{"id":7561,"date":"2026-03-12T12:33:16","date_gmt":"2026-03-12T11:33:16","guid":{"rendered":"https:\/\/hermix.com\/?p=7561"},"modified":"2026-03-12T12:33:16","modified_gmt":"2026-03-12T11:33:16","slug":"aeroports-de-paris-lanza-un-marco-de-suministro-de-materiales-electricos-de-ocho-anos-por-valor-de-30-millones-de-euros","status":"publish","type":"post","link":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/","title":{"rendered":"A\u00e9roports de Paris lanza un acuerdo marco de suministro de materiales el\u00e9ctricos por valor de 30 millones de euros a ocho a\u00f1os."},"content":{"rendered":"<p class=\"wp-block-paragraph\"><em>Un acuerdo marco de gran envergadura, con una duraci\u00f3n de 96 meses, para estandarizar la infraestructura el\u00e9ctrica en los aeropuertos de Par\u00eds, tras una reevaluaci\u00f3n estrat\u00e9gica de las necesidades operativas.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Crea una cuenta gratuita y consulta aqu\u00ed todos los detalles de la licitaci\u00f3n p\u00fablica: <a href=\"https:\/\/app.hermix.com\/opportunities\/00110820-2026\">https:\/\/app.hermix.com\/opportunities\/00110820-2026<\/a><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A\u00e9roports de Paris (ADP) ha lanzado oficialmente una importante licitaci\u00f3n para el suministro de equipos el\u00e9ctricos en todas sus instalaciones, valorada en aproximadamente 30.000.000 \u20ac. Esta licitaci\u00f3n representa una inversi\u00f3n crucial en infraestructura para el operador, ya que garantiza la modernizaci\u00f3n y el mantenimiento continuos de los sistemas el\u00e9ctricos en una de las redes aeroportuarias m\u00e1s transitadas de Europa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lo que hace que esta oportunidad sea particularmente destacable, m\u00e1s all\u00e1 de su gran atractivo, es su contexto. Esta licitaci\u00f3n surge tras la cancelaci\u00f3n de una consulta prevista para marzo de 2025, lo que indica una revisi\u00f3n deliberada de los requisitos operativos de ADP. Con una duraci\u00f3n contractual de ocho a\u00f1os (96 meses), este acuerdo marco ofrece una oportunidad \u00fanica para que los proveedores establezcan una colaboraci\u00f3n de diez a\u00f1os con un importante centro de transporte franc\u00e9s. Sin embargo, dado que el plazo de presentaci\u00f3n de ofertas finaliza a principios de marzo de 2026, los licitadores interesados deben actuar con rapidez.<\/p>\n\n\n\n\n\n\n<h2 class=\"wp-block-heading\">RESUMEN DE LA OPORTUNIDAD<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Esta secci\u00f3n describe los datos f\u00e1cticos fundamentales relativos a la licitaci\u00f3n. Todas las cifras se derivan estrictamente del anuncio oficial del contrato (Referencia 00110820-2026).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Autoridad contratante: <\/strong>Aeropuertos de Par\u00eds (ADP)<br><strong>N\u00famero de referencia:<\/strong> 00110820-2026 (Referencia interna: SPA023036)<br><strong>T\u00edtulo de la licitaci\u00f3n:<\/strong> Fourniture de mat\u00e9riels \u00e9lectriques sur tous les sites d&#039;A\u00e9roports de Paris (Suministro de equipos el\u00e9ctricos para todos los sitios de A\u00e9roports de Paris)<br><strong>Alcance del trabajo:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Suministro de materiales y accesorios el\u00e9ctricos.<\/li>\n\n\n\n<li>Ejecuci\u00f3n de suministros en el marco de un acuerdo marco (Acuerdo-cuadro).<\/li>\n\n\n\n<li>Acuerdo multiatributo (m\u00e1ximo dos titulares).<\/li>\n\n\n\n<li>Cumplimiento de pedidos de compra basados en cl\u00e1usulas t\u00e9cnicas (CCTP).<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Estructura del lote:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lote 1: Muebles de material el\u00e9ctrico en todos los sitios de los aeropuertos de Par\u00eds.