{"id":7738,"date":"2026-06-03T11:30:54","date_gmt":"2026-06-03T09:30:54","guid":{"rendered":"https:\/\/hermix.com\/?p=7738"},"modified":"2026-06-03T11:30:54","modified_gmt":"2026-06-03T09:30:54","slug":"licitacion-publica-de-wind-aan-de-stroom-para-el-suministro-instalacion-y-mantenimiento-de-aerogeneradores-en-la-margen-izquierda-del-rio-escalda-en-el-puerto-de-amberes","status":"publish","type":"post","link":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/","title":{"rendered":"Licitaci\u00f3n p\u00fablica de WIND AAN DE STROOM para el suministro, instalaci\u00f3n y mantenimiento de aerogeneradores en la Margen Izquierda del Escalda en el Puerto de Amberes"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Ver todos los datos de la licitaci\u00f3n: <a href=\"https:\/\/app.hermix.com\/opportunities\/00231679-2026\">https:\/\/app.hermix.com\/opportunities\/00231679-2026<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Un contrato marco de 32,4 millones de euros para la instalaci\u00f3n de hasta cuatro aerogeneradores en la margen izquierda de Amberes ofrece a los proveedores una oportunidad \u00fanica en materia de infraestructura portuaria que combina una larga vida \u00fatil de los activos, una entrega por fases y flexibilidad en la negociaci\u00f3n, al tiempo que mantiene la construcci\u00f3n final supeditada a los resultados medioambientales y a la obtenci\u00f3n de permisos.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">WIND AAN DE STROOM est\u00e1 optando por un proceso de negociaci\u00f3n para establecer un acuerdo marco que abarque el suministro, la instalaci\u00f3n y el mantenimiento de aerogeneradores en la zona portuaria de Amberes. El objetivo declarado es el desarrollo gradual de entre uno y cuatro aerogeneradores en Linkerscheldeoever, si bien el n\u00famero final depender\u00e1 de la evaluaci\u00f3n ambiental en curso y de los permisos correspondientes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esa combinaci\u00f3n es importante. El valor es significativo, la duraci\u00f3n es inusualmente larga (275 meses) y la autoridad ha dividido expl\u00edcitamente el contrato en una parte fija y otra condicional. Para los licitadores, esto indica una contrataci\u00f3n de escala comercial, pero que a\u00fan est\u00e1 condicionada estructuralmente por el riesgo de planificaci\u00f3n y las limitaciones de la naturaleza.<\/p>\n\n\n\n\n\n\n<h2 class=\"wp-block-heading\">Descripci\u00f3n general de la oportunidad<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Autoridad contratante:<\/strong> VIENTO EN EL TROPICO<\/li>\n\n\n\n<li><strong>Tipo de comprador: <\/strong>autoridad regional o local<\/li>\n\n\n\n<li><strong>Actividad principal:<\/strong> Servicios p\u00fablicos generales<\/li>\n\n\n\n<li><strong>N\u00famero de referencia:<\/strong> PPP0B3-19558\/6411\/B11330<\/li>\n\n\n\n<li><strong>ID del documento: <\/strong>00231679-2026 \/ b022e457-07ef-49fa-9893-618c6ce631b0 \/ 01KN8A7E00MBEBYKPJ213Q0G2H<\/li>\n\n\n\n<li><strong>Fuente: <\/strong>BOSA TED<\/li>\n\n\n\n<li><strong>T\u00edtulo de la licitaci\u00f3n: <\/strong>Acuerdo marco para el suministro, instalaci\u00f3n y mantenimiento de aerogeneradores en la margen izquierda del Escalda, en el puerto de Amberes.<\/li>\n\n\n\n<li><strong>Contacto: <\/strong>tanja.vervaet@windaandestroom.be | +32 32052233<\/li>\n\n\n\n<li><strong>URL del comprador:<\/strong> <a href=\"http:\/\/www.portofantwerpbruges.com\/\">http:\/\/www.portofantwerpbruges.com\/<\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Alcance del trabajo: <\/strong>Suministrar equipos y realizar las obras necesarias para sistemas de se\u00f1alizaci\u00f3n luminosa, se\u00f1alizaci\u00f3n retrorreflectante, iluminaci\u00f3n fotovoltaica y armarios de baja tensi\u00f3n para equipos distintos del alumbrado p\u00fablico, vinculados al desarrollo por fases de aerogeneradores en la red portuaria estrat\u00e9gica.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Desarrollo por fases de entre uno y cuatro aerogeneradores en la zona portuaria de Amberes, concretamente en Linkerscheldeoever.<\/li>\n\n\n\n<li>El n\u00famero final de turbinas depende de la evaluaci\u00f3n de impacto ambiental en curso y de los procedimientos de permisos.