{"id":7533,"date":"2026-03-04T09:54:10","date_gmt":"2026-03-04T08:54:10","guid":{"rendered":"https:\/\/hermix.com\/?p=7533"},"modified":"2026-03-04T09:54:10","modified_gmt":"2026-03-04T08:54:10","slug":"metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de","status":"publish","type":"post","link":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/","title":{"rendered":"Metro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>A 48-month preventive maintenance contract for passenger door systems on Series 3000-1st trains signals Madrid&#8217;s commitment to operational reliability across one of Europe&#8217;s largest metro networks.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Create a free account and see the full public tender details here: <\/strong><a href=\"https:\/\/app.hermix.com\/opportunities\/00048146-2026\"><strong>https:\/\/app.hermix.com\/opportunities\/00048146-2026<\/strong><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Metro de Madrid has published a \u20ac1.27 million tender for long-cycle preventive maintenance services on passenger access doors across its Series 3000-1st rolling stock fleet. Split into two lots covering different train configurations (MRSM and MRSSRM variants), with a February 20, 2026 deadline and a four-year contract term, this procurement represents systematic investment in maintaining service reliability and passenger safety across Madrid&#8217;s extensive urban rail network.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The tender reflects Metro de Madrid&#8217;s mature rolling stock maintenance strategy, evidenced by 832 historical contracts worth \u20ac3 billion and 255 upcoming renewals valued at \u20ac1.3 billion. With 196 similar maintenance contracts totaling \u20ac365 million already awarded, the authority demonstrates consistent, professional procurement operations where specialized technical capability and proven metro experience drive long-term vendor relationships.<\/p>\n\n\n\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Opportunity Overview<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Contracting Authority:<\/strong> Metro de Madrid<br><strong>Reference Number:<\/strong> 6012600009<br><strong>Tender Title:<\/strong> Servicio de Mantenimiento Preventivo de Ciclo Largo de las Puertas de Acceso de Viajeros en el Material M\u00f3vil de la Serie 3000-1\u00aa<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Scope of Work:<\/strong><strong><br><\/strong>Long-cycle preventive maintenance services for passenger access door equipment on Series 3000-1st rolling stock, encompassing:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Lot 1 &#8211; Series 3000-1st MRSM Trains:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Preventive maintenance on passenger door systems<\/li>\n\n\n\n<li>Long-cycle maintenance protocols<\/li>\n\n\n\n<li>Contract value: \u20ac664,200.00<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Lot 2 &#8211; Series 3000-1st MRSSRM Trains:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Preventive maintenance on passenger door systems<\/li>\n\n\n\n<li>Long-cycle maintenance protocols<\/li>\n\n\n\n<li>Contract value: \u20ac610,200.00<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Location:<\/strong> Madrid, Spain<br><strong>Total Contract Value:<\/strong> \u20ac1,274,400.00<br><strong>Contract Duration:<\/strong> 48 months (4 years)<br><strong>Procedure Type:<\/strong> Open procedure<br><strong>Award Criteria:<\/strong> Quality and Price (specific weightings not disclosed)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Key Dates:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Publication: January 22, 2026<\/li>\n\n\n\n<li>Submission Deadline: February 20, 2026 (29 days from publication)<\/li>\n\n\n\n<li>Tender Opening: February 21, 2026<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Language Requirements:<\/strong> Spanish only<br><strong>EU Funding:<\/strong> No<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Financial Guarantees Required:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Provisional: None<\/li>\n\n\n\n<li>Definitive: 5% of base budget (VAT excluded)<\/li>\n\n\n\n<li>Complementary: 5% of base budget (VAT excluded) if required<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Contact Details:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Email: doue@metromadrid.es<\/li>\n\n\n\n<li>Phone: +34 913798800<\/li>\n\n\n\n<li>Website: <a href=\"http:\/\/www.metromadrid.es\/\">www.metromadrid.es<\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Submission Portal:<\/strong> <a href=\"https:\/\/www.metromadrid.es\/es\/perfil-del-contratante\/\">https:\/\/www.metromadrid.es\/es\/perfil-del-contratante\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Ready to win Spanish public transport maintenance contracts?