{"id":11122,"date":"2026-10-01T16:51:40","date_gmt":"2026-10-01T13:51:40","guid":{"rendered":"https:\/\/hermix.com\/?p=11122"},"modified":"2026-10-01T16:51:41","modified_gmt":"2026-10-01T13:51:41","slug":"appel-doffres-public-du-conseil-municipal-de-nottingham-pour-un-portique-ferroviaire-et-une-tuyauterie-de-vapeur-haute-pression","status":"publish","type":"post","link":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/","title":{"rendered":"Appel d&#039;offres public du conseil municipal de Nottingham pour un portique ferroviaire et une tuyauterie de vapeur haute pression"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Consulter l&#039;int\u00e9gralit\u00e9 des donn\u00e9es de l&#039;appel d&#039;offres\u00a0: <a href=\"https:\/\/app.hermix.com\/opportunities\/ukfts_066991-2026\">https:\/\/app.hermix.com\/opportunities\/ukfts_066991-2026<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Un contrat de conception-construction de 3,54 millions d&#039;euros lie l&#039;infrastructure de chauffage urbain, la construction de l&#039;interface ferroviaire et un objectif de mise en service fix\u00e9 \u00e0 juillet 2027.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La municipalit\u00e9 de Nottingham lance l&#039;acquisition d&#039;un nouveau portique ferroviaire et des canalisations associ\u00e9es \u00e0 proximit\u00e9 de la gare de Nottingham. Le projet comprend la conception (phase 4 selon les normes RIBA), la construction et la mise en service de la nouvelle infrastructure, suivies de la d\u00e9molition et de l&#039;enl\u00e8vement du portique existant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le nouveau dispositif acheminera la vapeur haute pression alimentant la centrale thermique de London Road, g\u00e9r\u00e9e par le Conseil. Le r\u00e9seau de chauffage urbain fournit chauffage et eau chaude \u00e0 environ 5\u00a0000 foyers et entreprises, tandis qu&#039;un r\u00e9seau priv\u00e9 associ\u00e9 dessert environ 200 utilisateurs r\u00e9sidentiels et commerciaux.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Pr\u00e9sentation de l'opportunit\u00e9<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Autorit\u00e9 contractante : <\/strong>CONSEIL MUNICIPAL DE NOTTINGHAM<\/li>\n\n\n\n<li><strong>Type d&#039;acheteur : <\/strong>Minist\u00e8re ou toute autre autorit\u00e9 nationale ou f\u00e9d\u00e9rale<\/li>\n\n\n\n<li><strong>Activit\u00e9 principale :<\/strong> Inconnu<\/li>\n\n\n\n<li><strong>Num\u00e9ro de r\u00e9f\u00e9rence :<\/strong> CPU8222<\/li>\n\n\n\n<li><strong>Identifiants des documents\u00a0:<\/strong> ukfts_066991-2026 et 066991-2026<\/li>\n\n\n\n<li><strong>Contact :<\/strong> <a href=\"mailto:procurement@nottinghamcity.gov.uk\">procurement@nottinghamcity.gov.uk<\/a><\/li>\n\n\n\n<li><strong>\u00c9tendue des travaux\u00a0: <\/strong>Conception et construction, selon la phase 4 du RIBA, d&#039;un nouveau portique ferroviaire et de la tuyauterie associ\u00e9e, mise en service de la nouvelle tuyauterie et des connexions \u00e9lectriques, et d\u00e9molition et enl\u00e8vement du portique existant.<\/li>\n\n\n\n<li><strong>Structure du lot :<\/strong> Un lot, CPU8222 Portique ferroviaire et tuyauterie associ\u00e9e, d&#039;une valeur de 3\u00a0543\u00a0502,40 \u20ac<\/li>\n\n\n\n<li><strong>Lieu de repr\u00e9sentation :<\/strong> Nottingham<\/li>\n\n\n\n<li><strong>Type de contrat : <\/strong>\u00c7a marche<\/li>\n\n\n\n<li><strong>Dur\u00e9e du contrat : <\/strong>9 mois<\/li>\n\n\n\n<li><strong>Type de proc\u00e9dure :<\/strong> Proc\u00e9dure flexible et comp\u00e9titive<\/li>\n\n\n\n<li><strong>Crit\u00e8res d&#039;attribution\u00a0:<\/strong> Prix de l&#039;\u00e9tape 1\u00a0: 20%\u00a0; Prix de l&#039;\u00e9tape 2\u00a0: 25%\u00a0; \u00c9quipe de r\u00e9alisation\u00a0: 18%\u00a0; Approche de conception et de construction\u00a0: 18%\u00a0; Programme\u00a0: 9%\u00a0; Durabilit\u00e9 et valeur sociale\u00a0: 10%<\/li>\n\n\n\n<li><strong>Date de publication : <\/strong>15 juillet 2026<\/li>\n\n\n\n<li><strong>Date limite de soumission\u00a0:<\/strong> 16 septembre 2026<\/li>\n\n\n\n<li><strong>Date d&#039;ouverture des soumissions : <\/strong>16 septembre 2026<\/li>\n\n\n\n<li><strong>Mise en service cibl\u00e9e\u00a0: <\/strong>Fermeture estivale en juillet 2027<\/li>\n\n\n\n<li><strong>Financement de l&#039;UE : <\/strong>Non<\/li>\n\n\n\n<li><strong>Source<\/strong> Royaume-Uni \u2013 Service de recherche d&#039;appels