{"id":7561,"date":"2026-03-12T12:33:16","date_gmt":"2026-03-12T11:33:16","guid":{"rendered":"https:\/\/hermix.com\/?p=7561"},"modified":"2026-03-12T12:33:16","modified_gmt":"2026-03-12T11:33:16","slug":"aeroports-de-paris-lance-un-accord-cadre-de-30-millions-deuros-sur-huit-ans-pour-la-fourniture-de-materiel-electrique","status":"publish","type":"post","link":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/","title":{"rendered":"A\u00e9roports de Paris lance un accord-cadre de 30 millions d&#039;euros sur huit ans pour l&#039;approvisionnement en mat\u00e9riel \u00e9lectrique."},"content":{"rendered":"<p class=\"wp-block-paragraph\"><em>Un accord-cadre de grande envergure, d&#039;une dur\u00e9e de 96 mois, visant \u00e0 standardiser l&#039;infrastructure \u00e9lectrique des a\u00e9roports parisiens suite \u00e0 une r\u00e9\u00e9valuation strat\u00e9gique des besoins op\u00e9rationnels.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cr\u00e9ez un compte gratuit et consultez ici tous les d\u00e9tails de l&#039;appel d&#039;offres public\u00a0: <a href=\"https:\/\/app.hermix.com\/opportunities\/00110820-2026\">https:\/\/app.hermix.com\/opportunities\/00110820-2026<\/a><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A\u00e9roports de Paris (ADP) a officiellement lanc\u00e9 un important appel d&#039;offres concernant la fourniture d&#039;\u00e9quipements \u00e9lectriques pour l&#039;ensemble de ses sites, d&#039;une valeur estim\u00e9e \u00e0 30 millions d&#039;euros. Cet appel d&#039;offres repr\u00e9sente un investissement d&#039;infrastructure essentiel pour l&#039;exploitant, garantissant la modernisation et la maintenance continues des syst\u00e8mes \u00e9lectriques au sein de l&#039;un des r\u00e9seaux a\u00e9roportuaires les plus fr\u00e9quent\u00e9s d&#039;Europe.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ce qui rend cette opportunit\u00e9 particuli\u00e8rement remarquable, au-del\u00e0 de son importance apparente, c&#039;est son contexte. Ce march\u00e9 fait suite \u00e0 une consultation initialement pr\u00e9vue en mars 2025, annul\u00e9e par la suite, ce qui t\u00e9moigne d&#039;un affinement d\u00e9lib\u00e9r\u00e9 des exigences op\u00e9rationnelles d&#039;ADP. D&#039;une dur\u00e9e de huit ans (96 mois), cet accord-cadre offre aux fournisseurs une occasion unique de nouer un partenariat de dix ans avec un acteur majeur du transport en France. Toutefois, la p\u00e9riode de d\u00e9p\u00f4t des candidatures \u00e9tant exceptionnellement courte (cl\u00f4ture d\u00e9but mars 2026), les entreprises int\u00e9ress\u00e9es doivent se mobiliser sans d\u00e9lai.<\/p>\n\n\n\n\n\n\n<h2 class=\"wp-block-heading\">APER\u00c7U DE L&#039;OPPORTUNIT\u00c9<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Cette section pr\u00e9sente les principales donn\u00e9es factuelles relatives \u00e0 l&#039;appel d&#039;offres. Tous les chiffres sont tir\u00e9s de l&#039;avis de march\u00e9 officiel (r\u00e9f\u00e9rence 00110820-2026).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Autorit\u00e9 contractante : <\/strong>A\u00e9roports de Paris (ADP)<br><strong>Num\u00e9ro de r\u00e9f\u00e9rence :<\/strong> 00110820-2026 (R\u00e9f\u00e9rence interne : SPA023036)<br><strong>Titre de l&#039;appel d&#039;offres :<\/strong> Fourniture de mat\u00e9riels \u00e9lectriques sur tous les sites d&#039;A\u00e9roports de Paris<br><strong>\u00c9tendue des travaux\u00a0:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fourniture de mat\u00e9riel et d&#039;accessoires \u00e9lectriques.<\/li>\n\n\n\n<li>Ex\u00e9cution des fournitures dans le cadre d\u2019un accord-cadre.<\/li>\n\n\n\n<li>Accord multi-attributs (maximum deux d\u00e9tenteurs).<\/li>\n\n\n\n<li>Ex\u00e9cution des commandes sur la base de clauses techniques (CCTP).<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Structure du lot :<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lot 1 : Fourniture de mat\u00e9riels \u00e9lectriques sur tous les sites d&#039;A\u00e9roports de Paris.<\/li>\n\n\n\n<li>Valeur du lot : 30 000 000,00 \u20ac.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Lieu de repr\u00e9sentation :<\/strong> France (plus pr\u00e9cis\u00e9ment Val-de-Marne et Seine-Saint-Denis).