<\/strong> Create your free Hermix account at <a href=\"https:\/\/hermix.com\/nl\/sign-up\/\">https:\/\/hermix.com\/sign-up\/<\/a> and access AI-powered tender analysis, automated Spanish tender monitoring, and competitive intelligence across Europe&#8217;s \u20ac2 trillion public procurement market.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Authority Profile: Metro de Madrid&#8217;s Procurement Excellence<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Metro de Madrid operates one of Europe&#8217;s largest and most complex urban rail networks, serving Spain&#8217;s capital with 302 kilometers of track, 302 stations, and approximately 2 million daily passengers. As the backbone of Madrid&#8217;s public transport system, the metro requires continuous, systematic maintenance to ensure operational reliability, passenger safety, and service quality.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The authority&#8217;s procurement operations reflect the scale and sophistication required to maintain such extensive infrastructure. Metro de Madrid doesn&#8217;t experiment with maintenance procurement\u2014it executes systematic, professional operations built on decades of experience managing complex rolling stock fleets.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Overall Procurement Activity:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Total Contract Awards:<\/strong> 832 contracts worth \u20ac3.0 billion<\/li>\n\n\n\n<li><strong>Active Tender Pipeline:<\/strong> 10 open tenders valued at \u20ac14 million<\/li>\n\n\n\n<li><strong>Renewal Forecast:<\/strong> 255 potential contract renewals worth \u20ac1.3 billion<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Rolling Stock Maintenance Services:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Similar Contract Awards:<\/strong> 196 contracts totaling \u20ac365 million (average: \u20ac2.6M per contract)<\/li>\n\n\n\n<li><strong>Similar Open Tenders:<\/strong> 3 current opportunities worth \u20ac4.4 million<\/li>\n\n\n\n<li><strong>Similar Renewals:<\/strong> 91 upcoming renewals worth \u20ac470 million (average: \u20ac5.2M per contract)<\/li>\n\n\n\n<li><strong>Prior Notices:<\/strong> 75 published notices worth \u20ac722 million<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The substantial renewal pipeline (\u20ac470M across 91 contracts) signals consistent, cyclical contract management where proven maintenance providers secure recurring relationships. The average renewal value of \u20ac5.2 million\u2014significantly higher than this tender&#8217;s \u20ac1.27 million\u2014suggests opportunities for contract growth and expanded scope for successful performers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Metro de Madrid operates within a broader Spanish and European urban rail maintenance market where 603 similar authorities have rolling stock maintenance needs, collectively representing \u20ac1.2 billion in related procurement. Success here positions contractors not only for Madrid metro work but potentially for relationships across Spain&#8217;s urban transport operators and broader European metro networks.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Competitive Landscape: Specialized Rail and Industrial Equipment Leaders<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Historical contract awards for similar rolling stock maintenance services reveal a competitive market dominated by multinational industrial equipment manufacturers and specialized Spanish rail maintenance providers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Top Contract Winners (Similar Services):<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>THYSSENKRUPP<\/strong> \u2013 \u20ac17M across 10 contracts (\u20ac2.8M average)<\/li>\n\n\n\n<li><strong>KONE<\/strong> \u2013 \u20ac6.8M across 9 contracts (\u20ac1.4M average)<\/li>\n\n\n\n<li><strong>INETUM<\/strong> \u2013 \u20ac15M across 8 contracts (\u20ac1.9M average)<\/li>\n\n\n\n<li><strong>SIEMENS<\/strong> \u2013 \u20ac10M across 7 contracts (\u20ac1.7M average)<\/li>\n\n\n\n<li><strong>SISTEMAS AVANZADOS DE TECNOLOGIA<\/strong> \u2013 \u20ac4M across 6 contracts (\u20ac808K average)<\/li>\n\n\n\n<li><strong>INDUREMON<\/strong> \u2013 \u20ac6.9M across 5 contracts (\u20ac1.7M average)<\/li>\n\n\n\n<li><strong>TROYA CONSTRUCCIONES FERROVIARIAS<\/strong> \u2013 \u20ac4M across 5 contracts (\u20ac804K average)<\/li>\n\n\n\n<li><strong>DARDI INSTALACIONES Y SERVICIOS<\/strong> \u2013 \u20ac3M across 5 contracts (\u20ac760K average)<\/li>\n\n\n\n<li><strong>ORONA S COOP<\/strong> \u2013 \u20ac227K across 5 contracts (\u20ac227K average)<\/li>\n\n\n\n<li><strong>PROSEGUR SOLUCIONES INTEGRALES<\/strong> \u2013 \u20ac5M