d&#039;offres<\/li>\n\n\n\n<li><strong>Avis connexes\u00a0: <\/strong>Avis d\u2019information pr\u00e9alable UKFTS_048800-2026 publi\u00e9 le 26 mai 2026\u00a0; avis de march\u00e9 UKFTS_066991-2026 et rectificatif UKFTS_066994-2026 publi\u00e9s le 15 juillet 2026<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pr\u00eat \u00e0 qualifier des appels d'offres de ce type plus rapidement ? <\/strong>Cr\u00e9ez votre compte Hermix gratuit sur <a href=\"https:\/\/hermix.com\/fr\/sinscrire\/\">https:\/\/hermix.com\/sign-up\/<\/a> et acc\u00e9dez \u00e0 une analyse des appels d'offres propuls\u00e9e par l'IA, \u00e0 une veille concurrentielle et \u00e0 une surveillance automatis\u00e9e sur le march\u00e9 europ\u00e9en des march\u00e9s publics de 2 000 milliards d'euros.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Contexte d'autorit\u00e9 et d'approvisionnement<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Le projet soutient un r\u00e9seau de chauffage urbain existant, aliment\u00e9 par de la vapeur \u00e0 haute pression provenant de l&#039;incin\u00e9rateur d&#039;Eastcroft situ\u00e9 \u00e0 proximit\u00e9. La conduite de vapeur actuelle franchit la voie ferr\u00e9e sur un portique \u00e0 l&#039;est de la gare de Nottingham et \u00e0 l&#039;ouest de London Road. Le Conseil a \u00e9t\u00e9 sollicit\u00e9 pour d\u00e9placer ce portique plus pr\u00e8s de London Road afin de permettre la r\u00e9alisation d&#039;un projet immobilier sur un terrain situ\u00e9 au nord de la voie ferr\u00e9e.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La conception de phase 3 selon le cahier des charges RIBA est achev\u00e9e et une demande de permis de construire est en cours. L&#039;entreprise retenue, ou un membre du consortium dans le cadre d&#039;une offre group\u00e9e, doit \u00eatre agr\u00e9\u00e9e par Network Rail et poss\u00e9der une exp\u00e9rience av\u00e9r\u00e9e dans la construction et la mise en service de r\u00e9seaux de tuyauterie vapeur haute pression, de canalisations auxiliaires et de raccordements \u00e9lectriques.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le profil de l&#039;acheteur recense 9 appels d&#039;offres ouverts similaires d&#039;une valeur de 1,1 milliard d&#039;euros, 249 renouvellements similaires d&#039;une valeur de 3,3 milliards d&#039;euros, environ 1\u00a0200 attributions de march\u00e9s similaires d&#039;une valeur de 1,6 milliard d&#039;euros et 47 avis pr\u00e9alables similaires d&#039;une valeur de 254 millions d&#039;euros. Au-del\u00e0 de ce profil, on observe 11 appels d&#039;offres ouverts d&#039;une valeur de 1,1 milliard d&#039;euros, 694 renouvellements d&#039;une valeur de 6,5 milliards d&#039;euros, environ 3\u00a0000 attributions de march\u00e9s d&#039;une valeur de 4,9 milliards d&#039;euros et 131 avis pr\u00e9alables d&#039;une valeur de 467 millions d&#039;euros. Environ 7\u00a0000 autres acheteurs, impliqu\u00e9s dans des projets similaires, repr\u00e9sentent un montant total de 1\u00a0000 milliards d&#039;euros.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Paysage concurrentiel<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">L&#039;affichage des entreprises comparables est limit\u00e9 \u00e0 10 r\u00e9sultats. Les chiffres ci-dessous correspondent aux valeurs et au nombre de contrats de ces fournisseurs\u00a0; les moyennes affich\u00e9es sont des indicateurs de march\u00e9 arrondis.<\/p>\n\n\n\n<figure class=\"wp-block-table aligncenter\"><table class=\"has-fixed-layout\"><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Entrepreneur<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Valeur<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Contrats<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Moyenne<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">GESTION DES SERVICES PUBLICS DE CONFIANCE<\/td><td class=\"has-text-align-center\" data-align=\"center\">77 millions d&#039;euros<\/td><td class=\"has-text-align-center\" data-align=\"center\">175<\/td><td class=\"has-text-align-center\" data-align=\"center\">456 000 \u20ac<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">THOMAS BOW<\/td><td class=\"has-text-align-center\" data-align=\"center\">166 millions d&#039;euros<\/td><td class=\"has-text-align-center\" data-align=\"center\">157<\/td><td class=\"has-text-align-center\" data-align=\"center\">1,1 million d&#039;euros<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">COLAS<\/td><td