<br><strong>Valeur totale estim\u00e9e :<\/strong> 30 000 000,00 \u20ac hors TVA.<br><strong>Dur\u00e9e du contrat : <\/strong>96 mois.<br><strong>Type de proc\u00e9dure : <\/strong>N\u00e9goci\u00e9 avec publication pr\u00e9alable d&#039;un appel d&#039;offres \/ Concurrentiel avec n\u00e9gociation.<br><strong>Crit\u00e8res d&#039;attribution\u00a0:<\/strong> Non sp\u00e9cifi\u00e9 dans l&#039;avis r\u00e9capitulatif (\u201c Inconnu \u201d).<br><strong>Dates cl\u00e9s :<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Date de publication : 17\/02\/2026<\/li>\n\n\n\n<li>Date limite : 03\/03\/2026<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Exigences linguistiques : <\/strong>Fran\u00e7ais.<br><strong>Financement de l&#039;UE :<\/strong> Non.<br><strong>Coordonn\u00e9es de contact :<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Point de contact : DHATI<\/li>\n\n\n\n<li>Courriel\u00a0: dhati@adp.fr<\/li>\n\n\n\n<li>T\u00e9l\u00e9phone : +33 0174221567<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Portail de soumission \/ URL<\/strong>:<a href=\" https:\/\/fournisseurs.aeroportsdeparis.fr\/\"> https:\/\/fournisseurs.aeroportsdeparis.fr\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pr\u00eat \u00e0 qualifier des appels d'offres comme celui-ci plus rapidement ? Cr\u00e9ez votre compte Hermix gratuit sur <a href=\"https:\/\/hermix.com\/fr\/sinscrire\/\">https:\/\/hermix.com\/sign-up\/<\/a> et acc\u00e9dez \u00e0 une analyse des appels d'offres propuls\u00e9e par l'IA, \u00e0 une veille concurrentielle et \u00e0 une surveillance automatis\u00e9e sur le march\u00e9 europ\u00e9en des march\u00e9s publics de 2 000 milliards d'euros.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">AUTORIT\u00c9 ET HISTOIRE<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A\u00e9roports de Paris (ADP) est l\u2019entit\u00e9 centrale qui g\u00e8re les principaux a\u00e9roports desservant Paris, notamment Charles de Gaulle, Orly et Le Bourget. En tant que ma\u00eetre d\u2019ouvrage d\u00e9l\u00e9gu\u00e9, ADP intervient dans le secteur des \u201c\u00a0activit\u00e9s li\u00e9es aux a\u00e9roports\u00a0\u201d, g\u00e9rant d\u2019importants portefeuilles d\u2019infrastructures qui n\u00e9cessitent un soutien logistique et technique constant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les donn\u00e9es fournies dans le dossier d&#039;appel d&#039;offres mettent en \u00e9vidence le r\u00f4le d&#039;ADP en tant qu&#039;acheteur \u00e0 gros volume, jouissant d&#039;une pr\u00e9sence significative dans le paysage des march\u00e9s publics europ\u00e9ens.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Nombre total d&#039;appels d&#039;offres en cours\u00a0: Actuellement, ADP a 8 appels d&#039;offres en cours d&#039;une valeur totale d&#039;environ 243 millions d&#039;euros.<\/li>\n\n\n\n<li>Pr\u00e9visions de renouvellement\u00a0: L\u2019autorit\u00e9 dispose d\u2019un important portefeuille de 301 renouvellements d\u2019une valeur de 8,4 milliards d\u2019euros, ce qui indique un flux constant d\u2019opportunit\u00e9s futures.<\/li>\n\n\n\n<li>Renouvellements similaires : sp\u00e9cifiquement dans le cadre de cet appel d&#039;offres, il existe 14 renouvellements d&#039;une valeur de 173 millions d&#039;euros.<\/li>\n\n\n\n<li>Attribution de contrats\u00a0: Les donn\u00e9es indiquent 50 attributions de contrats distinctes pour une valeur totale de 266 millions d\u2019euros.<\/li>\n\n\n\n<li>Attributions de contrats similaires\u00a0: Le syst\u00e8me signale 360 attributions de contrats similaires, ce qui sugg\u00e8re que la fourniture et la maintenance d\u2019\u00e9quipements \u00e9lectriques constituent une cat\u00e9gorie d\u2019approvisionnement r\u00e9currente et fr\u00e9quente pour cet acheteur.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Ce profil d&#039;activit\u00e9 r\u00e9v\u00e8le une organisation qui s&#039;appuie fortement sur des contrats externes structur\u00e9s et de longue dur\u00e9e pour assurer son fonctionnement. Le volume consid\u00e9rable des renouvellements (8,4 milliards d&#039;euros) indique qu&#039;une fois int\u00e9gr\u00e9 \u00e0 l&#039;\u00e9cosyst\u00e8me ADP, le potentiel de revenus r\u00e9currents et de prolongation de contrat est exceptionnellement \u00e9lev\u00e9. L&#039;appel d&#039;offres actuel, d&#039;une dur\u00e9e de 96 mois, s&#039;inscrit parfaitement dans cette strat\u00e9gie de fid\u00e9lisation des fournisseurs \u00e0 long terme.