<\/li>\n\n\n\n<li>Valor del lote: 30.000.000,00 \u20ac.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Lugar de la representaci\u00f3n:<\/strong> Francia (espec\u00edficamente Val-de-Marne y Seine-Saint-Denis).<br><strong>Valor total estimado:<\/strong> 30.000.000,00 \u20ac sin IVA.<br><strong>Duraci\u00f3n del contrato: <\/strong>96 meses.<br><strong>Tipo de procedimiento: <\/strong>Negociado con publicaci\u00f3n previa de una convocatoria a concurso \/ Competitivo con negociaci\u00f3n.<br><strong>Criterios de adjudicaci\u00f3n:<\/strong> No se especifica en el resumen informativo (\u201cDesconocido\u201d).<br><strong>Fechas clave:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fecha de publicaci\u00f3n: 17\/02\/2026<\/li>\n\n\n\n<li>Fecha l\u00edmite: 03\/03\/2026<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Requisitos de idioma: <\/strong>Franc\u00e9s.<br><strong>Financiaci\u00f3n de la UE:<\/strong> No.<br><strong>Datos de contacto:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Punto de contacto: DHATI<\/li>\n\n\n\n<li>Correo electr\u00f3nico: dhati@adp.fr<\/li>\n\n\n\n<li>Tel\u00e9fono: +33 0174221567<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Portal de env\u00edo \/ URL<\/strong>:<a href=\" https:\/\/fournisseurs.aeroportsdeparis.fr\/\"> https:\/\/fournisseurs.aeroportsdeparis.fr\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00bfListo para calificar licitaciones como esta m\u00e1s r\u00e1pido? Crea tu cuenta gratuita de Hermix en <a href=\"https:\/\/hermix.com\/es\/registrarse\/\">https:\/\/hermix.com\/sign-up\/<\/a> y acceder a an\u00e1lisis de licitaciones impulsados por IA, inteligencia competitiva y monitoreo automatizado en todo el mercado europeo de contrataci\u00f3n p\u00fablica de 2 billones de euros.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">AUTORIDAD E HISTORIA<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A\u00e9roports de Paris (ADP) es la entidad central que gestiona los principales aeropuertos que dan servicio a Par\u00eds, incluidos Charles de Gaulle, Orly y Le Bourget. Como entidad contratante, ADP opera en el sector de \u201cActividades relacionadas con los aeropuertos\u201d, gestionando una enorme cartera de infraestructuras que requieren apoyo log\u00edstico y t\u00e9cnico constante.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Los datos proporcionados en el pliego de condiciones ponen de manifiesto que ADP es un comprador de gran volumen con una presencia significativa en el panorama de la contrataci\u00f3n p\u00fablica europea.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Licitaciones abiertas totales: Actualmente, ADP tiene 8 licitaciones abiertas con un valor combinado de aproximadamente 243 millones de euros.<\/li>\n\n\n\n<li>Previsi\u00f3n de renovaciones: La autoridad cuenta con una importante cartera de 301 renovaciones valoradas en 8.400 millones de euros, lo que indica un flujo constante de oportunidades futuras.<\/li>\n\n\n\n<li>Renovaciones similares: concretamente dentro del \u00e1mbito de esta licitaci\u00f3n, existen 14 renovaciones valoradas en 173 millones de euros.<\/li>\n\n\n\n<li>Adjudicaciones de contratos: Los datos indican 50 adjudicaciones de contratos distintas con un valor total de 266 millones de euros.<\/li>\n\n\n\n<li>Adjudicaciones de contratos similares: El sistema detecta 360 adjudicaciones de contratos similares, lo que sugiere que el suministro y mantenimiento el\u00e9ctrico es una categor\u00eda de adquisici\u00f3n recurrente y de alta frecuencia para este comprador.