across 4 contracts (\u20ac2.5M average)<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Key Competitive Observations:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Industrial Equipment Giants Lead:<\/strong> ThyssenKrupp, KONE, and Siemens\u2014global leaders in elevator, escalator, and rail systems\u2014collectively secured 26 contracts worth \u20ac34 million. Their presence indicates Metro de Madrid&#8217;s preference for established industrial equipment manufacturers with proven track records in safety-critical mechanical systems maintenance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>High Contract Frequency Winners:<\/strong> ThyssenKrupp&#8217;s 10 contracts and KONE&#8217;s 9 contracts demonstrate sustained relationships with Metro de Madrid, suggesting satisfaction with service delivery and technical capability. Repeat business dominates this market\u2014success on initial contracts opens doors to ongoing opportunities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>100% Spanish Market:<\/strong> All 167 historical contracts worth \u20ac365 million went exclusively to Spanish companies or Spanish subsidiaries of international firms. This complete domestic award pattern reflects Spanish procurement regulations, practical requirements for Madrid-based maintenance teams with rapid response capabilities, and Spanish-language technical documentation and operational coordination.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>IT and Technology Integration:<\/strong> INETUM&#8217;s presence (\u20ac15M across 8 contracts) alongside traditional mechanical maintenance providers suggests increasing integration of digital systems, predictive maintenance technologies, and automated monitoring in modern metro rolling stock maintenance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Average Contract Values Signal Market Tiers:<\/strong> The range from ORONA&#8217;s \u20ac227K average to ThyssenKrupp&#8217;s \u20ac2.8M average indicates market segmentation\u2014larger comprehensive maintenance contracts versus smaller specialized interventions or specific equipment maintenance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Commercial and Procedural Signals<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Two-Lot Structure:<\/strong><strong><br><\/strong>The split between MRSM and MRSSRM train configurations allows specialized bidding. Contractors can pursue one lot matching their specific technical expertise or bid both to demonstrate comprehensive fleet maintenance capability. The similar values (\u20ac664K vs. \u20ac610K) suggest comparable maintenance workloads across both train variants.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Award Criteria Balance:<\/strong><strong><br><\/strong>Evaluation on both Quality and Price, without disclosed weightings, indicates Metro de Madrid&#8217;s balanced approach. Given the safety-critical nature of passenger door systems\u2014failures directly impact service reliability and passenger safety\u2014quality factors likely carry substantial weight and may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Technical maintenance protocols and preventive maintenance schedules<\/li>\n\n\n\n<li>Response time commitments for emergency repairs<\/li>\n\n\n\n<li>Spare parts availability and supply chain management<\/li>\n\n\n\n<li>Technician qualifications and certifications<\/li>\n\n\n\n<li>Historical performance on similar metro maintenance contracts<\/li>\n\n\n\n<li>Quality management systems and safety protocols<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Long-Cycle Preventive Maintenance Focus:<\/strong><strong><br><\/strong>The tender specifically requires &#8220;long-cycle&#8221; (ciclo largo) preventive maintenance, distinguishing this from routine short-interval maintenance. This typically involves comprehensive overhauls, component replacements, and detailed inspections at extended mileage or time intervals, requiring specialized tools, deep technical knowledge of door mechanisms, and potentially workshop facilities for component refurbishment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Financial Guarantee Requirements:<\/strong><strong><br><\/strong>The 5% definitive guarantee and potential 5% complementary guarantee (10% total) represent significant financial commitment (\u20ac127,440 combined). These guarantees must be maintained throughout the 48-month contract term, favoring financially stable contractors with established banking relationships for performance bonds.