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">PAYSAGE CONCURRENTIEL<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Pour tout soumissionnaire potentiel, il est essentiel de comprendre qui remporte actuellement les contrats avec ADP. Les donn\u00e9es \u201c\u00a0Laur\u00e9ats de contrats similaires\u00a0\u201d offrent un aper\u00e7u du march\u00e9 actuel des fournitures \u00e9lectriques et d\u2019\u00e9clairage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Principaux entrepreneurs\u00a0: Les donn\u00e9es disponibles mettent en \u00e9vidence un entrepreneur sp\u00e9cifique pertinent dans ce domaine\u00a0:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u00c9CLAIRAGE FONROCHE\n<ul class=\"wp-block-list\">\n<li>Nombre de contrats : 1<\/li>\n\n\n\n<li>Pays : France<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Bien que les donn\u00e9es mettent sp\u00e9cifiquement en \u00e9vidence Fonroche Lighting comme laur\u00e9at d&#039;un contrat similaire, le contexte plus large des \u201c\u00a0Autres acheteurs avec des projets similaires\u00a0\u201d r\u00e9v\u00e8le un march\u00e9 de 681 entit\u00e9s, repr\u00e9sentant un volume de projets d&#039;un milliard d&#039;euros. Cela sugg\u00e8re que, malgr\u00e9 la pr\u00e9sence d&#039;acteurs historiques sur le march\u00e9 ADP, ce dernier est vaste et concurrentiel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Mod\u00e8les cl\u00e9s\u00a0:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Domination fran\u00e7aise : <\/strong>Les donn\u00e9es relatives au pays du contractant indiquent explicitement la France comme pays d&#039;origine du laur\u00e9at d\u00e9sign\u00e9. Compte tenu de l&#039;exigence stricte de ma\u00eetrise du fran\u00e7ais pour les offres dans le cadre de cet appel d&#039;offres, il est fort probable que les entreprises nationales ou les entreprises internationales disposant de filiales fran\u00e7aises importantes dominent le processus de s\u00e9lection.<\/li>\n\n\n\n<li><strong>Sp\u00e9cialisation: <\/strong>La pr\u00e9sence d&#039;un fournisseur sp\u00e9cialis\u00e9 en \u00e9clairage (Fonroche) laisse supposer qu&#039;ADP segmente ses besoins en mat\u00e9riel \u00e9lectrique. Cependant, l&#039;appel d&#039;offres actuel couvre les \u201c\u00a0mat\u00e9riaux \u00e9lectriques\u00a0\u201d au sens large (CPV 31681410), ce qui implique la n\u00e9cessit\u00e9 de faire appel \u00e0 un distributeur g\u00e9n\u00e9raliste ou \u00e0 un consortium capable de couvrir une large gamme de r\u00e9f\u00e9rences \u00e9lectriques, et pas seulement l&#039;\u00e9clairage.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">SIGNAUX COMMERCIAUX ET PROC\u00c9DURAL<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Cet appel d&#039;offres ne suit pas une proc\u00e9dure ouverte classique. Plusieurs \u00e9l\u00e9ments cl\u00e9s de la documentation pr\u00e9cisent le d\u00e9roulement de cette proc\u00e9dure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Proc\u00e9dure \u201c n\u00e9goci\u00e9e \u201d\u00a0: La proc\u00e9dure est d\u00e9crite comme \u201c\u00a0n\u00e9goci\u00e9e apr\u00e8s publication pr\u00e9alable d\u2019un appel d\u2019offres\u00a0\u201d. Il s\u2019agit d\u2019une approche diff\u00e9rente des appels d\u2019offres ouverts classiques. Cela signifie qu\u2019ADP entend pr\u00e9s\u00e9lectionner des candidats qualifi\u00e9s, puis engager un dialogue afin d\u2019affiner les aspects techniques et financiers des offres. Pour les soumissionnaires, cela signifie que le d\u00e9p\u00f4t initial n\u2019est que la premi\u00e8re \u00e9tape\u00a0; la capacit\u00e9 \u00e0 n\u00e9gocier les sp\u00e9cifications techniques et les structures de prix apr\u00e8s le d\u00e9p\u00f4t sera d\u00e9terminante pour remporter l\u2019appel d\u2019offres.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le descriptif de la nouvelle consultation\u00a0: La \u201c\u00a0description succincte\u00a0\u201d indique clairement qu\u2019il s\u2019agit d\u2019une relance. Une consultation pr\u00e9c\u00e9dente (r\u00e9f\u00e9rence JOUE 191318-2025, publi\u00e9e le 25\/03\/2025) a \u00e9t\u00e9 d\u00e9clar\u00e9e \u201c\u00a0sans suite\u00a0\u201d suite \u00e0 une \u201c\u00a0modification des besoins op\u00e9rationnels\u00a0\u201d d\u2019A\u00e9roports de Paris.