<\/li>\n\n\n\n<li>El contrato se divide en una parte fija y una parte condicional.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Estructura del lote:<\/strong> Un lote que cubre todo el alcance del marco.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lote 1: suministro, instalaci\u00f3n y mantenimiento de aerogeneradores en el Linkerscheldeoever del Puerto de Amberes. Valor del acuerdo marco compartido: 32.392.496,60 \u20ac.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Lugar de la representaci\u00f3n: <\/strong>Llegada a Amberes, B\u00e9lgica<\/li>\n\n\n\n<li><strong>Valor total estimado<\/strong>: \u20ac32,392,496.60<\/li>\n\n\n\n<li><strong>Tipo de contrato:<\/strong> Suministros<\/li>\n\n\n\n<li><strong>Duraci\u00f3n del contrato: <\/strong>275 meses<\/li>\n\n\n\n<li><strong>Tipo de procedimiento:<\/strong> Negociado con publicaci\u00f3n previa de una convocatoria a concurso \/ competitivo con negociaci\u00f3n<\/li>\n\n\n\n<li><strong>Criterios de premiaci\u00f3n:<\/strong> Costo, calidad<\/li>\n\n\n\n<li><strong>Fecha de publicaci\u00f3n: <\/strong>3 de abril de 2026<\/li>\n\n\n\n<li><strong>Fecha l\u00edmite de presentaci\u00f3n:<\/strong> 13 de mayo de 2026<\/li>\n\n\n\n<li><strong>Fecha de apertura de la licitaci\u00f3n: <\/strong>No se especifica<\/li>\n\n\n\n<li><strong>Requisitos de idioma: <\/strong>flamenco<\/li>\n\n\n\n<li><strong>Financiaci\u00f3n de la UE:<\/strong> No<\/li>\n\n\n\n<li><strong>Garant\u00edas financieras: <\/strong>Garant\u00eda equivalente a 5% del importe estimado del contrato, excluido el IVA, redondeado a la decena superior m\u00e1s cercana.<\/li>\n\n\n\n<li><strong>Portal de env\u00edo:<\/strong> <a href=\"https:\/\/www.publicprocurement.be\">https:\/\/www.publicprocurement.be<\/a><\/li>\n\n\n\n<li><strong>Avisos relacionados: <\/strong>Se ha registrado un aviso de contrato relacionado, con fecha del 3 de abril de 2026. No se ha registrado ning\u00fan aviso previo. No se muestra ning\u00fan historial de adjudicaci\u00f3n ni renovaci\u00f3n de contratos en el contexto visible de Hermix.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>\u00bfListo para calificar licitaciones como esta m\u00e1s r\u00e1pido? Crea tu cuenta gratuita de Hermix en <a href=\"https:\/\/hermix.com\/es\/registrarse\/\">https:\/\/hermix.com\/sign-up\/<\/a> y acceder a an\u00e1lisis de licitaciones impulsados por IA, inteligencia competitiva y monitoreo automatizado en todo el mercado europeo de contrataci\u00f3n p\u00fablica de 2 billones de euros.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Contexto de autoridad y contrataci\u00f3n p\u00fablica<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El comprador figura como una autoridad regional o local, cuya actividad principal son los servicios p\u00fablicos generales. M\u00e1s all\u00e1 de eso, el anuncio se mantiene conciso y pr\u00e1ctico. No incluye una descripci\u00f3n institucional amplia, por lo que la contrataci\u00f3n debe interpretarse a trav\u00e9s de su alcance: un contrato marco a largo plazo para aerogeneradores en un entorno portuario de importancia estrat\u00e9gica, con una secuencia de entrega vinculada a restricciones urban\u00edsticas y ecol\u00f3gicas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El contexto de Hermix que se muestra en la fuente es escaso para este comprador. No se observan licitaciones abiertas similares, renovaciones, adjudicaciones de contratos similares ni avisos previos en el perfil del comprador. Esta ausencia resulta \u00fatil en s\u00ed misma, ya que significa que los licitadores no pueden basarse en un historial visible de ciclos de licitaci\u00f3n repetidos ni en patrones de adjudicaci\u00f3n anteriores en esta vista resumida. La interpretaci\u00f3n m\u00e1s acertada es que esta oportunidad debe evaluarse principalmente en funci\u00f3n de los requisitos del proyecto, los umbrales financieros y la idoneidad de la ejecuci\u00f3n, en lugar del comportamiento hist\u00f3rico del comprador.