class=\"has-text-align-center\" data-align=\"center\">53 millions d&#039;euros<\/td><td class=\"has-text-align-center\" data-align=\"center\">56<\/td><td class=\"has-text-align-center\" data-align=\"center\">962\u00a0000 \u20ac<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">HANSON CARRIRY PRODUCTS EUROPE TA HEIDELBERG MATERIALS CONTR<\/td><td class=\"has-text-align-center\" data-align=\"center\">5,9 millions d&#039;euros<\/td><td class=\"has-text-align-center\" data-align=\"center\">29<\/td><td class=\"has-text-align-center\" data-align=\"center\">202 000 \u20ac<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">WATERMAN ASPEN<\/td><td class=\"has-text-align-center\" data-align=\"center\">3,1 millions d&#039;euros<\/td><td class=\"has-text-align-center\" data-align=\"center\">22<\/td><td class=\"has-text-align-center\" data-align=\"center\">147 000 \u20ac<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">COMMERCE DE TARMAC<\/td><td class=\"has-text-align-center\" data-align=\"center\">18 millions d&#039;euros<\/td><td class=\"has-text-align-center\" data-align=\"center\">19<\/td><td class=\"has-text-align-center\" data-align=\"center\">1 million d&#039;euros<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">ST CONSTRUCTION<\/td><td class=\"has-text-align-center\" data-align=\"center\">1,2 million d&#039;euros<\/td><td class=\"has-text-align-center\" data-align=\"center\">18<\/td><td class=\"has-text-align-center\" data-align=\"center\">68 000 \u20ac<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">GROUPE LINDUM<\/td><td class=\"has-text-align-center\" data-align=\"center\">6,4 millions d&#039;euros<\/td><td class=\"has-text-align-center\" data-align=\"center\">17<\/td><td class=\"has-text-align-center\" data-align=\"center\">375 000 \u20ac<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">VOCON<\/td><td class=\"has-text-align-center\" data-align=\"center\">1 million d&#039;euros<\/td><td class=\"has-text-align-center\" data-align=\"center\">17<\/td><td class=\"has-text-align-center\" data-align=\"center\">65 000 \u20ac<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">KIELY BROS<\/td><td class=\"has-text-align-center\" data-align=\"center\">16 millions d&#039;euros<\/td><td class=\"has-text-align-center\" data-align=\"center\">16<\/td><td class=\"has-text-align-center\" data-align=\"center\">1,1 million d&#039;euros<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Les valeurs affich\u00e9es, arrondies, totalisent environ 347,6 millions d&#039;euros. THOMAS BOW, TRUST UTILITY MANAGEMENT et COLAS repr\u00e9sentent environ 296 millions d&#039;euros, soit 85\u00a0210 milliards de ce total. L&#039;analyse par pays attribue 1,6 milliard d&#039;euros \u00e0 1\u00a0197 contrats comparables au Royaume-Uni, avec une moyenne affich\u00e9e de 1,4 million d&#039;euros.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Signaux commerciaux et proc\u00e9duraux<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>L&#039;\u00e9valuation combine le prix du 45% et la qualit\u00e9 et la valeur sociale du 55%. Le prix est divis\u00e9 entre l&#039;\u00e9tape 1 (20%) et l&#039;\u00e9tape 2 (25%).<\/li>\n\n\n\n<li>L&#039;\u00e9quipe de livraison et l&#039;approche de conception-construction portent chacune le label 18%, ce qui fait des capacit\u00e9s et de la m\u00e9thodologie nomm\u00e9es un \u00e9l\u00e9ment central du score.<\/li>\n\n\n\n<li>L&#039;entrepreneur doit faire progresser le projet existant de l&#039;\u00e9tape 3 du RIBA jusqu&#039;\u00e0 l&#039;\u00e9tape 4, alors m\u00eame que l&#039;autorisation d&#039;urbanisme est toujours en cours de demande.<\/li>\n\n\n\n<li>L&#039;approbation de Network Rail constitue une contrainte de participation explicite pour l&#039;entrepreneur ou un membre du consortium.<\/li>\n\n\n\n<li>La mise en service de la nouvelle canalisation est pr\u00e9vue lors de l&#039;arr\u00eat estival de juillet 2027\u00a0; la cr\u00e9dibilit\u00e9 du programme et la planification de l&#039;interface ferroviaire sont donc essentielles.<\/li>\n\n\n\n<li>Le d\u00e9lai de soumission est de 63 jours calendaires. Un rectificatif a \u00e9t\u00e9 publi\u00e9 le m\u00eame jour que l&#039;avis de march\u00e9, mais le r\u00e9sum\u00e9 actuel n&#039;indique pas les modifications apport\u00e9es. Les soumissionnaires sont invit\u00e9s \u00e0 le consulter avant de r\u00e9pondre.