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Valeur pr\u00e9c\u00e9dente : 35 000 000,00 \u20ac<\/li>\n\n\n\n<li>Valeur actuelle : 30 000 000,00 \u20ac<\/li>\n\n\n\n<li>Cons\u00e9quence\u00a0: ADP a revu ses exigences \u00e0 la baisse de 5 millions d\u2019euros. Les soumissionnaires ayant particip\u00e9 \u00e0 l\u2019appel d\u2019offres de 2025 doivent analyser attentivement les nouvelles clauses techniques afin de bien comprendre les modifications apport\u00e9es au p\u00e9rim\u00e8tre du contrat.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Structure de l\u2019accord-cadre\u00a0: Le contrat est un accord-cadre assorti de bons de commande. Il est multi-attributs, ce qui signifie qu\u2019ADP s\u00e9lectionnera au maximum deux titulaires.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Signal strat\u00e9gique\u00a0: ADP ne souhaite pas d\u00e9pendre d\u2019un seul fournisseur pendant huit ans. L\u2019entreprise mise sur la redondance. Arriver deuxi\u00e8me est presque aussi pr\u00e9cieux qu\u2019arriver premier, car cela garantit l\u2019acc\u00e8s au cadre de r\u00e9f\u00e9rence pendant pr\u00e8s d\u2019une d\u00e9cennie.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Pression temporelle extr\u00eame<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Publication : 17 f\u00e9vrier 2026.<\/li>\n\n\n\n<li>Date limite : 3 mars 2026.<\/li>\n\n\n\n<li>D\u00e9lai : seulement 14 jours.<\/li>\n\n\n\n<li>Cons\u00e9quence : Le d\u00e9lai imparti est exceptionnellement court pour un contrat de 30 millions d&#039;euros, surtout s&#039;il implique des n\u00e9gociations. Cela laisse fortement penser qu&#039;ADP a des exigences bien d\u00e9finies et potentiellement une liste de fournisseurs pr\u00e9s\u00e9lectionn\u00e9s. Les nouveaux entrants doivent donc agir tr\u00e8s rapidement pour constituer un dossier conforme.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">ANALYSE NARRATIVE \/ INTERPR\u00c9TATION<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Le lancement de cet appel d&#039;offres de 30 millions d&#039;euros par A\u00e9roports de Paris repr\u00e9sente bien plus qu&#039;une simple commande de c\u00e2bles et de commutateurs\u00a0: il s&#039;agit d&#039;un r\u00e9ajustement strat\u00e9gique de sa cha\u00eene d&#039;approvisionnement. La r\u00e9duction du montant de l&#039;appel d&#039;offres initial de 35 millions d&#039;euros, annul\u00e9 en 2025, \u00e0 30 millions d&#039;euros t\u00e9moigne d&#039;un p\u00e9rim\u00e8tre plus restreint et cibl\u00e9. ADP a consacr\u00e9 pr\u00e8s d&#039;un an \u00e0 repenser ce besoin, et le r\u00e9sultat est un dispositif all\u00e9g\u00e9 et p\u00e9renne, con\u00e7u pour garantir les prix et la disponibilit\u00e9 des produits jusqu&#039;\u00e0 la fin de la d\u00e9cennie.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le choix d&#039;une proc\u00e9dure n\u00e9goci\u00e9e pour un contrat d&#039;approvisionnement est r\u00e9v\u00e9lateur. Habituellement, les fournitures sont achet\u00e9es par appel d&#039;offres ouvert o\u00f9 le prix est le crit\u00e8re principal. En optant pour la n\u00e9gociation, ADP indique que la compatibilit\u00e9 technique, la logistique et, \u00e9ventuellement, la capacit\u00e9 d&#039;int\u00e9gration aux syst\u00e8mes a\u00e9roportuaires existants sont aussi importantes que le co\u00fbt unitaire. L&#039;entreprise souhaite pouvoir discuter des modalit\u00e9s de livraison, et pas seulement du contenu.\u201c<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">De plus, la dur\u00e9e de 96 mois constitue une mesure audacieuse en faveur de la stabilit\u00e9. Dans un contexte de fluctuations des co\u00fbts des mati\u00e8res premi\u00e8res (cuivre, composants \u00e9lectroniques), la s\u00e9curisation d&#039;un contrat-cadre sur huit ans offre \u00e0 ADP une meilleure pr\u00e9visibilit\u00e9 budg\u00e9taire. Pour les soumissionnaires retenus, cela repr\u00e9sente toutefois un d\u00e9fi de gestion des risques\u00a0: comment fixer le prix des mat\u00e9riaux pour 2034 d\u00e8s 2026\u00a0? La \u201c\u00a0modification des besoins op\u00e9rationnels\u00a0\u201d invoqu\u00e9e pour justifier l&#039;annulation pr\u00e9c\u00e9dente pourrait bien \u00eatre li\u00e9e \u00e0 ces engagements d&#039;indexation et de volumes \u00e0 long terme.