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Licitaciones abiertas similares: 0, valor \u20ac0<\/li>\n\n\n\n<li>Todas las licitaciones abiertas: 0, valor \u20ac0<\/li>\n\n\n\n<li>Renovaciones similares: 0, valor \u20ac0<\/li>\n\n\n\n<li>Todas las renovaciones: 0, valor \u20ac0<\/li>\n\n\n\n<li>Adjudicaciones de contratos similares: 0, valor \u20ac0<\/li>\n\n\n\n<li>Todos los contratos adjudicados: 0, valor \u20ac0<\/li>\n\n\n\n<li>Otros compradores con proyectos similares: 260, valor 186 millones de euros.<\/li>\n\n\n\n<li>Avisos previos similares: 0, valor \u20ac0<\/li>\n\n\n\n<li>Todos los avisos previos: 0, valor \u20ac0<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La secci\u00f3n de avisos relacionados muestra el aviso de contrato en s\u00ed y nada m\u00e1s. No hay ning\u00fan aviso de informaci\u00f3n previa en el registro visible, ni aviso de adjudicaci\u00f3n independiente ni historial de renovaci\u00f3n que consultar. Desde la perspectiva del licitador, esto reduce la cantidad de informaci\u00f3n hist\u00f3rica p\u00fablica disponible antes de consultar los documentos de la licitaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Panorama competitivo<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">En el registro de origen de esta oportunidad, no se muestra ninguna tabla con los ganadores de contratos similares. Esto significa que, en la vista actual de Hermix, no hay una lista clasificada de contratistas, ni valores contractuales, ni recuentos, ni un desglose por pa\u00edses de los ganadores anteriores para comparar directamente con este comprador.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando no se dispone de esa tabla, el an\u00e1lisis competitivo debe ampliarse. El \u00fanico punto de referencia de mercado visible es la presencia de otros 260 compradores con proyectos similares por un valor de 186 millones de euros. Esto indica que existe un mercado potencial m\u00e1s amplio para proyectos relacionados con aerogeneradores o infraestructuras energ\u00e9ticas similares, pero no identifica a los contratistas principales para esta autoridad espec\u00edfica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En la pr\u00e1ctica, esto crea un panorama m\u00e1s claro para la calificaci\u00f3n. Los proveedores no tienen un competidor establecido claramente definido con el que compararse en este resumen. En cambio, es probable que la competencia se centre en la credibilidad t\u00e9cnica, la estructura comercial, la capacidad de gestionar el despliegue por fases y la confianza en torno a las partes fijas y condicionales del contrato.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Se\u00f1ales comerciales y procesales<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Varias caracter\u00edsticas comerciales destacan de inmediato. En primer lugar, el contrato utiliza un procedimiento negociado con publicaci\u00f3n previa. Esto difiere de una adjudicaci\u00f3n abierta directa, realizada \u00fanicamente por escrito. Esto significa que los proveedores pueden esperar una din\u00e1mica de selecci\u00f3n m\u00e1s activa, donde la autoridad puede configurar el entorno competitivo mediante el di\u00e1logo y la negociaci\u00f3n, en lugar de basarse \u00fanicamente en una \u00fanica comparaci\u00f3n sellada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En segundo lugar, el proceso de adquisici\u00f3n es prolongado. Una duraci\u00f3n de 275 meses indica una relaci\u00f3n de inversi\u00f3n a largo plazo, en lugar de un paquete de construcci\u00f3n de corta duraci\u00f3n. Esto es relevante para la fijaci\u00f3n de precios, las previsiones de mantenimiento, la planificaci\u00f3n del ciclo de vida y la asignaci\u00f3n de riesgos. Los licitadores deben considerar m\u00e1s all\u00e1 de la entrega e instalaci\u00f3n de la turbina y presupuestar teniendo en cuenta un horizonte operativo prolongado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En tercer lugar, la breve descripci\u00f3n explicita la l\u00f3gica por fases. El comprador desea avanzar con entre una y cuatro turbinas, pero el n\u00famero final a\u00fan depende de la evaluaci\u00f3n ambiental y los permisos. Esto no es un detalle secundario, sino una de las condiciones comerciales fundamentales de la oportunidad. Los proveedores deben considerar la flexibilidad de volumen, la secuencia y la movilizaci\u00f3n condicional como aspectos clave de la licitaci\u00f3n, no como notas al margen.