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Contexte strat\u00e9gique et interpr\u00e9tation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Il s&#039;agit d&#039;un remplacement d&#039;infrastructure contraint et non de la construction d&#039;un portique ind\u00e9pendant. L&#039;entrepreneur doit coordonner les autorisations ferroviaires, les syst\u00e8mes de vapeur haute pression, les raccordements \u00e9lectriques, la finalisation de la conception, l&#039;\u00e9tat d&#039;avancement du projet, la mise en service et le d\u00e9mant\u00e8lement de l&#039;installation existante dans le cadre d&#039;un contrat unique de neuf mois.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019objectif d\u2019arr\u00eat pr\u00e9vu en juillet 2027 r\u00e9duit consid\u00e9rablement la marge de man\u0153uvre en cas de retard. Une offre cr\u00e9dible doit d\u00e9montrer comment la nouvelle infrastructure peut \u00eatre con\u00e7ue, approuv\u00e9e, construite et test\u00e9e avant l\u2019arr\u00eat, tout en garantissant la continuit\u00e9 d\u2019un r\u00e9seau de chaleur desservant des milliers d\u2019usagers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les utilisateurs d&#039;Hermix qui analysent cet appel d&#039;offres peuvent acc\u00e9der instantan\u00e9ment \u00e0 ces informations concurrentielles, notamment aux profils d\u00e9taill\u00e9s des contractants, aux tendances de d\u00e9penses des autorit\u00e9s et \u00e0 l&#039;ensemble du processus de renouvellement, en quelques minutes plut\u00f4t qu&#039;en quelques heures.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Enseignements pratiques pour les soumissionnaires<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Qui ce costume tendre<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Les entreprises agr\u00e9\u00e9es par Network Rail, ou les consortiums comprenant un membre agr\u00e9\u00e9, ayant la capacit\u00e9 de r\u00e9aliser des travaux de construction d&#039;interfaces ferroviaires.<\/li>\n\n\n\n<li>Des \u00e9quipes de conception et de construction exp\u00e9riment\u00e9es dans les r\u00e9seaux de tuyauterie vapeur haute pression, les raccordements \u00e9lectriques et la mise en service.<\/li>\n\n\n\n<li>Entreprises capables de g\u00e9rer la conception, la planification, la coordination, la construction, la mise en service et la d\u00e9molition de l&#039;\u00e9tape 4 du RIBA dans le cadre d&#039;un seul programme.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Points d&#039;attention critiques<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>R\u00e9cup\u00e9rez le rectificatif du 15 juillet 2026 et confirmez chaque modification avant de finaliser la r\u00e9ponse.<\/li>\n\n\n\n<li>Preuves claires de l&#039;approbation de Network Rail et de l&#039;exp\u00e9rience pertinente en mati\u00e8re de mise en service de vapeur haute pression.<\/li>\n\n\n\n<li>Construisez la r\u00e9ponse autour de la pond\u00e9ration non tarifaire 55%, en particulier l&#039;\u00e9quipe de livraison et l&#039;approche de conception et de construction.<\/li>\n\n\n\n<li>Pr\u00e9senter un programme qui prot\u00e8ge l&#039;objectif de mise en service pour l&#039;arr\u00eat estival de juillet 2027.<\/li>\n\n\n\n<li>Il convient de tenir compte du fait que le permis de construire est demand\u00e9 plut\u00f4t que d&#039;\u00eatre consid\u00e9r\u00e9 comme accord\u00e9.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Ce projet, d&#039;un montant de 3\u00a0543\u00a0502,40\u00a0\u20ac, comprend un r\u00e9seau de chauffage urbain en service, un passage \u00e0 niveau, la finalisation de la conception et une p\u00e9riode de mise en service d\u00e9finie. La qualification structur\u00e9e devra porter sur les autorisations, l&#039;exp\u00e9rience des syst\u00e8mes de vapeur, la ma\u00eetrise du programme et la capacit\u00e9 \u00e0 mener \u00e0 bien l&#039;ensemble des travaux de remplacement et de d\u00e9molition dans un d\u00e9lai de neuf mois.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cr\u00e9ez votre compte gratuit d\u00e8s aujourd'hui <a href=\"https:\/\/hermix.com\/fr\/sinscrire\/\">https:\/\/hermix.com\/sign-up\/<\/a> et remportez plus de march\u00e9s publics gr\u00e2ce \u00e0 l'approche ax\u00e9e sur les donn\u00e9es qui aide les entreprises \u00e0 r\u00e9ussir syst\u00e9matiquement dans les ventes B2G \u00e0 travers l'Europe.