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Spanish Language Mandate:<\/strong><strong><br><\/strong>Offers must be submitted in Spanish only, with ongoing contract management, technical documentation, and coordination with Metro de Madrid operations staff conducted entirely in Spanish. This creates natural barriers for non-Spanish contractors and effectively requires either Spanish company status or Spanish-speaking technical teams based in Madrid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>29-Day Submission Window:<\/strong><strong><br><\/strong>The period from January 22 to February 20 provides reasonable time for technical proposal development but demands efficient mobilization, particularly for contractors needing to understand Series 3000-1st train door system specifications, assess maintenance facility requirements, and structure pricing for long-cycle interventions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Strategic Context: Urban Rail Reliability Through Preventive Maintenance<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This tender reflects broader trends in European metro operations, where aging rolling stock fleets require increasingly sophisticated preventive maintenance to maintain service reliability while maximizing asset life before major fleet renewals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Series 3000 Fleet Context:<\/strong><strong><br><\/strong>Metro de Madrid&#8217;s Series 3000 trains entered service in the 1990s, making them approximately 30 years old. At this lifecycle stage, passenger door systems\u2014subject to millions of open\/close cycles annually\u2014require comprehensive preventive maintenance programs to prevent service-affecting failures and ensure passenger safety during boarding and alighting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The Door Systems Challenge:<\/strong><strong><br><\/strong>Passenger doors represent one of the most failure-prone systems on metro rolling stock due to constant mechanical stress, exposure to passenger interference, and critical safety functions. Reliable door operation directly impacts service punctuality (door faults cause significant delays), passenger safety (preventing accidents during closure), and operational efficiency (avoiding train withdrawals for repairs).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Hermix users gain strategic advantages analyzing Spanish transport tenders.<\/strong> Rather than manually searching Spanish procurement portals, translating technical specifications, and researching contractor histories, Hermix delivers instant competitive intelligence with automated Spanish-to-English translation, detailed analysis of all 10 top contractors, and insights connecting this tender to 91 renewal opportunities worth \u20ac470 million. The platform helps companies consistently qualify the right metro maintenance opportunities and win more Spanish public transport contracts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The Renewal Pipeline Opportunity:<\/strong><strong><br><\/strong>Metro de Madrid&#8217;s 91 similar contracts approaching renewal (\u20ac470M total) suggest systematic contract cycling. Successful performance on this \u20ac1.27M door maintenance contract positions bidders favorably for larger comprehensive maintenance frameworks, expanded fleet coverage, or additional subsystem maintenance as relationships develop.<\/p>\n\n\n\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Practical Takeaways for Bidders<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Who This Tender Suits:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Spanish rail maintenance specialists with Madrid metro experience<\/li>\n\n\n\n<li>Industrial equipment manufacturers (ThyssenKrupp, KONE, Siemens) with Spanish subsidiaries<\/li>\n\n\n\n<li>Mechanical maintenance providers specializing in passenger door systems and safety-critical rail components<\/li>\n\n\n\n<li>Companies with Spanish-speaking technical teams and Madrid-area maintenance facilities<\/li>\n\n\n\n<li>Firms seeking long-term stability (48 months) in urban rail maintenance services<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Critical Attention Points:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Series 3000 Door System Expertise:<\/strong> Your proposal must demonstrate specific knowledge of Series 3000-1st train passenger door systems, including mechanical components, control systems, safety interlocks, and common failure modes. Generic rolling stock maintenance capability won&#8217;t suffice\u2014Metro de Madrid expects specialized technical competence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Long-Cycle Maintenance Methodology:<\/strong> Define comprehensive preventive maintenance protocols including inspection schedules, component replacement intervals, testing procedures, and quality control measures. Demonstrate understanding of when doors require workshop-level intervention versus on-site maintenance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Response Time and Availability:<\/strong> While not explicitly stated, metro operations demand rapid response to door system failures affecting service. Your technical proposal should include emergency response capabilities, spare parts inventory management, and 24\/7 availability commitments.