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El marco tambi\u00e9n se divide en una parte fija y otra condicional. Si bien el aviso no especifica los valores de estos componentes, la estructura es importante. Implica un compromiso inicial m\u00e1s una ruta de extensi\u00f3n que depende de c\u00f3mo evolucionen la planificaci\u00f3n y las restricciones relacionadas con la naturaleza. Para los licitadores, esto afecta la programaci\u00f3n de la producci\u00f3n, la subcontrataci\u00f3n, la planificaci\u00f3n del sitio y, posiblemente, c\u00f3mo se distribuye el margen en el modelo comercial.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El idioma es otro obst\u00e1culo. Las ofertas deben presentarse en flamenco. Esto reduce el n\u00famero de opciones viables a proveedores que puedan gestionar no solo la entrega t\u00e9cnica en B\u00e9lgica, sino tambi\u00e9n la redacci\u00f3n de la licitaci\u00f3n, la negociaci\u00f3n y la ejecuci\u00f3n del contrato en el idioma requerido.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La garant\u00eda financiera es s\u00f3lida. El aviso exige una fianza equivalente a 51 TP3T del valor estimado del contrato, sin IVA, redondeado a la decena superior m\u00e1s cercana. Este requisito de seguridad para los proveedores es importante y debe verificarse con antelaci\u00f3n en funci\u00f3n de la capacidad de tesorer\u00eda y las condiciones bancarias.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El plazo de presentaci\u00f3n de ofertas va del 3 de abril de 2026 al 13 de mayo de 2026, lo que otorga a los licitadores 40 d\u00edas naturales. Si bien es un plazo viable, no resulta generoso para una licitaci\u00f3n de infraestructura energ\u00e9tica negociada, dada la complejidad ambiental y de fases. Los proveedores deber\u00e1n agilizar los tr\u00e1mites legales, t\u00e9cnicos y financieros.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Contexto estrat\u00e9gico e interpretaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Esta licitaci\u00f3n se sit\u00faa en un punto intermedio interesante. Por un lado, se trata de una oportunidad de infraestructura claramente definida, con un valor publicado, un \u00fanico lote y una ubicaci\u00f3n geogr\u00e1fica identificable. Por otro lado, la construcci\u00f3n real sigue siendo parcialmente flexible, ya que el n\u00famero final de turbinas depende de los resultados ambientales y de los permisos. Esto hace que el proyecto se asemeje menos a una simple venta de equipos y m\u00e1s a un programa de infraestructura estructurado con opciones por etapas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La larga duraci\u00f3n refuerza esta interpretaci\u00f3n. Un plazo de 275 meses sugiere que la autoridad busca una relaci\u00f3n a largo plazo, m\u00e1s all\u00e1 de un paquete de construcci\u00f3n a corto plazo. Los proveedores que solo priorizan el costo inicial de entrega podr\u00edan tener dificultades si no demuestran una l\u00f3gica de mantenimiento a largo plazo cre\u00edble y una s\u00f3lida capacidad operativa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La ausencia de premios y renovaciones hist\u00f3ricas visibles en el perfil del comprador implica que existe un menor reconocimiento p\u00fablico de patrones que en categor\u00edas de recompra m\u00e1s consolidadas. Esto puede dificultar la calificaci\u00f3n, pero tambi\u00e9n reduce el atractivo de una narrativa visible del proveedor establecido. En efecto, los documentos importan m\u00e1s que el historial, ya que este \u00faltimo es pr\u00e1cticamente inexistente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La combinaci\u00f3n de un procedimiento negociado, una estructura fija m\u00e1s condicional y una dependencia expl\u00edcita de permisos sugiere que el comprador desea tener margen para influir en el resultado comercial final, en lugar de fijar todas las variables en la fase de notificaci\u00f3n. Los proveedores deben interpretar esto como una instrucci\u00f3n para presentar flexibilidad de forma controlada: robustez cuando el alcance fijo es claro y adaptabilidad cuando el alcance condicional puede ampliarse o reducirse.