local Government and Heritage is procuring a compact water infrastructure upgrade at Coole Park Nature [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":11430,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","inline_featured_image":false,"page_builder":"","footnotes":"","_ppma_block_editor_authors":""},"categories":[35],"tags":[],"ppma_author":[16],"class_list":["post-11429","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tender-analysis"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"Explore the \u20ac500,000 Coole Park water supply upgrade tender in Ireland. Review the project scope, requirements, timeline and competitive insights with Hermix AI.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Ana-Maria Puiu\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"ro_RO\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Hermix - Win Public Contracts with the Power of AI\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade\" \/>\n\t\t<meta property=\"og:description\" content=\"Explore the \u20ac500,000 Coole Park water supply upgrade tender in Ireland. Review the project scope, requirements, timeline and competitive insights with Hermix AI.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Coole-Park-Water-Supply-Upgrade_featured-image.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Coole-Park-Water-Supply-Upgrade_featured-image.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-30T13:12:14+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-30T13:12:15+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/hermixapp\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Explore the \u20ac500,000 Coole Park water supply upgrade tender in Ireland. Review the project scope, requirements, timeline and competitive insights with Hermix AI.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Coole-Park-Water-Supply-Upgrade_featured-image.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/#blogposting\",\"name\":\"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade\",\"headline\":\"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade\",\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/ana-maria-puiu\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Coole-Park-Water-Supply-Upgrade_featured-image.png\",\"width\":1200,\"height\":630,\"caption\":\"Coole Park Water Supply Upgrade\"},\"datePublished\":\"2026-10-30T15:12:14+02:00\",\"dateModified\":\"2026-10-30T15:12:15+02:00\",\"inLanguage\":\"ro-RO\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/#webpage\"},\"articleSection\":\"Tender Analysis, Ana-Maria Puiu\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hermix.com\\\/ro\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/category\\\/tender-analysis\\\/#listItem\",\"position\":2,\"name\":\"Tender Analysis\",\"item\":\"https:\\\/\\\/hermix.com\\\/ro\\\/category\\\/tender-analysis\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/#listItem\",\"name\":\"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/#listItem\",\"position\":3,\"name\":\"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#organization\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"url\":\"https:\\\/\\\/hermix.com\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.hermix.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hermix_logo.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/hermixapp\",\"https:\\\/\\\/twitter.com\\\/Hermix_sw\",\"https:\\\/\\\/www.instagram.com\\\/hermix_sw\\\/\",\"https:\\\/\\\/be.linkedin.com\\\/company\\\/hermix\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/ana-maria-puiu\\\/#author\",\"url\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/ana-maria-puiu\\\/\",\"name\":\"Ana-Maria Puiu\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/#webpage\",\"url\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/\",\"name\":\"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade\",\"description\":\"Explore the \\u20ac500,000 Coole Park water supply upgrade tender in Ireland. Review the project scope, requirements, timeline and competitive insights with Hermix AI.\",\"inLanguage\":\"ro-RO\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/ana-maria-puiu\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/ana-maria-puiu\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Coole-Park-Water-Supply-Upgrade_featured-image.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/#mainImage\",\"width\":1200,\"height\":630,\"caption\":\"Coole Park Water Supply Upgrade\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\\\/#mainImage\"},\"datePublished\":\"2026-10-30T15:12:14+02:00\",\"dateModified\":\"2026-10-30T15:12:15+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/hermix.com\\\/ro\\\/\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"inLanguage\":\"ro-RO\",\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Licita\u021bie public\u0103 a Departamentului pentru Locuin\u021be, Administra\u021bie Local\u0103 \u0219i Patrimoniu pentru modernizarea aliment\u0103rii cu ap\u0103 din Coole Park","description":"Exploreaz\u0103 licita\u021bia de 500.000 de euro pentru modernizarea aliment\u0103rii cu ap\u0103 a parcului Coole din Irlanda. Examineaz\u0103 domeniul de aplicare al proiectului, cerin\u021bele, calendarul \u0219i informa\u021biile despre concuren\u021b\u0103 cu ajutorul inteligen\u021bei artificiale Hermix.","canonical_url":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/#blogposting","name":"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade","headline":"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade","author":{"@id":"https:\/\/hermix.com\/ro\/author\/ana-maria-puiu\/#author"},"publisher":{"@id":"https:\/\/hermix.com\/ro\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Coole-Park-Water-Supply-Upgrade_featured-image.png","width":1200,"height":630,"caption":"Coole Park Water Supply Upgrade"},"datePublished":"2026-10-30T15:12:14+02:00","dateModified":"2026-10-30T15:12:15+02:00","inLanguage":"ro-RO","mainEntityOfPage":{"@id":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/#webpage"},"isPartOf":{"@id":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/#webpage"},"articleSection":"Tender Analysis, Ana-Maria