<\/p>\n\n\n<figure class=\"wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1200\" height=\"628\" src=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image.png\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Appel d&#039;offres public du conseil municipal de Nottingham pour un portique ferroviaire et une tuyauterie de vapeur haute pression\" style=\"object-fit:cover;\" srcset=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image.png 1200w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image-300x157.png 300w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image-1024x536.png 1024w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image-768x402.png 768w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image-18x9.png 18w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>View full tender data: https:\/\/app.hermix.com\/opportunities\/ukfts_066991-2026 A \u20ac3.54 million design-and-build contract links district heating infrastructure, railway-interface construction and a fixed July 2027 commissioning target. NOTTINGHAM CITY COUNCIL is procuring a new rail gantry and associated pipework near Nottingham Station. The project covers RIBA Stage 4 design, construction and commissioning of the replacement infrastructure, followed by demolition [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":11124,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","inline_featured_image":false,"page_builder":"","footnotes":"","_ppma_block_editor_authors":""},"categories":[35],"tags":[],"ppma_author":[17],"class_list":["post-11122","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tender-analysis"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Nottingham City Council&#039;s \u20ac3.54M rail gantry tender covers 9 months, with Network Rail approval required and commissioning targeted for July 2027.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Andreea Ilie\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"fr_FR\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Hermix - Win Public Contracts with the Power of AI\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework\" \/>\n\t\t<meta property=\"og:description\" content=\"Nottingham City Council&#039;s \u20ac3.54M rail gantry tender covers 9 months, with Network Rail approval required and commissioning targeted for July 2027.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-01T13:51:40+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-01T13:51:41+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/hermixapp\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:title\" content=\"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Nottingham City Council&#039;s \u20ac3.54M rail gantry tender covers 9 months, with Network Rail approval required and commissioning targeted for July 2027.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/#blogposting\",\"name\":\"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework\",\"headline\":\"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework\",\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/author\\\/andreea-ilie\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image.png\",\"width\":1200,\"height\":628,\"caption\":\"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework\"},\"datePublished\":\"2026-10-01T16:51:40+03:00\",\"dateModified\":\"2026-10-01T16:51:41+03:00\",\"inLanguage\":\"fr-FR\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/#webpage\"},\"articleSection\":\"Tender Analysis, Andreea Ilie\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hermix.com\\\/fr\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/category\\\/tender-analysis\\\/#listItem\",\"position\":2,\"name\":\"Tender Analysis\",\"item\":\"https:\\\/\\\/hermix.com\\\/fr\\\/category\\\/tender-analysis\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/#listItem\",\"name\":\"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/#listItem\",\"position\":3,\"name\":\"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/#organization\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"url\":\"https:\\\/\\\/hermix.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.hermix.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hermix_logo.