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Los usuarios de Hermix que analicen esta licitaci\u00f3n pueden acceder a esta informaci\u00f3n competitiva al instante, incluyendo perfiles detallados de los contratistas, patrones de gasto de la autoridad y todo el proceso de renovaci\u00f3n, en cuesti\u00f3n de minutos en lugar de horas.<\/p>\n\n\n\n\n\n\n<h2 class=\"wp-block-heading\">Consejos pr\u00e1cticos para los licitadores<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">\u00bfA qui\u00e9n le conviene esta licitaci\u00f3n?<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Proveedores con capacidad de entrega e instalaci\u00f3n de aerogeneradores en B\u00e9lgica, especialmente aquellos que puedan operar en un entorno portuario o de transporte estrat\u00e9gico.<\/li>\n\n\n\n<li>Se buscan licitadores que puedan respaldar tanto la entrega de capital como el mantenimiento a largo plazo durante un per\u00edodo de 275 meses.<\/li>\n\n\n\n<li>Equipos con la capacidad jur\u00eddica y comercial para gestionar una contrataci\u00f3n p\u00fablica negociada en flamenco.<\/li>\n\n\n\n<li>Los proveedores se sienten c\u00f3modos con un despliegue por fases en el que el volumen final puede oscilar entre una y cuatro turbinas y parte del alcance est\u00e1 sujeto a condiciones.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Puntos cr\u00edticos a tener en cuenta<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Considere los 32.392.496,60 \u20ac como el total del marco compartido. Hay un solo lote y el valor publicado del lote coincide con el total estimado indicado.<\/li>\n\n\n\n<li>Prevea una fianza de cumplimiento 5% sobre el importe estimado sin IVA, redondeado a la decena superior m\u00e1s cercana.<\/li>\n\n\n\n<li>No subestime las limitaciones de planificaci\u00f3n y de la naturaleza. El n\u00famero final de turbinas depende de la evaluaci\u00f3n ambiental en curso y de los procedimientos de obtenci\u00f3n de permisos.<\/li>\n\n\n\n<li>Elabore un modelo de licitaci\u00f3n que separe claramente la parte fija de la parte condicional de la asignaci\u00f3n, aunque el aviso no les asigne valores separados.<\/li>\n\n\n\n<li>Tenga en cuenta la capacidad ling\u00fc\u00edstica desde el principio. La oferta est\u00e1 redactada en flamenco, lo que tiene implicaciones pr\u00e1cticas para su redacci\u00f3n, negociaci\u00f3n y ejecuci\u00f3n.<\/li>\n\n\n\n<li>Trabaje dentro del plazo de presentaci\u00f3n de 40 d\u00edas y no d\u00e9 por sentado que habr\u00e1 una pr\u00f3rroga posterior. El aviso no indica una fecha de apertura de la licitaci\u00f3n posterior a la fecha l\u00edmite de presentaci\u00f3n.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">P\u00e1rrafo final<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Esta es una oportunidad destacada, ya que combina un marco de valor significativo con un horizonte de entrega amplio y una estructura de proyecto condicionada por permisos y factores ambientales, en lugar de un n\u00famero fijo de obras. Para los licitadores, esto hace que la cualificaci\u00f3n rigurosa sea esencial: las propuestas m\u00e1s s\u00f3lidas ser\u00e1n aquellas que puedan ofrecer precios y certeza cuando el alcance del proyecto sea firme, manteniendo al mismo tiempo su credibilidad comercial cuando el alcance a\u00fan est\u00e9 sujeto a condiciones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Crea tu cuenta gratuita hoy mismo <a href=\"https:\/\/hermix.com\/es\/registrarse\/\">https:\/\/hermix.com\/sign-up\/<\/a> y ganar m\u00e1s contratos p\u00fablicos con el enfoque basado en datos que ayuda a las empresas a tener \u00e9xito constante en las ventas B2G en toda Europa.