Puiu"},{"@type":"BreadcrumbList","@id":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/#listItem","position":1,"name":"Home","item":"https:\/\/hermix.com\/ro\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/#listItem","position":2,"name":"Tender Analysis","item":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/#listItem","name":"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade"},"previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/#listItem","position":3,"name":"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade","previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}}]},{"@type":"Organization","@id":"https:\/\/hermix.com\/ro\/#organization","name":"Hermix","description":"Win Public Contracts with the Power of AI","url":"https:\/\/hermix.com\/ro\/","logo":{"@type":"ImageObject","url":"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png","@id":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/#organizationLogo"},"image":{"@id":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/hermixapp","https:\/\/twitter.com\/Hermix_sw","https:\/\/www.instagram.com\/hermix_sw\/","https:\/\/be.linkedin.com\/company\/hermix"]},{"@type":"Person","@id":"https:\/\/hermix.com\/ro\/author\/ana-maria-puiu\/#author","url":"https:\/\/hermix.com\/ro\/author\/ana-maria-puiu\/","name":"Ana-Maria Puiu"},{"@type":"WebPage","@id":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/#webpage","url":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/","name":"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade","description":"Explore the \u20ac500,000 Coole Park water supply upgrade tender in Ireland. Review the project scope, requirements, timeline and competitive insights with Hermix AI.","inLanguage":"ro-RO","isPartOf":{"@id":"https:\/\/hermix.com\/ro\/#website"},"breadcrumb":{"@id":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/#breadcrumblist"},"author":{"@id":"https:\/\/hermix.com\/ro\/author\/ana-maria-puiu\/#author"},"creator":{"@id":"https:\/\/hermix.com\/ro\/author\/ana-maria-puiu\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Coole-Park-Water-Supply-Upgrade_featured-image.png","@id":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/#mainImage","width":1200,"height":630,"caption":"Coole Park Water Supply Upgrade"},"primaryImageOfPage":{"@id":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/#mainImage"},"datePublished":"2026-10-30T15:12:14+02:00","dateModified":"2026-10-30T15:12:15+02:00"},{"@type":"WebSite","@id":"https:\/\/hermix.com\/ro\/#website","url":"https:\/\/hermix.com\/ro\/","name":"Hermix","description":"Win Public Contracts with the Power of AI","inLanguage":"ro-RO","publisher":{"@id":"https:\/\/hermix.com\/ro\/#organization"}}]},"og:locale":"ro_RO","og:site_name":"Hermix - Win Public Contracts with the Power of AI","og:type":"article","og:title":"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade","og:description":"Explore the \u20ac500,000 Coole Park water supply upgrade tender in Ireland. Review the project scope, requirements, timeline and competitive insights with Hermix AI.","og:url":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/","og:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Coole-Park-Water-Supply-Upgrade_featured-image.png","og:image:secure_url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Coole-Park-Water-Supply-Upgrade_featured-image.png","og:image:width":1200,"og:image:height":630,"article:published_time":"2026-10-30T13:12:14+00:00","article:modified_time":"2026-10-30T13:12:15+00:00","article:publisher":"https:\/\/www.facebook.com\/hermixapp","twitter:card":"summary_large_image","twitter:site":"@Hermix_sw","twitter:title":"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade","twitter:description":"Explore the \u20ac500,000 Coole Park water supply upgrade tender in Ireland. Review the project scope, requirements, timeline and competitive insights with Hermix AI.","twitter:creator":"@Hermix_sw","twitter:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Coole-Park-Water-Supply-Upgrade_featured-image.png"},"aioseo_meta_data":{"post_id":"11429","title":"Titlu_post\u0103ri #","description":"Exploreaz\u0103 licita\u021bia de 500.000 de euro pentru modernizarea aliment\u0103rii cu ap\u0103 a parcului Coole din Irlanda. Examineaz\u0103 domeniul de aplicare al proiectului, cerin\u021bele, calendarul \u0219i informa\u021biile despre concuren\u021b\u0103 cu ajutorul inteligen\u021bei artificiale Hermix.","keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-10-30 13:12:15","updated":"2026-10-30 13:50:36"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/ro\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/ro\/category\/tender-analysis\/\" title=\"Tender Analysis\">Tender Analysis<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tDepartment of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/hermix.com\/ro\/"},{"label":"Tender Analysis","link":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/"},{"label":"Department of Housing, Local Government and Heritage public tender for Coole Park water supply upgrade","link":"https:\/\/hermix.com\/ro\/department-of-housing-local-government-and-heritage-public-tender-for-coole-park-water-supply-upgrade\/"}],"authors":[{"term_id":16,"user_id":2,"is_guest":0,"slug":"ana-maria-puiu","display_name":"Ana-Maria Puiu","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/daf02b346ef383e82c6abf3984608b2753f0bfd78c4938ff758ad3f789eda467?s=96&d=mm&r=g","avatar_alt":"","avatar_decorative":"","author_category":"","first_name":"","last_name":"","user_url":"","job_title":"","description":""}],"_links":{"self":[{"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/posts\/11429","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/comments?post=11429"}],"version-history":[{"count":1,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/posts\/11429\/revisions"}],"predecessor-version":[{"id":11431,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/posts\/11429\/revisions\/11431"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/media\/11430"}],"wp:attachment":[{"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/media?parent=11429"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/categories?post=11429"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/tags?post=11429"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/ppma_author?post=11429"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}