{"id":11197,"date":"2026-10-09T11:42:37","date_gmt":"2026-10-09T08:42:37","guid":{"rendered":"https:\/\/hermix.com\/?p=11197"},"modified":"2026-10-09T11:42:40","modified_gmt":"2026-10-09T08:42:40","slug":"aktsiaselts-keila-vesi-licitatie-publica-pentru-scoala-keila-constructia-cladirii-cu-energie-aproape-zero","status":"publish","type":"post","link":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/","title":{"rendered":"Aktsiaselts Keila Vesi licita\u021bie public\u0103 pentru construc\u021bia de cl\u0103diri cu energie aproape zero a \u0219colii Keila"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Vede\u021bi datele complete ale licita\u021biei: <a href=\"https:\/\/app.hermix.com\/opportunities\/00650897-2026\">https:\/\/app.hermix.com\/opportunities\/00650897-2026<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Un contract de construc\u021bie \u00een valoare de 7,015 milioane de euro, pe 20 de luni, va \u00eenlocui blocul central al \u0218colii Keila de la Pargi 2e cu o cl\u0103dire de 3.269,3 mp, cu consum de energie aproape zero, integrat\u0103 cu structuri existente \u0219i istorice.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Aktsiaselts Keila Vesi achizi\u021bioneaz\u0103 un pachet unic de lucr\u0103ri de construc\u021bie pentru o cl\u0103dire \u0219colar\u0103 nou\u0103, cu consum de energie aproape zero, \u00een Keila, nordul Estoniei. Lucr\u0103rile combin\u0103 demolarea, construc\u021bia unei noi cl\u0103diri, lucr\u0103rile exterioare \u0219i integrarea fizic\u0103 cu dou\u0103 elemente de construc\u021bie existente, toate \u00eentr-o singur\u0103 etap\u0103 de construc\u021bie planificat\u0103.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Valoarea estimat\u0103 este de 7.015.000,00 EUR, iar durata contractului este de 20 de luni. Proiectul este listat ca fiind finan\u021bat de UE, iar achizi\u021bia identific\u0103 cofinan\u021barea din partea Riigi Tugiteenuste Keskus (RTK) \u00een cadrul proiectului climatic Kliima 2.9.01.25-0137.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Prezentare general\u0103 a oportunit\u0103\u021bii<\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Autoritatea contractant\u0103:<\/strong> AKTSIASELTS KEILA VESI<\/li>\n\n\n\n<li><strong>Tipul cump\u0103r\u0103torului:<\/strong> Organism de drept public<\/li>\n\n\n\n<li><strong>Activitate principal\u0103:<\/strong> Activit\u0103\u021bi legate de ap\u0103<\/li>\n\n\n\n<li><strong>Num\u0103r de referin\u021b\u0103:<\/strong> 315399-0000<\/li>\n\n\n\n<li><strong>ID document:<\/strong> 00650897-2026<\/li>\n\n\n\n<li><strong>Referin\u021b\u0103 TED:<\/strong> 2026\/S 183-00650897<\/li>\n\n\n\n<li><strong>Titlul ofertei:<\/strong> \u0218coala Keila Pargimaja Lucr\u0103ri de construc\u021bie a cl\u0103dirilor cu energie aproape zero (Keila Kooli Pargimaja liginullenergia korpuse ehitust\u00f6\u00f6d)<\/li>\n\n\n\n<li><strong>Contact:<\/strong> Veiko Kaufmann, info@keilavesi.ee, +372 5026470<\/li>\n\n\n\n<li><strong>Domeniul de activitate:<\/strong> Construc\u021bia cl\u0103dirii cu consum de energie aproape zero a \u0218colii Keila din Pargimaja, inclusiv demolarea blocului \u0219colar central existent, construc\u021bia cl\u0103dirii \u00eenlocuitoare \u0219i lucr\u0103ri exterioare, precum \u0219i conectarea la blocul de cl\u0103diri Pargi 2e\/1 \u0219i la cl\u0103direa istoric\u0103 de la Pargi 2.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Demolarea blocului \u0219colar central de la Pargi 2e din Keila.<\/li>\n\n\n\n<li>Construc\u021bia unei cl\u0103diri compacte de \u00eenlocuire, cu consum de energie aproape zero, cu o suprafa\u021b\u0103 net\u0103 \u00eenchis\u0103 de 3.269,3 mp.<\/li>\n\n\n\n<li>Lucr\u0103ri exterioare \u0219i integrare cu blocul existent Pargi 2e\/1 \u0219i cl\u0103direa istoric\u0103 de la Pargi 2.<\/li>\n\n\n\n<li>Execu\u021bia ca o etap\u0103 de construc\u021bie.