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les utilisateurs d&#039;Hermix qui analysent cet appel d&#039;offres constatent que, malgr\u00e9 un d\u00e9lai serr\u00e9, l&#039;enjeu est un contrat fondamental qui garantit les revenus du secteur public d&#039;une entreprise pour pr\u00e8s de dix ans. Les donn\u00e9es sugg\u00e8rent que, m\u00eame si le march\u00e9 est concentr\u00e9 entre les acteurs en place, la structure \u201c\u00a0multi-attributaire\u00a0\u201d (\u00e0 plusieurs gagnants) ouvre la voie \u00e0 un nouveau venu pour occuper la deuxi\u00e8me place aux c\u00f4t\u00e9s d&#039;un acteur principal.<\/p>\n\n\n\n\n\n\n<h2 class=\"wp-block-heading\">POINTS PRATIQUES \u00c0 RETENIR POUR LES SOUMISSIONNAIRES<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Compte tenu des contraintes strictes et des donn\u00e9es contenues dans le PDF, voici ce que les soumissionnaires doivent savoir pour \u00eatre admissibles.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u00c0 qui s&#039;adresse ce march\u00e9\u00a0:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Grands distributeurs de mat\u00e9riel \u00e9lectrique\u00a0: La valeur de 30 millions d\u2019euros et le large champ d\u2019application (\u201c\u00a0Mat\u00e9riaux \u00e9lectriques\u00a0\u201d) favorisent les grands distributeurs plut\u00f4t que les fabricants de niche.<\/li>\n\n\n\n<li>Entit\u00e9s francophones\u00a0: L\u2019offre est r\u00e9dig\u00e9e exclusivement en fran\u00e7ais. Toute la documentation technique, les n\u00e9gociations et la gestion contractuelle continue se d\u00e9rouleront en fran\u00e7ais.<\/li>\n\n\n\n<li>Consortiums : Compte tenu de la r\u00e8gle des \u201c 2 d\u00e9tenteurs maximum \u201d et de l\u2019\u00e9tendue de \u201c tous les sites \u201d (Val-de-Marne, Seine-Saint-Denis), un consortium entre un sp\u00e9cialiste de la logistique et un fournisseur technique pourrait constituer une strat\u00e9gie efficace.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Points d'attention critiques :<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Action imm\u00e9diate requise\u00a0: Vous disposez d\u2019environ deux semaines entre la date de publication (17\/02) et la date limite (03\/03). Ce d\u00e9lai est \u00e0 peine suffisant pour prendre connaissance du cahier des charges et pr\u00e9parer votre offre. Les documents administratifs doivent \u00eatre pr\u00eats d\u00e8s maintenant.<\/li>\n\n\n\n<li>Veuillez prendre connaissance des modifications\u00a0: si vous avez acc\u00e9d\u00e9 \u00e0 l\u2019appel d\u2019offres pr\u00e9c\u00e9dent (JOUE 191318-2025), ne copiez pas votre offre. Le budget a \u00e9t\u00e9 r\u00e9duit de 5\u00a0millions d\u2019euros. Vous devez indiquer les points de r\u00e9duction du p\u00e9rim\u00e8tre.<\/li>\n\n\n\n<li>Strat\u00e9gie tarifaire sur 8 ans\u00a0: Le contrat a une dur\u00e9e de 96 mois. Assurez-vous que votre offre financi\u00e8re comprenne des clauses de r\u00e9vision robustes ou des strat\u00e9gies de couverture des co\u00fbts des mat\u00e9riaux, car il s\u2019agit d\u2019un accord-cadre vous engageant.<\/li>\n\n\n\n<li>Pr\u00e9paration \u00e0 la n\u00e9gociation\u00a0: Pr\u00e9parez vos \u00e9quipes techniques aux entretiens. La proc\u00e9dure \u201c\u00a0n\u00e9goci\u00e9e\u00a0\u201d signifie que vous devez \u00eatre en mesure de d\u00e9fendre la fiabilit\u00e9 de votre cha\u00eene d\u2019approvisionnement et votre adaptabilit\u00e9 technique en personne (ou par vid\u00e9o) apr\u00e8s la soumission initiale.<\/li>\n\n\n\n<li>Strat\u00e9gie du double gagnant\u00a0: visez les deux premi\u00e8res places. Il n\u2019est pas n\u00e9cessaire d\u2019\u00eatre le moins cher pour obtenir une place dans le cadre de l\u2019accord, mais vous devez figurer parmi les deux offres les plus avantageuses \u00e9conomiquement pour garantir la dur\u00e9e de 8\u00a0ans.