<\/p>\n\n\n<figure class=\"wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1200\" height=\"628\" src=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Licitaci\u00f3n p\u00fablica de WIND AAN DE STROOM para el suministro, instalaci\u00f3n y mantenimiento de aerogeneradores en la Margen Izquierda del Escalda en el Puerto de Amberes\" style=\"object-fit:cover;\" srcset=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png 1200w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image-300x157.png 300w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image-1024x536.png 1024w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image-768x402.png 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp&#8217;s Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":7883,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","inline_featured_image":false,"page_builder":"","footnotes":"","_ppma_block_editor_authors":""},"categories":[35],"tags":[],"ppma_author":[17],"class_list":["post-7738","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tender-analysis"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp&#039;s Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Andreea Ilie\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"es_ES\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Hermix - Win Public Contracts with the Power of AI\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix\" \/>\n\t\t<meta property=\"og:description\" content=\"View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp&#039;s Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-06-03T09:30:54+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-06-03T09:30:54+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/hermixapp\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:title\" content=\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix\" \/>\n\t\t<meta name=\"twitter:description\" content=\"View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp&#039;s Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#blogposting\",\"name\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix\",\"headline\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp\",\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/author\\\/andreea-ilie\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png\",\"width\":1200,\"height\":628,\"caption\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp\"},\"datePublished\":\"2026-06-03T11:30:54+03:00\",\"dateModified\":\"2026-06-03T11:30:54+03:00\",\"inLanguage\":\"es-ES\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#webpage\"},\"articleSection\":\"Tender Analysis, Andreea Ilie\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hermix.com\\\/es\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/category\\\/tender-analysis\\\/#listItem\",\"position\":2,\"name\":\"Tender Analysis\",\"item\":\"https:\\\/\\\/hermix.com\\\/es\\\/category\\\/tender-analysis\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#listItem\",\"name\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#listItem\",\"position\":3,\"name\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/#organization\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"url\":\"https:\\\/\\\/hermix.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.hermix.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hermix_logo.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/hermixapp\",\"https:\\\/\\\/twitter.com\\\/Hermix_sw\",\"https:\\\/\\\/www.instagram.com\\\/hermix_sw\\\/\",\"https:\\\/\\\/be.linkedin.com\\\/company\\\/hermix\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/author\\\/andreea-ilie\\\/#author\",\"url\":\"https:\\\/\\\/hermix.com\\\/es\\\/author\\\/andreea-ilie\\\/\",\"name\":\"Andreea Ilie\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#webpage\",\"url\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/\",\"name\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix\",\"description\":\"View full tender data: https:\\\/\\\/app.hermix.com\\\/opportunities\\\/00231679-2026 A \\u20ac32.4 million framework for up to four wind turbines on Antwerp's Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated\",\"inLanguage\":\"es-ES\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/author\\\/andreea-ilie\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/author\\\/andreea-ilie\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#mainImage\",\"width\":1200,\"height\":628,\"caption\":\"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\\\/#mainImage\"},\"datePublished\":\"2026-06-03T11:30:54+03:00\",\"dateModified\":\"2026-06-03T11:30:54+03:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/hermix.com\\\/es\\\/\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"inLanguage\":\"es-ES\",\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Licitaci\u00f3n