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/hermixapp\",\"https:\\\/\\\/twitter.com\\\/Hermix_sw\",\"https:\\\/\\\/www.instagram.com\\\/hermix_sw\\\/\",\"https:\\\/\\\/be.linkedin.com\\\/company\\\/hermix\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/author\\\/andreea-ilie\\\/#author\",\"url\":\"https:\\\/\\\/hermix.com\\\/fr\\\/author\\\/andreea-ilie\\\/\",\"name\":\"Andreea Ilie\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/#webpage\",\"url\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/\",\"name\":\"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework\",\"description\":\"Nottingham City Council's \\u20ac3.54M rail gantry tender covers 9 months, with Network Rail approval required and commissioning targeted for July 2027.\",\"inLanguage\":\"fr-FR\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/author\\\/andreea-ilie\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/author\\\/andreea-ilie\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/#mainImage\",\"width\":1200,\"height\":628,\"caption\":\"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\\\/#mainImage\"},\"datePublished\":\"2026-10-01T16:51:40+03:00\",\"dateModified\":\"2026-10-01T16:51:41+03:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/hermix.com\\\/fr\\\/\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"inLanguage\":\"fr-FR\",\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/fr\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Appel d&#039;offres public du conseil municipal de Nottingham pour un portique ferroviaire et une tuyauterie de vapeur haute pression","description":"L&#039;appel d&#039;offres de 3,54 millions d&#039;euros du conseil municipal de Nottingham pour la construction d&#039;un portique ferroviaire couvre une p\u00e9riode de 9 mois, avec l&#039;approbation de Network Rail requise et une mise en service pr\u00e9vue pour juillet 2027.","canonical_url":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/#blogposting","name":"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework","headline":"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework","author":{"@id":"https:\/\/hermix.com\/fr\/author\/andreea-ilie\/#author"},"publisher":{"@id":"https:\/\/hermix.com\/fr\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image.png","width":1200,"height":628,"caption":"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework"},"datePublished":"2026-10-01T16:51:40+03:00","dateModified":"2026-10-01T16:51:41+03:00","inLanguage":"fr-FR","mainEntityOfPage":{"@id":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/#webpage"},"isPartOf":{"@id":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/#webpage"},"articleSection":"Tender Analysis, Andreea Ilie"},{"@type":"BreadcrumbList","@id":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr#listItem","position":1,"name":"Home","item":"https:\/\/hermix.com\/fr","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr\/category\/tender-analysis\/#listItem","position":2,"name":"Tender Analysis","item":"https:\/\/hermix.com\/fr\/category\/tender-analysis\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/#listItem","name":"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework"},"previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/#listItem","position":3,"name":"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework","previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/fr\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}}]},{"@type":"Organization","@id":"https:\/\/hermix.com\/fr\/#organization","name":"Hermix","description":"Win Public Contracts with the Power of AI","url":"https:\/\/hermix.com\/fr\/","logo":{"@type":"ImageObject","url":"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png","@id":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/#organizationLogo"},"image":{"@id":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/hermixapp","https:\/\/twitter.com\/Hermix_sw","https:\/\/www.instagram.com\/hermix_sw\/","https:\/\/be.linkedin.com\/company\/hermix"]},{"@type":"Person","@id":"https:\/\/hermix.com\/fr\/author\/andreea-ilie\/#author","url":"https:\/\/hermix.com\/fr\/author\/andreea-ilie\/","name":"Andreea Ilie"},{"@type":"WebPage","@id":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/#webpage","url":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/","name":"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework","description":"Nottingham City Council's \u20ac3.54M rail gantry tender covers 9 months, with Network Rail approval required and commissioning targeted for July 