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Structura lotului:<\/strong> Lotul 0, \u0218coala Keila, lucr\u0103ri de construc\u021bie a unei cl\u0103diri Pargimaja cu consum de energie aproape zero, 7.015.000,00 \u20ac<\/li>\n\n\n\n<li><strong>Locul execu\u021biei:<\/strong> Pohja-Eesti (Estonia de Nord)<\/li>\n\n\n\n<li><strong>Valoare total\u0103 estimat\u0103:<\/strong> \u20ac7,015,000.00<\/li>\n\n\n\n<li><strong>Tipul contractului:<\/strong> Fabric\u0103<\/li>\n\n\n\n<li><strong>Durata contractului:<\/strong> 20 de luni<\/li>\n\n\n\n<li><strong>Tipul procedurii:<\/strong> Deschide<\/li>\n\n\n\n<li><strong>Criterii de premiere:<\/strong> Pre\u0163<\/li>\n\n\n\n<li><strong>Data public\u0103rii:<\/strong> 22 septembrie 2026<\/li>\n\n\n\n<li><strong>Termen limit\u0103 de depunere:<\/strong> 16 octombrie 2026<\/li>\n\n\n\n<li><strong>Data deschiderii ofertelor:<\/strong> 16 octombrie 2026<\/li>\n\n\n\n<li><strong>Cerin\u021be lingvistice:<\/strong> Estonia<\/li>\n\n\n\n<li><strong>Finan\u021bare UE:<\/strong> Da<\/li>\n\n\n\n<li><strong>Portal de trimitere:<\/strong> https:\/\/riigihanked.riik.ee\/rhr-web\/#\/procurement\/10807784\/tenders<\/li>\n\n\n\n<li><strong>Surs\u0103:<\/strong> TED<\/li>\n\n\n\n<li><strong>Notific\u0103ri conexe:<\/strong> Nu este inclus\u0103 nicio notificare de informare prealabil\u0103 separat\u0103 sau nicio rectificare odat\u0103 cu aceast\u0103 oportunitate.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>E\u0219ti gata s\u0103 califici licita\u021bii de acest gen mai rapid? Creeaz\u0103-\u021bi contul gratuit Hermix la<\/strong> <a href=\"https:\/\/hermix.com\/ro\/inscrie-te\/\">https:\/\/hermix.com\/sign-up\/<\/a> \u0219i accesa\u021bi analize ale licita\u021biilor bazate pe inteligen\u021b\u0103 artificial\u0103, informa\u021bii competitive \u0219i monitorizare automat\u0103 pe pia\u021ba european\u0103 de achizi\u021bii publice, \u00een valoare de 2 trilioane de euro.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Autoritatea \u0219i contextul achizi\u021biilor publice<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">AKTSIASELTS KEILA VESI este \u00eenregistrat\u0103 ca organism de drept public \u00een Estonia, av\u00e2nd ca principal\u0103 activitate activit\u0103\u021bi legate de ap\u0103. Pentru aceast\u0103 achizi\u021bie public\u0103, este autoritatea contractant\u0103 pentru un proiect de construc\u021bie a unei \u0219coli axat pe \u00eenlocuirea blocului central al complexului \u0219colar Keila Pargimaja cu o cl\u0103dire cu consum de energie aproape zero.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Profilul cump\u0103r\u0103torului este neobi\u0219nuit de rar \u00een istoricul achizi\u021biilor disponibile. Hermix nu \u00eenregistreaz\u0103 licita\u021bii deschise, re\u00eennoiri \u0219i atribuiri de contracte pentru acest cump\u0103r\u0103tor. Cu toate acestea, profilul prezint\u0103 o notificare prealabil\u0103 similar\u0103 \u00een valoare de 7 milioane de euro \u0219i o notificare prealabil\u0103 \u00een total, tot \u00een valoare de 7 milioane de euro. Aceasta este aproape de valoarea de 7,015 milioane de euro a contractului de construc\u021bie actual, dar sec\u021biunea de notific\u0103ri aferente nu leag\u0103 o notificare anterioar\u0103 separat\u0103 direct de aceast\u0103 oportunitate.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Licita\u021bii deschise similare: 0, 0 \u20ac<\/li>\n\n\n\n<li>Toate licita\u021biile deschise: 0, 0 \u20ac<\/li>\n\n\n\n<li>Re\u00eennoiri similare: 0, 0 \u20ac<\/li>\n\n\n\n<li>Toate re\u00eennoirile: 0, 0 \u20ac<\/li>\n\n\n\n<li>Atribuiri de contracte similare: 0, 0 \u20ac<\/li>\n\n\n\n<li>Toate contractele atribuite: 0, 0 \u20ac<\/li>\n\n\n\n<li>Notific\u0103ri anterioare similare: 1, 7 milioane EUR<\/li>\n\n\n\n<li>Toate notific\u0103rile prealabile: 1, 7 milioane EUR<\/li>\n\n\n\n<li>Al\u021bi cump\u0103r\u0103tori cu proiecte similare: 329, 3,5 miliarde de euro<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Setul mai larg de compara\u021bii este mult mai mare dec\u00e2t \u00eenregistrarea specific\u0103 a cump\u0103r\u0103torilor. Hermix urm\u0103re\u0219te al\u021bi 329 de cump\u0103r\u0103tori cu proiecte similare \u00een valoare total\u0103 de 3,5 miliarde de euro, ceea ce ofer\u0103 o referin\u021b\u0103 de pia\u021b\u0103 mai larg\u0103, chiar dac\u0103 acest cump\u0103r\u0103tor nu are un istoric de atribuire \u00eenregistrat \u00een profilul disponibil.