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Madrid Presence Requirements:<\/strong> Successful bidders will need Madrid-based technical staff, spare parts storage, and potentially workshop facilities for component refurbishment. Detail your local infrastructure and team structure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Quality-Price Balance:<\/strong> Historical contract values averaging \u20ac2.6M suggest Metro de Madrid values comprehensive technical capability. Don&#8217;t underprice at the risk of failing quality thresholds\u2014focus on demonstrating superior preventive maintenance expertise and proven metro reliability improvements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Financial Guarantee Preparation:<\/strong> Arrange definitive (5%) and complementary (5%) guarantees totaling \u20ac127,440 before contract award. Electronic format preferred, with physical delivery to Madrid if necessary.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Reference Projects Essential:<\/strong> Prepare compelling case studies demonstrating successful metro door system maintenance, particularly on aging rolling stock fleets. Include service reliability metrics, mean time between failures (MTBF) improvements, and safety performance data.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Maak vandaag nog uw gratis Hermix-account aan op <a href=\"https:\/\/hermix.com\/nl\/sign-up\/\">https:\/\/hermix.com\/sign-up\/<\/a> and transform Spanish public transport tender analysis from hours of manual translation and research into minutes of AI-powered intelligence that helps you win more contracts.<\/p>\n\n\n<figure class=\"wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1200\" height=\"628\" src=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/SERVICIO-DE-MANTENIMIENTO-PREVENTIVO-DE-CICLO-LARGO-DE-LAS-PUERTAS-DE-ACCESO-DE-VIAJEROS-EN-EL-MATERIAL-MOVIL-DE-LA-SERIE-3000-1a-1_featured-image.png\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"SERVICIO DE MANTENIMIENTO PREVENTIVO DE CICLO LARGO DE LAS PUERTAS DE ACCESO DE VIAJEROS EN EL MATERIAL M\u00d3VIL DE LA SERIE 3000-1\u00aa\" style=\"object-fit:cover;\" srcset=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/SERVICIO-DE-MANTENIMIENTO-PREVENTIVO-DE-CICLO-LARGO-DE-LAS-PUERTAS-DE-ACCESO-DE-VIAJEROS-EN-EL-MATERIAL-MOVIL-DE-LA-SERIE-3000-1a-1_featured-image.png 1200w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/SERVICIO-DE-MANTENIMIENTO-PREVENTIVO-DE-CICLO-LARGO-DE-LAS-PUERTAS-DE-ACCESO-DE-VIAJEROS-EN-EL-MATERIAL-MOVIL-DE-LA-SERIE-3000-1a-1_featured-image-300x157.png 300w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/SERVICIO-DE-MANTENIMIENTO-PREVENTIVO-DE-CICLO-LARGO-DE-LAS-PUERTAS-DE-ACCESO-DE-VIAJEROS-EN-EL-MATERIAL-MOVIL-DE-LA-SERIE-3000-1a-1_featured-image-1024x536.png 1024w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/SERVICIO-DE-MANTENIMIENTO-PREVENTIVO-DE-CICLO-LARGO-DE-LAS-PUERTAS-DE-ACCESO-DE-VIAJEROS-EN-EL-MATERIAL-MOVIL-DE-LA-SERIE-3000-1a-1_featured-image-768x402.png 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>A 48-month preventive maintenance contract for passenger door systems on Series 3000-1st trains signals Madrid&#8217;s commitment to operational reliability across one of Europe&#8217;s largest metro networks. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00048146-2026 Metro de Madrid has published a \u20ac1.27 million tender for long-cycle preventive maintenance services on passenger [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":7534,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_angie_page":false,"content-type":"","inline_featured_image":false,"page_builder":"","footnotes":""},"categories":[35],"tags":[],"ppma_author":[16],"class_list":["post-7533","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tender-analysis"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"A 48-month preventive maintenance contract for passenger door systems on Series 3000-1st trains signals Madrid&#039;s commitment to operational reliability across one of Europe&#039;s largest metro networks. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00048146-2026 Metro de Madrid has published a \u20ac1.27 million tender for long-cycle preventive maintenance services on passenger\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Ana-Maria Puiu\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"nl_NL\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Hermix - Win Public Contracts with the Power of AI\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Metro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de - Hermix\" \/>\n\t\t<meta property=\"og:description\" content=\"A 48-month preventive maintenance contract for passenger door systems on Series 3000-1st trains signals Madrid&#039;s commitment to operational reliability across one of Europe&#039;s largest metro networks. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00048146-2026 Metro de Madrid has published a \u20ac1.27 million tender for long-cycle preventive maintenance services on passenger\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-03-04T08:54:10+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-03-04T08:54:10+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/hermixapp\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Metro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de - Hermix\" \/>\n\t\t<meta name=\"twitter:description\" content=\"A 48-month preventive maintenance contract for passenger door systems on Series 3000-1st trains signals Madrid&#039;s commitment to operational reliability across one of Europe&#039;s largest metro networks. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00048146-2026 Metro de Madrid has published a \u20ac1.27 million tender for long-cycle preventive maintenance services on passenger\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#blogposting\",\"name\":\"Metro de Madrid Public Tender: \\u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de - Hermix\",\"headline\":\"Metro de Madrid Public Tender: \\u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de\",\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/author\\\/ana-maria-puiu\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/SERVICIO-DE-MANTENIMIENTO-PREVENTIVO-DE-CICLO-LARGO-DE-LAS-PUERTAS-DE-ACCESO-DE-VIAJEROS-EN-EL-MATERIAL-MOVIL-DE-LA-SERIE-3000-1a-1_featured-image.png\",\"width\":1200,\"height\":628,\"caption\":\"SERVICIO DE MANTENIMIENTO PREVENTIVO DE CICLO LARGO DE LAS PUERTAS DE ACCESO DE VIAJEROS EN EL MATERIAL M\\u00d3VIL DE LA SERIE 3000-1\\u00aa\"},\"datePublished\":\"2026-03-04T09:54:10+02:00\",\"dateModified\":\"2026-03-04T09:54:10+02:00\",\"inLanguage\":\"nl-NL\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#webpage\"},\"articleSection\":\"Tender Analysis, Ana-Maria Puiu\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hermix.com\\\/nl\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/category\\\/tender-analysis\\\/#listItem\",\"position\":2,\"name\":\"Tender Analysis\",\"item\":\"https:\\\/\\\/hermix.com\\\/nl\\\/category\\\/tender-analysis\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#listItem\",\"name\":\"Metro de Madrid Public Tender: \\u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#listItem\",\"position\":3,\"name\":\"Metro de Madrid Public Tender: \\u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/#organization\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"url\":\"https:\\\/\\\/hermix.com\\\/nl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.hermix.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hermix_logo.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/hermixapp\",\"https:\\\/\\\/twitter.com\\\/Hermix_sw\",\"https:\\\/\\\/www.instagram.com\\\/hermix_sw\\\/\",\"https:\\\/\\\/be.linkedin.com\\\/company\\\/hermix\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/author\\\/ana-maria-puiu\\\/#author\",\"url\":\"https:\\\/\\\/hermix.com\\\/nl\\\/author\\\/ana-maria-puiu\\\/\",\"name\":\"Ana-Maria Puiu\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/daf02b346ef383e82c6abf3984608b2753f0bfd78c4938ff758ad3f789eda467?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Ana-Maria Puiu\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#webpage\",\"url\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/\",\"name\":\"Metro de Madrid Public Tender: \\u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de - Hermix\",\"description\":\"A 48-month preventive maintenance contract for passenger door systems on Series 3000-1st trains signals Madrid's commitment to operational reliability across one of Europe's largest metro networks. Create a free account and see the full public tender details here: https:\\\/\\\/app.hermix.com\\\/opportunities\\\/00048146-2026 Metro de Madrid has published a \\u20ac1.27 million tender for long-cycle preventive maintenance services on passenger\",\"inLanguage\":\"nl-NL\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/author\\\/ana-maria-puiu\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/author\\\/ana-maria-puiu\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/SERVICIO-DE-MANTENIMIENTO-PREVENTIVO-DE-CICLO-LARGO-DE-LAS-PUERTAS-DE-ACCESO-DE-VIAJEROS-EN-EL-MATERIAL-MOVIL-DE-LA-SERIE-3000-1a-1_featured-image.