2027.","inLanguage":"fr-FR","isPartOf":{"@id":"https:\/\/hermix.com\/fr\/#website"},"breadcrumb":{"@id":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/#breadcrumblist"},"author":{"@id":"https:\/\/hermix.com\/fr\/author\/andreea-ilie\/#author"},"creator":{"@id":"https:\/\/hermix.com\/fr\/author\/andreea-ilie\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image.png","@id":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/#mainImage","width":1200,"height":628,"caption":"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework"},"primaryImageOfPage":{"@id":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/#mainImage"},"datePublished":"2026-10-01T16:51:40+03:00","dateModified":"2026-10-01T16:51:41+03:00"},{"@type":"WebSite","@id":"https:\/\/hermix.com\/fr\/#website","url":"https:\/\/hermix.com\/fr\/","name":"Hermix","description":"Win Public Contracts with the Power of AI","inLanguage":"fr-FR","publisher":{"@id":"https:\/\/hermix.com\/fr\/#organization"}}]},"og:locale":"fr_FR","og:site_name":"Hermix - Win Public Contracts with the Power of AI","og:type":"article","og:title":"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework","og:description":"Nottingham City Council's \u20ac3.54M rail gantry tender covers 9 months, with Network Rail approval required and commissioning targeted for July 2027.","og:url":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/","og:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image.png","og:image:secure_url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image.png","og:image:width":1200,"og:image:height":628,"article:published_time":"2026-10-01T13:51:40+00:00","article:modified_time":"2026-10-01T13:51:41+00:00","article:publisher":"https:\/\/www.facebook.com\/hermixapp","twitter:card":"summary_large_image","twitter:site":"@Hermix_sw","twitter:title":"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework","twitter:description":"Nottingham City Council's \u20ac3.54M rail gantry tender covers 9 months, with Network Rail approval required and commissioning targeted for July 2027.","twitter:creator":"@Hermix_sw","twitter:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/10\/NOTTINGHAM-CITY-COUNCIL-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework_featured-image.png"},"aioseo_meta_data":{"post_id":"11122","title":"#post_title","description":"L&#039;appel d&#039;offres de 3,54 millions d&#039;euros du conseil municipal de Nottingham pour la construction d&#039;un portique ferroviaire couvre une p\u00e9riode de 9 mois, avec l&#039;approbation de Network Rail requise et une mise en service pr\u00e9vue pour juillet 2027.","keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-10-01 13:34:01","updated":"2026-10-01 14:26:51"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/fr\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/fr\/category\/tender-analysis\/\" title=\"Tender Analysis\">Tender Analysis<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tNOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/hermix.com\/fr"},{"label":"Tender Analysis","link":"https:\/\/hermix.com\/fr\/category\/tender-analysis\/"},{"label":"NOTTINGHAM CITY COUNCIL public tender for a rail gantry and high-pressure steam pipework","link":"https:\/\/hermix.com\/fr\/nottingham-city-council-public-tender-for-a-rail-gantry-and-high-pressure-steam-pipework\/"}],"authors":[{"term_id":17,"user_id":3,"is_guest":0,"slug":"andreea-ilie","display_name":"Andreea Ilie","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/cb0674b58c82c13f3140f57ce6b238abab5257f06d482468c588e76c72b29e8c?s=96&d=mm&r=g","author_category":"","first_name":"","last_name":"","user_url":"","job_title":"","description":""}],"_links":{"self":[{"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/posts\/11122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/comments?post=11122"}],"version-history":[{"count":2,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/posts\/11122\/revisions"}],"predecessor-version":[{"id":11125,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/posts\/11122\/revisions\/11125"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/media\/11124"}],"wp:attachment":[{"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/media?parent=11122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/categories?post=11122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/tags?post=11122"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/hermix.com\/fr\/wp-json\/wp\/v2\/ppma_author?post=11122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}