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Peisaj competitiv<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Nu sunt enumera\u021bi c\u00e2\u0219tig\u0103tori ai unor contracte similare pentru AKTSIASELTS KEILA VESI, iar profilul cump\u0103r\u0103torului \u00eenregistreaz\u0103 zero atribuiri de contracte similare \u0219i zero atribuiri de contracte \u00een total. Prin urmare, nu exist\u0103 un clasament specific c\u00e2\u0219tig\u0103torilor \u00een func\u021bie de cump\u0103r\u0103tor, un model de operator titular sau o distribu\u021bie a contractantului \u00een func\u021bie de \u021bar\u0103 pentru a fi analizat\u0103 pentru aceast\u0103 oportunitate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pentru ofertan\u021bi, consecin\u021ba practic\u0103 este c\u0103 eviden\u021ba disponibil\u0103 nu ofer\u0103 dovezi ale furnizorilor existen\u021bi sau ale unui grup concentrat de c\u00e2\u0219tig\u0103tori istorici pentru acest cump\u0103r\u0103tor. Evaluarea competitiv\u0103 trebuie s\u0103 se bazeze mai mult pe cerin\u021bele achizi\u021biei curente \u0219i pe informa\u021bii mai ample despre proiecte comparabile, dec\u00e2t pe un istoric stabilit al atribuirilor de c\u0103tre cump\u0103r\u0103tori.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Contextul mai larg al pie\u021bei este substan\u021bial: al\u021bi 329 de cump\u0103r\u0103tori sunt asocia\u021bi cu proiecte similare \u00een valoare de 3,5 miliarde de euro. Acest set de compara\u021bie indic\u0103 faptul c\u0103 tipul de lucr\u0103ri de construc\u021bii este reprezentat pe o pia\u021b\u0103 mult mai larg\u0103 din sectorul public, chiar dac\u0103 setul de date specific cump\u0103r\u0103torilor de aici este limitat.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Semnale comerciale \u0219i procedurale<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Achizi\u021biile publice utilizeaz\u0103 o procedur\u0103 deschis\u0103 \u0219i un singur lot. Prin urmare, furnizorii se confrunt\u0103 cu un pachet integrat de lucr\u0103ri, mai degrab\u0103 dec\u00e2t cu pachete separate pentru demolare, construc\u021bie, lucr\u0103ri exterioare sau integrarea cl\u0103dirilor. Orice ofertant trebuie s\u0103 \u00ee\u0219i evalueze capacitatea de a livra \u00eentreaga gam\u0103 \u00een cadrul aceluia\u0219i contract.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Criteriul de atribuire publicat este Pre\u021bul. Nu este men\u021bionat\u0103 o ponderare separat\u0103 a calit\u0103\u021bii. Acest lucru face ca disciplina de pre\u021b s\u0103 fie deosebit de important\u0103, \u00een timp ce ofertan\u021bii trebuie s\u0103 \u00eendeplineasc\u0103 \u00een continuare cerin\u021bele tehnice, de excludere \u0219i de calificare men\u021bionate \u00een materialele licita\u021biei. Achizi\u021bia nu ofer\u0103 informa\u021bii separate privind garan\u021bia financiar\u0103 \u00een datele disponibile privind oportunitatea.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Perioada contractual\u0103 de 20 de luni trebuie s\u0103 includ\u0103 demolarea blocului central existent, construc\u021bia cl\u0103dirii de \u00eenlocuire de 3.269,3 mp, lucr\u0103rile exterioare \u0219i conectarea la cele dou\u0103 elemente ale cl\u0103dirii p\u0103strate. Domeniul de aplicare prevede c\u0103 construc\u021bia este planificat\u0103 \u00eentr-o singur\u0103 etap\u0103, astfel \u00eenc\u00e2t programul trebuie s\u0103 ia \u00een considerare aceste activit\u0103\u021bi conexe \u00eentr-o singur\u0103 secven\u021b\u0103 de livrare.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Anun\u021bul de achizi\u021bii publice a fost publicat pe 22 septembrie 2026 \u0219i se \u00eencheie pe 16 octombrie 2026, termenul de depunere a ofertelor fiind de 24 de zile calendaristice. Data de deschidere a ofertelor este, de asemenea, 16 octombrie 2026. Ofertele trebuie depuse \u00een limba eston\u0103, aceasta fiind o cerin\u021b\u0103 practic\u0103 de participare pentru furnizorii care preg\u0103tesc oferta \u0219i materialele justificative.