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A\u00e9roports de Paris a clairement manifest\u00e9 sa volont\u00e9 de p\u00e9renniser son infrastructure d&#039;alimentation \u00e9lectrique. Ce contrat de 30 millions d&#039;euros repr\u00e9sente une opportunit\u00e9 cruciale pour les fournisseurs de s&#039;int\u00e9grer aux op\u00e9rations d&#039;un hub de transport de classe mondiale jusqu&#039;en 2034. En tirant parti des sp\u00e9cificit\u00e9s de la proc\u00e9dure, telles que le format n\u00e9goci\u00e9 et le p\u00e9rim\u00e8tre r\u00e9duit suite \u00e0 l&#039;annulation pr\u00e9c\u00e9dente, les soumissionnaires les plus avis\u00e9s peuvent transformer cet appel d&#039;offres, soumis \u00e0 une forte pression et aux d\u00e9lais tr\u00e8s courts, en une victoire d\u00e9cisive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cr\u00e9ez votre compte gratuit d\u00e8s aujourd'hui <a href=\"https:\/\/hermix.com\/fr\/sinscrire\/\">https:\/\/hermix.com\/sign-up\/<\/a> et remportez plus de march\u00e9s publics gr\u00e2ce \u00e0 l'approche ax\u00e9e sur les donn\u00e9es qui aide les entreprises \u00e0 r\u00e9ussir syst\u00e9matiquement dans les ventes B2G \u00e0 travers l'Europe.<\/p>\n\n\n<figure class=\"wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1200\" height=\"628\" src=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"A\u00e9roports de Paris lance un accord-cadre de 30 millions d&#039;euros sur huit ans pour l&#039;approvisionnement en mat\u00e9riel \u00e9lectrique.\" style=\"object-fit:cover;\" srcset=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png 1200w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image-300x157.png 300w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image-1024x536.png 1024w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image-768x402.png 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":7562,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_angie_page":false,"content-type":"","inline_featured_image":false,"page_builder":"","footnotes":""},"categories":[35],"tags":[],"ppma_author":[17],"class_list":["post-7561","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tender-analysis"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Andreea Ilie\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"fr_FR\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Hermix - Win Public Contracts with the Power of AI\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix\" \/>\n\t\t<meta property=\"og:description\" content=\"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-03-12T11:33:16+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-03-12T11:33:16+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/hermixapp\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:title\" content=\"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix\" \/>\n\t\t<meta name=\"twitter:description\" content=\"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#blogposting\",\"name\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix\",\"headline\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework\",\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/author\\\/andreea-ilie\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\",\"width\":1200,\"height\":628,\"caption\":\"A\\u00e9roports de Paris Launches-\\u20ac30 Million Eight-Year Electrical Materials Supply Framework\"},\"datePublished\":\"2026-03-12T12:33:16+02:00\",\"dateModified\":\"2026-03-12T12:33:16+02:00\",\"inLanguage\":\"fr-FR\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#webpage\"},\"articleSection\":\"Tender Analysis, Andreea Ilie\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hermix.com\\\/fr\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/category\\\/tender-analysis\\\/#listItem\",\"position\":2,\"name\":\"Tender Analysis\",\"item\":\"https:\\\/\\\/hermix.com\\\/fr\\\/category\\\/tender-analysis\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#listItem\",\"name\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#listItem\",\"position\":3,\"name\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/#organization\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"url\":\"https:\\\/\\\/hermix.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.hermix.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hermix_logo.