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#mainImage\",\"width\":1200,\"height\":628,\"caption\":\"SERVICIO DE MANTENIMIENTO PREVENTIVO DE CICLO LARGO DE LAS PUERTAS DE ACCESO DE VIAJEROS EN EL MATERIAL M\\u00d3VIL DE LA SERIE 3000-1\\u00aa\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\\\/#mainImage\"},\"datePublished\":\"2026-03-04T09:54:10+02:00\",\"dateModified\":\"2026-03-04T09:54:10+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/hermix.com\\\/nl\\\/\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"inLanguage\":\"nl-NL\",\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/nl\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Metro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de - Hermix","description":"A 48-month preventive maintenance contract for passenger door systems on Series 3000-1st trains signals Madrid's commitment to operational reliability across one of Europe's largest metro networks. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00048146-2026 Metro de Madrid has published a \u20ac1.27 million tender for long-cycle preventive maintenance services on passenger","canonical_url":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#blogposting","name":"Metro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de - Hermix","headline":"Metro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de","author":{"@id":"https:\/\/hermix.com\/nl\/author\/ana-maria-puiu\/#author"},"publisher":{"@id":"https:\/\/hermix.com\/nl\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/SERVICIO-DE-MANTENIMIENTO-PREVENTIVO-DE-CICLO-LARGO-DE-LAS-PUERTAS-DE-ACCESO-DE-VIAJEROS-EN-EL-MATERIAL-MOVIL-DE-LA-SERIE-3000-1a-1_featured-image.png","width":1200,"height":628,"caption":"SERVICIO DE MANTENIMIENTO PREVENTIVO DE CICLO LARGO DE LAS PUERTAS DE ACCESO DE VIAJEROS EN EL MATERIAL M\u00d3VIL DE LA SERIE 3000-1\u00aa"},"datePublished":"2026-03-04T09:54:10+02:00","dateModified":"2026-03-04T09:54:10+02:00","inLanguage":"nl-NL","mainEntityOfPage":{"@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#webpage"},"isPartOf":{"@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#webpage"},"articleSection":"Tender Analysis, Ana-Maria Puiu"},{"@type":"BreadcrumbList","@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/hermix.com\/nl#listItem","position":1,"name":"Home","item":"https:\/\/hermix.com\/nl","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/nl\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/nl\/category\/tender-analysis\/#listItem","position":2,"name":"Tender Analysis","item":"https:\/\/hermix.com\/nl\/category\/tender-analysis\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#listItem","name":"Metro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de"},"previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/nl#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#listItem","position":3,"name":"Metro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de","previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/nl\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}}]},{"@type":"Organization","@id":"https:\/\/hermix.com\/nl\/#organization","name":"Hermix","description":"Win Public Contracts with the Power of AI","url":"https:\/\/hermix.com\/nl\/","logo":{"@type":"ImageObject","url":"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png","@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#organizationLogo"},"image":{"@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/hermixapp","https:\/\/twitter.com\/Hermix_sw","https:\/\/www.instagram.com\/hermix_sw\/","https:\/\/be.linkedin.com\/company\/hermix"]},{"@type":"Person","@id":"https:\/\/hermix.com\/nl\/author\/ana-maria-puiu\/#author","url":"https:\/\/hermix.com\/nl\/author\/ana-maria-puiu\/","name":"Ana-Maria Puiu","image":{"@type":"ImageObject","@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/daf02b346ef383e82c6abf3984608b2753f0bfd78c4938ff758ad3f789eda467?s=96&d=mm&r=g","width":96,"height":96,"caption":"Ana-Maria Puiu"}},{"@type":"WebPage","@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#webpage","url":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/","name":"Metro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de - Hermix","description":"A 48-month preventive maintenance contract for passenger door systems on Series 3000-1st trains signals Madrid's commitment to operational reliability across one of Europe's largest metro networks. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00048146-2026 Metro de Madrid has published a \u20ac1.27 million tender for long-cycle preventive maintenance services on passenger","inLanguage":"nl-NL","isPartOf":{"@id":"https:\/\/hermix.com\/nl\/#website"},"breadcrumb":{"@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#breadcrumblist"},"author":{"@id":"https:\/\/hermix.com\/nl\/author\/ana-maria-puiu\/#author"},"creator":{"@id":"https:\/\/hermix.com\/nl\/author\/ana-maria-puiu\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/SERVICIO-DE-MANTENIMIENTO-PREVENTIVO-DE-CICLO-LARGO-DE-LAS-PUERTAS-DE-ACCESO-DE-VIAJEROS-EN-EL-MATERIAL-MOVIL-DE-LA-SERIE-3000-1a-1_featured-image.png","@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#mainImage","width":1200,"height":628,"caption":"SERVICIO DE MANTENIMIENTO PREVENTIVO DE CICLO LARGO DE LAS PUERTAS DE ACCESO DE VIAJEROS EN EL MATERIAL M\u00d3VIL DE LA SERIE 3000-1\u00aa"},"primaryImageOfPage":{"@id":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/#mainImage"},"datePublished":"2026-03-04T09:54:10+02:00","dateModified":"2026-03-04T09:54:10+02:00"},{"@type":"WebSite","@id":"https:\/\/hermix.com\/nl\/#website","url":"https:\/\/hermix.com\/nl\/","name":"Hermix","description":"Win Public Contracts with the Power of AI","inLanguage":"nl-NL","publisher":{"@id":"https:\/\/hermix.com\/nl\/#organization"}}]},"og:locale":"nl_NL","og:site_name":"Hermix - Win Public Contracts with the Power of AI","og:type":"article","og:title":"Metro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de - Hermix","og:description":"A 48-month preventive maintenance contract for passenger door systems on Series 3000-1st trains signals Madrid's commitment to operational reliability across one of Europe's largest metro networks. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00048146-2026 Metro de Madrid has published a \u20ac1.27 million tender for long-cycle preventive maintenance services on passenger","og:url":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/","og:image":"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png","og:image:secure_url":"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png","article:published_time":"2026-03-04T08:54:10+00:00","article:modified_time":"2026-03-04T08:54:10+00:00","article:publisher":"https:\/\/www.facebook.com\/hermixapp","twitter:card":"summary_large_image","twitter:site":"@Hermix_sw","twitter:title":"Metro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de - Hermix","twitter:description":"A 48-month preventive maintenance contract for passenger door systems on Series 3000-1st trains signals Madrid's commitment to operational reliability across one of Europe's largest metro networks. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00048146-2026 Metro de Madrid has published a \u20ac1.27 million tender for long-cycle preventive maintenance services on passenger","twitter:creator":"@Hermix_sw","twitter:image":"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png"},"aioseo_meta_data":[],"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/nl\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/nl\/category\/tender-analysis\/\" title=\"Tender Analysis\">Tender Analysis<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tMetro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/hermix.com\/nl"},{"label":"Tender Analysis","link":"https:\/\/hermix.com\/nl\/category\/tender-analysis\/"},{"label":"Metro de Madrid Public Tender: \u20ac1.27 Million Rolling Stock Door Maintenance TenderMetro de","link":"https:\/\/hermix.com\/nl\/metro-de-madrid-public-tender-e1-27-million-rolling-stock-door-maintenance-tendermetro-de\/"}],"authors":[{"term_id":16,"user_id":2,"is_guest":0,"slug":"ana-maria-puiu","display_name":"Ana-Maria Puiu","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/daf02b346ef383e82c6abf3984608b2753f0bfd78c4938ff758ad3f789eda467?s=96&d=mm&r=g","author_category":"","first_name":"","last_name":"","user_url":"","job_title":"","description":""}],"_links":{"self":[{"href":"https:\/\/hermix.com\/nl\/wp-json\/wp\/v2\/posts\/7533","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hermix.com\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hermix.com\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hermix.com\/nl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hermix.com\/nl\/wp-json\/wp\/v2\/comments?post=7533"}],"version-history":[{"count":0,"href":"https:\/\/hermix.com\/nl\/wp-json\/wp\/v2\/posts\/7533\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hermix.com\/nl\/wp-json\/wp\/v2\/media\/7534"}],"wp:attachment":[{"href":"https:\/\/hermix.com\/nl\/wp-json\/wp\/v2\/media?parent=7533"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hermix.com\/nl\/wp-json\/wp\/v2\/categories?post=7533"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hermix.com\/nl\/wp-json\/wp\/v2\/tags?post=7533"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/hermix.com\/nl\/wp-json\/wp\/v2\/ppma_author?post=7533"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}