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Finan\u021barea UE este listat\u0103 ca Da. Domeniul de aplicare precizeaz\u0103, de asemenea, c\u0103 lucr\u0103rile sunt cofinan\u021bate de Riigi Tugiteenuste Keskus \u00een cadrul proiectului Kliima 2.9.01.25-0137 \u0219i face referire la Regulamentul nr. 49 din 8 decembrie 2020 privind sprijinul pentru construirea de cl\u0103diri cu consum de energie aproape egal cu zero de c\u0103tre unit\u0103\u021bile administra\u021biei publice locale. Prin urmare, ofertan\u021bii ar trebui s\u0103 \u021bin\u0103 cont de contextul finan\u021b\u0103rii atunci c\u00e2nd revizuiesc cerin\u021bele licita\u021biei \u0219i obliga\u021biile de livrare.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Context strategic \u0219i interpretare<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Cea mai puternic\u0103 caracteristic\u0103 comercial\u0103 a acestei oportunit\u0103\u021bi este combinarea unui pachet unic de construc\u021bii integrat \u0219i a unui criteriu de evaluare publicat doar pe baz\u0103 de pre\u021b. Proiectul nu se limiteaz\u0103 la construirea unei noi cl\u0103diri independente. Acesta necesit\u0103 demolarea unui bloc central existent, construirea unei structuri de \u00eenlocuire, lucr\u0103ri exterioare \u0219i conectarea fizic\u0103 la cl\u0103dirile p\u0103strate, inclusiv o cl\u0103dire istoric\u0103 de la Pargi 2.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Aceast\u0103 cerin\u021b\u0103 de integrare face ca domeniul de aplicare al proiectului s\u0103 fie mai complex din punct de vedere opera\u021bional dec\u00e2t sugereaz\u0103 zona principal\u0103 de construc\u021bie. Se a\u0219teapt\u0103 ca antreprenorul s\u0103 livreze proiectul \u00eentr-o singur\u0103 etap\u0103 de construc\u021bie, astfel \u00eenc\u00e2t secven\u021bierea, interfe\u021bele dintre structurile vechi \u0219i cele noi \u0219i coordonarea activit\u0103\u021bilor de demolare \u0219i construc\u021bie se afl\u0103 toate \u00een cadrul aceluia\u0219i pachet de lucr\u0103ri. Durata de 20 de luni ofer\u0103 fereastra oficial\u0103 de livrare pentru acel domeniu de aplicare combinat.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Structura de finan\u021bare este, de asemenea, relevant\u0103 pentru calificare. Proiectul este identificat ca fiind finan\u021bat de UE \u0219i cofinan\u021bat prin RTK \u00een cadrul unui proiect \u0219i regulament climatic denumit. Dosarul achizi\u021biilor nu dezv\u0103luie condi\u021bii suplimentare de finan\u021bare, astfel \u00eenc\u00e2t ofertan\u021bii trebuie s\u0103 verifice cerin\u021bele aplicabile direct \u00een materialele licita\u021biei, \u00een loc s\u0103 \u00ee\u0219i asume obliga\u021bii care nu sunt men\u021bionate \u00een datele oportunit\u0103\u021bii.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Istoricul concuren\u021bial specific cump\u0103r\u0103torilor ofer\u0103 pu\u021bine \u00eendrum\u0103ri \u00een acest sens. \u00cen absen\u021ba unor atribuiri de contracte, re\u00eennoiri sau licita\u021bii deschise \u00eenregistrate pentru autoritate, nu exist\u0103 un model vizibil al titularilor care s\u0103 sus\u021bin\u0103 o evaluare competitiv\u0103. Prin urmare, cea mai util\u0103 compara\u021bie provine de la ceilal\u021bi 329 de cump\u0103r\u0103tori asocia\u021bi cu proiecte similare \u00een valoare de 3,5 miliarde de euro, combinate cu cerin\u021bele tehnice \u0219i procedurale ale acestui contract specific.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Utilizatorii Hermix care analizeaz\u0103 aceast\u0103 licita\u021bie pot accesa instantaneu aceste informa\u021bii competitive, inclusiv profiluri detaliate ale contractorilor, modele de cheltuieli ale autorit\u0103\u021bilor \u0219i fluxul complet de re\u00eennoiri, \u00een c\u00e2teva minute, \u00een loc de ore.