p\u00fablica de WIND AAN DE STROOM para el suministro, instalaci\u00f3n y mantenimiento de aerogeneradores en la margen izquierda del Escalda, en el puerto de Amberes - Hermix.","description":"Ver datos completos de la licitaci\u00f3n: https:\/\/app.hermix.com\/opportunities\/00231679-2026 Un marco de 32,4 millones de euros para hasta cuatro aerogeneradores en la margen izquierda de Amberes ofrece a los proveedores una rara oportunidad de infraestructura portuaria que combina una larga vida \u00fatil del activo, entrega por fases y flexibilidad de negociaci\u00f3n, al tiempo que mantiene la construcci\u00f3n final vinculada a los resultados ambientales y de permisos. WIND AAN DE STROOM est\u00e1 tomando una decisi\u00f3n negociada","canonical_url":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#blogposting","name":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix","headline":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp","author":{"@id":"https:\/\/hermix.com\/es\/author\/andreea-ilie\/#author"},"publisher":{"@id":"https:\/\/hermix.com\/es\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png","width":1200,"height":628,"caption":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp"},"datePublished":"2026-06-03T11:30:54+03:00","dateModified":"2026-06-03T11:30:54+03:00","inLanguage":"es-ES","mainEntityOfPage":{"@id":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#webpage"},"isPartOf":{"@id":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#webpage"},"articleSection":"Tender Analysis, Andreea Ilie"},{"@type":"BreadcrumbList","@id":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/hermix.com\/es#listItem","position":1,"name":"Home","item":"https:\/\/hermix.com\/es","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/es\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/es\/category\/tender-analysis\/#listItem","position":2,"name":"Tender Analysis","item":"https:\/\/hermix.com\/es\/category\/tender-analysis\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#listItem","name":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp"},"previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/es#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#listItem","position":3,"name":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp","previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/es\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}}]},{"@type":"Organization","@id":"https:\/\/hermix.com\/es\/#organization","name":"Hermix","description":"Win Public Contracts with the Power of AI","url":"https:\/\/hermix.com\/es\/","logo":{"@type":"ImageObject","url":"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png","@id":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#organizationLogo"},"image":{"@id":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/hermixapp","https:\/\/twitter.com\/Hermix_sw","https:\/\/www.instagram.com\/hermix_sw\/","https:\/\/be.linkedin.com\/company\/hermix"]},{"@type":"Person","@id":"https:\/\/hermix.com\/es\/author\/andreea-ilie\/#author","url":"https:\/\/hermix.com\/es\/author\/andreea-ilie\/","name":"Andreea Ilie"},{"@type":"WebPage","@id":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#webpage","url":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/","name":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix","description":"View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp's Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated","inLanguage":"es-ES","isPartOf":{"@id":"https:\/\/hermix.com\/es\/#website"},"breadcrumb":{"@id":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#breadcrumblist"},"author":{"@id":"https:\/\/hermix.com\/es\/author\/andreea-ilie\/#author"},"creator":{"@id":"https:\/\/hermix.com\/es\/author\/andreea-ilie\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png","@id":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#mainImage","width":1200,"height":628,"caption":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp"},"primaryImageOfPage":{"@id":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/#mainImage"},"datePublished":"2026-06-03T11:30:54+03:00","dateModified":"2026-06-03T11:30:54+03:00"},{"@type":"WebSite","@id":"https:\/\/hermix.com\/es\/#website","url":"https:\/\/hermix.com\/es\/","name":"Hermix","description":"Win