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/hermixapp\",\"https:\\\/\\\/twitter.com\\\/Hermix_sw\",\"https:\\\/\\\/www.instagram.com\\\/hermix_sw\\\/\",\"https:\\\/\\\/be.linkedin.com\\\/company\\\/hermix\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/author\\\/andreea-ilie\\\/#author\",\"url\":\"https:\\\/\\\/hermix.com\\\/fr\\\/author\\\/andreea-ilie\\\/\",\"name\":\"Andreea Ilie\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#webpage\",\"url\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/\",\"name\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix\",\"description\":\"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\\\/\\\/app.hermix.com\\\/opportunities\\\/00110820-2026 A\\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued\",\"inLanguage\":\"fr-FR\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/author\\\/andreea-ilie\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/author\\\/andreea-ilie\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#mainImage\",\"width\":1200,\"height\":628,\"caption\":\"A\\u00e9roports de Paris Launches-\\u20ac30 Million Eight-Year Electrical Materials Supply Framework\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#mainImage\"},\"datePublished\":\"2026-03-12T12:33:16+02:00\",\"dateModified\":\"2026-03-12T12:33:16+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/hermix.com\\\/fr\\\/\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"inLanguage\":\"fr-FR\",\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"A\u00e9roports de Paris lance un accord-cadre de 30 millions d&#039;euros sur huit ans pour l&#039;approvisionnement en mat\u00e9riel \u00e9lectrique - Hermix","description":"Un accord-cadre de grande envergure, d&#039;une dur\u00e9e de 96 mois, vise \u00e0 standardiser l&#039;infrastructure \u00e9lectrique des a\u00e9roports parisiens suite \u00e0 une r\u00e9\u00e9valuation strat\u00e9gique des besoins op\u00e9rationnels. Cr\u00e9ez un compte gratuit et consultez l&#039;int\u00e9gralit\u00e9 de l&#039;appel d&#039;offres ici\u00a0: https:\/\/app.hermix.com\/opportunities\/00110820-2026. A\u00e9roports de Paris (ADP) a officiellement lanc\u00e9 un important appel d&#039;offres concernant la fourniture d&#039;\u00e9quipements \u00e9lectriques pour l&#039;ensemble de ses sites.","canonical_url":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#blogposting","name":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix","headline":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework","author":{"@id":"https:\/\/hermix.com\/fr\/author\/andreea-ilie\/#author"},"publisher":{"@id":"https:\/\/hermix.com\/fr\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png","width":1200,"height":628,"caption":"A\u00e9roports de Paris Launches-\u20ac30 Million Eight-Year Electrical Materials Supply Framework"},"datePublished":"2026-03-12T12:33:16+02:00","dateModified":"2026-03-12T12:33:16+02:00","inLanguage":"fr-FR","mainEntityOfPage":{"@id":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#webpage"},"isPartOf":{"@id":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#webpage"},"articleSection":"Tender Analysis, Andreea Ilie"},{"@type":"BreadcrumbList","@id":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr#listItem","position":1,"name":"Home","item":"https:\/\/hermix.com\/fr","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr\/category\/tender-analysis\/#listItem","position":2,"name":"Tender Analysis","item":"https:\/\/hermix.com\/fr\/category\/tender-analysis\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#listItem","name":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework"},"previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#listItem","position":3,"name":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework","previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}}]},{"@type":"Organization","@id":"https:\/\/hermix.com\/fr\/#organization","name":"Hermix","description":"Win Public Contracts with the Power of AI","url":"https:\/\/hermix.com\/fr\/","logo":{"@type":"ImageObject","url":"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png","@id":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#organizationLogo"},"image":{"@id":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/hermixapp","https:\/\/twitter.com\/Hermix_sw","https:\/\/www.instagram.com\/hermix_sw\/","https:\/\/be.linkedin.com\/company\/hermix"]},{"@type":"Person","@id":"https:\/\/hermix.com\/fr\/author\/andreea-ilie\/#author","url":"https:\/\/hermix.com\/fr\/author\/andreea-ilie\/","name":"Andreea