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Concluzii practice pentru ofertan\u021bi<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Cui i se potrive\u0219te aceast\u0103 ofert\u0103<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Antreprenori de construc\u021bii capabili s\u0103 livreze un proiect integrat de construc\u021bie a unei \u0219coli, care s\u0103 acopere demolarea, lucr\u0103rile de construc\u021bie nou\u0103, lucr\u0103rile exterioare \u0219i conectarea la structurile p\u0103strate.<\/li>\n\n\n\n<li>Furnizori cu capacitatea de a livra un contract de lucr\u0103ri \u00een valoare de 7,015 milioane EUR pe o perioad\u0103 de 20 de luni \u00een nordul Estoniei.<\/li>\n\n\n\n<li>Ofertan\u021bii pot preg\u0103ti \u0219i depune oferta \u00een limba eston\u0103 \u00een termenul de 24 de zile pentru depunere.<\/li>\n\n\n\n<li>Antreprenorii se simt confortabil s\u0103 concureze \u00een cadrul unei structuri cu un singur lot, unde criteriul de atribuire publicat este pre\u021bul.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Puncte critice de aten\u021bie<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Termen limit\u0103 de depunere: 16 octombrie 2026, 24 de zile calendaristice de la publicare.<\/li>\n\n\n\n<li>Deschiderea ofertelor: 16 octombrie 2026.<\/li>\n\n\n\n<li>Limba: eston\u0103.<\/li>\n\n\n\n<li>Structura de livrare: o etap\u0103 de construc\u021bie care include demolarea, construc\u021bia nou\u0103, lucr\u0103rile exterioare \u0219i integrarea cl\u0103dirii.<\/li>\n\n\n\n<li>Finan\u021bare: Finan\u021bat\u0103 de UE \u0219i cofinan\u021bat\u0103 de RTK \u00een cadrul proiectului Kliima 2.9.01.25-0137, Regulamentul nr. 49 din 8 decembrie 2020 fiind men\u021bionat \u00een domeniul de aplicare.<\/li>\n\n\n\n<li>Notific\u0103ri conexe: nu este listat\u0103 nicio rectificare separat\u0103 sau nicio \u00eenscriere anterioar\u0103 la licita\u021bie conex\u0103 pentru aceast\u0103 oportunitate.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Concluzie<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Aceast\u0103 achizi\u021bie public\u0103 \u00een valoare de 7,015 milioane EUR combin\u0103 un program de construc\u021bii de \u00eenlocuire clar definit cu o procedur\u0103 deschis\u0103, cu un singur lot, \u0219i o perioad\u0103 de livrare de 20 de luni. Setul de date istorice specifice cump\u0103r\u0103torului este limitat, ceea ce face ca o calificare atent\u0103 \u00een raport cu domeniul de aplicare actual, contextul de finan\u021bare, cerin\u021bele lingvistice \u0219i criteriul pre\u021bului s\u0103 fie deosebit de important\u0103 pentru deciziile privind licita\u021biile.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Creeaz\u0103-\u021bi contul gratuit ast\u0103zi la <a href=\"https:\/\/hermix.com\/ro\/inscrie-te\/\">https:\/\/hermix.com\/sign-up\/<\/a> \u0219i c\u00e2\u0219tiga\u021bi mai multe contracte publice cu ajutorul abord\u0103rii bazate pe date, care ajut\u0103 companiile s\u0103 aib\u0103 succes constant \u00een v\u00e2nz\u0103rile B2G \u00een \u00eentreaga Europ\u0103.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>View full tender data: https:\/\/app.hermix.com\/opportunities\/00650897-2026 A \u20ac7.015 million, 20-month construction contract will replace the central block of Keila School at Pargi 2e with a 3,269.3 sqm nearly zero-energy building integrated with existing and historic structures. Aktsiaselts Keila Vesi is procuring a single construction package for a new nearly zero-energy school building in Keila, North Estonia. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":11198,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","inline_featured_image":false,"page_builder":"","footnotes":"","_ppma_block_editor_authors":""},"categories":[35],"tags":[],"ppma_author":[16],"class_list":["post-11197","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tender-analysis"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"Explore a \u20ac7.015M public tender for Keila School in Estonia, covering nearly zero-energy building construction, a 20-month contract and key bidding details.