Public Contracts with the Power of AI","inLanguage":"es-ES","publisher":{"@id":"https:\/\/hermix.com\/es\/#organization"}}]},"og:locale":"es_ES","og:site_name":"Hermix - Win Public Contracts with the Power of AI","og:type":"article","og:title":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix","og:description":"View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp's Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated","og:url":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/","og:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png","og:image:secure_url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png","og:image:width":1200,"og:image:height":628,"article:published_time":"2026-06-03T09:30:54+00:00","article:modified_time":"2026-06-03T09:30:54+00:00","article:publisher":"https:\/\/www.facebook.com\/hermixapp","twitter:card":"summary_large_image","twitter:site":"@Hermix_sw","twitter:title":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp - Hermix","twitter:description":"View full tender data: https:\/\/app.hermix.com\/opportunities\/00231679-2026 A \u20ac32.4 million framework for up to four wind turbines on Antwerp's Left Bank gives suppliers a rare port infrastructure opportunity that combines long asset life, phased delivery and negotiation flexibility, while keeping the final buildout tied to environmental and permitting outcomes. WIND AAN DE STROOM is taking a negotiated","twitter:creator":"@Hermix_sw","twitter:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/06\/WIND-AAN-DE-STROOM-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-Left-Bank-of-the-Scheldt-in-the-Port-of-Antwerp-featured_image.png"},"aioseo_meta_data":{"post_id":"7738","title":null,"description":null,"keywords":null,"keyphrases":{"focus":[],"additional":[]},"focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-08-13 01:26:49","updated":"2026-08-20 11:56:21"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/es\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/es\/category\/tender-analysis\/\" title=\"Tender Analysis\">Tender Analysis<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tWIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/hermix.com\/es"},{"label":"Tender Analysis","link":"https:\/\/hermix.com\/es\/category\/tender-analysis\/"},{"label":"WIND AAN DE STROOM public tender for wind turbine supply, installation and maintenance on the Left Bank of the Scheldt in the Port of Antwerp","link":"https:\/\/hermix.com\/es\/wind-aan-de-stroom-public-tender-for-wind-turbine-supply-installation-and-maintenance-on-the-left-bank-of-the-scheldt-in-the-port-of-antwerp\/"}],"authors":[{"term_id":17,"user_id":3,"is_guest":0,"slug":"andreea-ilie","display_name":"Andreea Ilie","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/cb0674b58c82c13f3140f57ce6b238abab5257f06d482468c588e76c72b29e8c?s=96&d=mm&r=g","author_category":"","first_name":"","last_name":"","user_url":"","job_title":"","description":""}],"_links":{"self":[{"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/posts\/7738","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/comments?post=7738"}],"version-history":[{"count":0,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/posts\/7738\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/media\/7883"}],"wp:attachment":[{"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/media?parent=7738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/categories?post=7738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/tags?post=7738"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/ppma_author?post=7738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}