Ilie"},{"@type":"WebPage","@id":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#webpage","url":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/","name":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix","description":"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued","inLanguage":"fr-FR","isPartOf":{"@id":"https:\/\/hermix.com\/fr\/#website"},"breadcrumb":{"@id":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#breadcrumblist"},"author":{"@id":"https:\/\/hermix.com\/fr\/author\/andreea-ilie\/#author"},"creator":{"@id":"https:\/\/hermix.com\/fr\/author\/andreea-ilie\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png","@id":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#mainImage","width":1200,"height":628,"caption":"A\u00e9roports de Paris Launches-\u20ac30 Million Eight-Year Electrical Materials Supply Framework"},"primaryImageOfPage":{"@id":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#mainImage"},"datePublished":"2026-03-12T12:33:16+02:00","dateModified":"2026-03-12T12:33:16+02:00"},{"@type":"WebSite","@id":"https:\/\/hermix.com\/fr\/#website","url":"https:\/\/hermix.com\/fr\/","name":"Hermix","description":"Win Public Contracts with the Power of AI","inLanguage":"fr-FR","publisher":{"@id":"https:\/\/hermix.com\/fr\/#organization"}}]},"og:locale":"fr_FR","og:site_name":"Hermix - Win Public Contracts with the Power of AI","og:type":"article","og:title":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix","og:description":"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued","og:url":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/","og:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png","og:image:secure_url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png","og:image:width":1200,"og:image:height":628,"article:published_time":"2026-03-12T11:33:16+00:00","article:modified_time":"2026-03-12T11:33:16+00:00","article:publisher":"https:\/\/www.facebook.com\/hermixapp","twitter:card":"summary_large_image","twitter:site":"@Hermix_sw","twitter:title":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix","twitter:description":"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued","twitter:creator":"@Hermix_sw","twitter:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png"},"aioseo_meta_data":{"post_id":"7561","title":null,"description":null,"keywords":null,"keyphrases":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-08-20 11:55:20","updated":"2026-08-20 11:55:20"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/fr\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/fr\/category\/tender-analysis\/\" title=\"Tender Analysis\">Tender Analysis<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tA\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/hermix.com\/fr"},{"label":"Tender Analysis","link":"https:\/\/hermix.com\/fr\/category\/tender-analysis\/"},{"label":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework","link":"https:\/\/hermix.com\/fr\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/"}],"authors":[{"term_id":17,"user_id":3,"is_guest":0,"slug":"andreea-ilie","display_name":"Andreea Ilie","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/cb0674b58c82c13f3140f57ce6b238abab5257f06d482468c588e76c72b29e8c?s=96&d=mm&r=g","author_category":"","first_name":"","last_name":"","user_url":"","job_title":"","description":""}],"_links":{"self":[{"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/posts\/7561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/comments?post=7561"}],"version-history":[{"count":0,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/posts\/7561\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/media\/7562"}],"wp:attachment":[{"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/media?parent=7561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/categories?post=7561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/tags?post=7561"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/ppma_author?post=7561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}