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Ana-Maria Puiu\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"ro_RO\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Hermix - Win Public Contracts with the Power of AI\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction\" \/>\n\t\t<meta property=\"og:description\" content=\"Explore a \u20ac7.015M public tender for Keila School in Estonia, covering nearly zero-energy building construction, a 20-month contract and key bidding details.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Keila-Kooli-Pargimaja-liginullenergia-korpuse-ehitustood_featured-image.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Keila-Kooli-Pargimaja-liginullenergia-korpuse-ehitustood_featured-image.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-09T08:42:37+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-09T08:42:40+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/hermixapp\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Explore a \u20ac7.015M public tender for Keila School in Estonia, covering nearly zero-energy building construction, a 20-month contract and key bidding details.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Keila-Kooli-Pargimaja-liginullenergia-korpuse-ehitustood_featured-image.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/#blogposting\",\"name\":\"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction\",\"headline\":\"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction\",\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/ana-maria-puiu\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Keila-Kooli-Pargimaja-liginullenergia-korpuse-ehitustood_featured-image.png\",\"width\":1200,\"height\":628,\"caption\":\"Keila Kooli Pargimaja liginullenergia korpuse ehitust\\u00f6\\u00f6d\"},\"datePublished\":\"2026-10-09T11:42:37+03:00\",\"dateModified\":\"2026-10-09T11:42:40+03:00\",\"inLanguage\":\"ro-RO\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/#webpage\"},\"articleSection\":\"Tender Analysis, Ana-Maria Puiu\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hermix.com\\\/ro\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/category\\\/tender-analysis\\\/#listItem\",\"position\":2,\"name\":\"Tender Analysis\",\"item\":\"https:\\\/\\\/hermix.com\\\/ro\\\/category\\\/tender-analysis\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/#listItem\",\"name\":\"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/#listItem\",\"position\":3,\"name\":\"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#organization\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"url\":\"https:\\\/\\\/hermix.com\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.hermix.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hermix_logo.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/hermixapp\",\"https:\\\/\\\/twitter.com\\\/Hermix_sw\",\"https:\\\/\\\/www.instagram.com\\\/hermix_sw\\\/\",\"https:\\\/\\\/be.linkedin.com\\\/company\\\/hermix\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/ana-maria-puiu\\\/#author\",\"url\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/ana-maria-puiu\\\/\",\"name\":\"Ana-Maria Puiu\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/#webpage\",\"url\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/\",\"name\":\"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction\",\"description\":\"Explore a \\u20ac7.015M public tender for Keila School in Estonia, covering nearly zero-energy building construction, a 20-month contract and key bidding details.\",\"inLanguage\":\"ro-RO\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/ana-maria-puiu\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/author\\\/ana-maria-puiu\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Keila-Kooli-Pargimaja-liginullenergia-korpuse-ehitustood_featured-image.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/#mainImage\",\"width\":1200,\"height\":628,\"caption\":\"Keila Kooli Pargimaja liginullenergia korpuse ehitust\\u00f6\\u00f6d\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\\\/#mainImage\"},\"datePublished\":\"2026-10-09T11:42:37+03:00\",\"dateModified\":\"2026-10-09T11:42:40+03:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/hermix.com\\\/ro\\\/\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"inLanguage\":\"ro-RO\",\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/ro\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Aktsiaselts Keila Vesi licita\u021bie public\u0103 pentru construc\u021bia de cl\u0103diri cu energie aproape zero a \u0219colii Keila","description":"Explora\u021bi o licita\u021bie public\u0103 de 7,015 milioane de euro pentru \u0218coala Keila din Estonia, care acoper\u0103 construc\u021bia unei cl\u0103diri cu consum de energie aproape zero, un contract pe 20 de luni \u0219i detalii cheie despre licita\u021bie.","canonical_url":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/#blogposting","name":"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction","headline":"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction","author":{"@id":"https:\/\/hermix.com\/ro\/author\/ana-maria-puiu\/#author"},"publisher":{"@id":"https:\/\/hermix.com\/ro\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Keila-Kooli-Pargimaja-liginullenergia-korpuse-ehitustood_featured-image.png","width":1200,"height":628,"caption":"Keila Kooli Pargimaja liginullenergia korpuse ehitust\u00f6\u00f6d"},"datePublished":"2026-10-09T11:42:37+03:00","dateModified":"2026-10-09T11:42:40+03:00","inLanguage":"ro-RO","mainEntityOfPage":{"@id":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/#webpage"},"isPartOf":{"@id":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/#webpage"},"articleSection":"Tender Analysis, Ana-Maria Puiu"},{"@type":"BreadcrumbList","@id":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/#listItem","position":1,"name":"Home","item":"https:\/\/hermix.com\/ro\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/#listItem","position":2,"name":"Tender Analysis","item":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/#listItem","name":"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction"},"previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/#listItem","position":3,"name":"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction","previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}}]},{"@type":"Organization","@id":"https:\/\/hermix.com\/ro\/#organization","name":"Hermix","description":"Win Public Contracts with the Power of AI","url":"https:\/\/hermix.com\/ro\/","logo":{"@type":"ImageObject","url":"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png","@id":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/#organizationLogo"},"image":{"@id":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/hermixapp","https:\/\/twitter.com\/Hermix_sw","https:\/\/www.instagram.com\/hermix_sw\/","https:\/\/be.linkedin.com\/company\/hermix"]},{"@type":"Person","@id":"https:\/\/hermix.com\/ro\/author\/ana-maria-puiu\/#author","url":"https:\/\/hermix.com\/ro\/author\/ana-maria-puiu\/","name":"Ana-Maria Puiu"},{"@type":"WebPage","@id":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/#webpage","url":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/","name":"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction","description":"Explore a \u20ac7.015M public tender for Keila School in Estonia, covering nearly zero-energy building construction, a 20-month contract and key bidding details.","inLanguage":"ro-RO","isPartOf":{"@id":"https:\/\/hermix.com\/ro\/#website"},"breadcrumb":{"@id":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/#breadcrumblist"},"author":{"@id":"https:\/\/hermix.com\/ro\/author\/ana-maria-puiu\/#author"},"creator":{"@id":"https:\/\/hermix.com\/ro\/author\/ana-maria-puiu\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Keila-Kooli-Pargimaja-liginullenergia-korpuse-ehitustood_featured-image.png","@id":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/#mainImage","width":1200,"height":628,"caption":"Keila Kooli Pargimaja liginullenergia korpuse ehitust\u00f6\u00f6d"},"primaryImageOfPage":{"@id":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/#mainImage"},"datePublished":"2026-10-09T11:42:37+03:00","dateModified":"2026-10-09T11:42:40+03:00"},{"@type":"WebSite","@id":"https:\/\/hermix.com\/ro\/#website","url":"https:\/\/hermix.com\/ro\/","name":"Hermix","description":"Win Public Contracts with the Power of AI","inLanguage":"ro-RO","publisher":{"@id":"https:\/\/hermix.com\/ro\/#organization"}}]},"og:locale":"ro_RO","og:site_name":"Hermix - Win Public Contracts with the Power of AI","og:type":"article","og:title":"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction","og:description":"Explore a \u20ac7.015M public tender for Keila School in Estonia, covering nearly zero-energy building construction, a 20-month contract and key bidding details.","og:url":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/","og:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Keila-Kooli-Pargimaja-liginullenergia-korpuse-ehitustood_featured-image.png","og:image:secure_url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Keila-Kooli-Pargimaja-liginullenergia-korpuse-ehitustood_featured-image.png","og:image:width":1200,"og:image:height":628,"article:published_time":"2026-10-09T08:42:37+00:00","article:modified_time":"2026-10-09T08:42:40+00:00","article:publisher":"https:\/\/www.facebook.com\/hermixapp","twitter:card":"summary_large_image","twitter:site":"@Hermix_sw","twitter:title":"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction","twitter:description":"Explore a \u20ac7.015M public tender for Keila School in Estonia, covering nearly zero-energy building construction, a 20-month contract and key bidding details.","twitter:creator":"@Hermix_sw","twitter:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/Keila-Kooli-Pargimaja-liginullenergia-korpuse-ehitustood_featured-image.png"},"aioseo_meta_data":{"post_id":"11197","title":"Titlu_post\u0103ri #","description":"Explora\u021bi o licita\u021bie public\u0103 de 7,015 milioane de euro pentru \u0218coala Keila din Estonia, care acoper\u0103 construc\u021bia unei cl\u0103diri cu consum de energie aproape zero, un contract pe 20 de luni \u0219i detalii cheie despre licita\u021bie.","keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-10-09 08:42:40","updated":"2026-10-09 10:26:17"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/ro\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/ro\/category\/tender-analysis\/\" title=\"Tender Analysis\">Tender Analysis<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tAktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/hermix.com\/ro\/"},{"label":"Tender Analysis","link":"https:\/\/hermix.com\/ro\/category\/tender-analysis\/"},{"label":"Aktsiaselts Keila Vesi public tender for Keila School nearly zero-energy building construction","link":"https:\/\/hermix.com\/ro\/aktsiaselts-keila-vesi-public-tender-for-keila-school-nearly-zero-energy-building-construction\/"}],"authors":[{"term_id":16,"user_id":2,"is_guest":0,"slug":"ana-maria-puiu","display_name":"Ana-Maria Puiu","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/daf02b346ef383e82c6abf3984608b2753f0bfd78c4938ff758ad3f789eda467?s=96&d=mm&r=g","avatar_alt":"","avatar_decorative":"","author_category":"","first_name":"","last_name":"","user_url":"","job_title":"","description":""}],"_links":{"self":[{"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/posts\/11197","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/comments?post=11197"}],"version-history":[{"count":1,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/posts\/11197\/revisions"}],"predecessor-version":[{"id":11199,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/posts\/11197\/revisions\/11199"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/media\/11198"}],"wp:attachment":[{"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/media?parent=11197"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/categories?post=11197"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/tags?post=11197"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/hermix.com\/ro\/wp-json\/wp\/v2\/ppma_author?post=11197"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}