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Este perfil de actividad describe una organizaci\u00f3n que depende en gran medida de contratos externos estructurados y a largo plazo para mantener sus operaciones. El elevado volumen de renovaciones (8.400 millones de euros) sugiere que, una vez que un proveedor se integra en el ecosistema de ADP, el potencial de ingresos recurrentes y extensiones de contrato es excepcionalmente alto. La licitaci\u00f3n actual, con una duraci\u00f3n de 96 meses, encaja perfectamente en este patr\u00f3n de retenci\u00f3n de proveedores a largo plazo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">PANORAMA COMPETITIVO<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Para cualquier posible licitador, es fundamental comprender qui\u00e9nes son los principales adjudicatarios de contratos con ADP. Los datos de &quot;Ganadores de contratos similares&quot; ofrecen una visi\u00f3n general del panorama actual de proveedores de suministros el\u00e9ctricos e iluminaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Principales contratistas: Los datos disponibles destacan a un contratista espec\u00edfico relevante para este \u00e1mbito:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ILUMINACI\u00d3N FONROCHE\n<ul class=\"wp-block-list\">\n<li>N\u00famero de contratos: 1<\/li>\n\n\n\n<li>Pa\u00eds: Francia<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Si bien el conjunto de datos identifica espec\u00edficamente a Fonroche Lighting como ganador de un contrato similar, el contexto m\u00e1s amplio de &quot;Otros compradores con proyectos similares&quot; revela una profundidad de mercado de 681 entidades con un valor de proyecto de 1.000 millones de euros. Esto sugiere que, aunque ADP cuenta con proveedores establecidos, el mercado de suministros el\u00e9ctricos para aeropuertos es vasto y competitivo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Patrones clave:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Dominio franc\u00e9s: <\/strong>Los datos del pa\u00eds del contratista indican expl\u00edcitamente que Francia es el pa\u00eds de origen del ganador identificado. Dado el estricto requisito de idioma franc\u00e9s para las ofertas en esta licitaci\u00f3n, es muy probable que las empresas nacionales o las internacionales con s\u00f3lidas filiales locales en Francia dominen el proceso de licitaci\u00f3n.<\/li>\n\n\n\n<li><strong>Especializaci\u00f3n: <\/strong>La presencia de un contratista especializado en iluminaci\u00f3n (Fonroche) sugiere que ADP podr\u00eda segmentar sus necesidades el\u00e9ctricas. Sin embargo, la licitaci\u00f3n actual abarca &quot;Materiales el\u00e9ctricos&quot; de forma amplia (CPV 31681410), lo que implica la necesidad de un distribuidor generalista o un consorcio capaz de cubrir una amplia gama de referencias de productos el\u00e9ctricos, no solo de iluminaci\u00f3n.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">SE\u00d1ALES COMERCIALES Y DE PROCEDIMIENTO<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Esta licitaci\u00f3n no es un procedimiento abierto est\u00e1ndar. Varios indicadores clave en la documentaci\u00f3n definen c\u00f3mo se desarrollar\u00e1 esta contrataci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El procedimiento de \u201cnegociaci\u00f3n\u201d se describe como \u201cnegociado con publicaci\u00f3n previa de una convocatoria a concurso\u201d. Esto representa un cambio significativo con respecto a las licitaciones p\u00fablicas est\u00e1ndar. Implica que ADP tiene la intenci\u00f3n de preseleccionar a los candidatos calificados y luego entablar un di\u00e1logo para perfeccionar los aspectos t\u00e9cnicos o financieros de las ofertas. Para los licitadores, esto significa que la presentaci\u00f3n inicial es solo el primer paso; la capacidad de negociar las especificaciones t\u00e9cnicas y las estructuras de precios despu\u00e9s de la presentaci\u00f3n ser\u00e1 crucial para ganar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El relato de la nueva licitaci\u00f3n La \u201cDescripci\u00f3n breve\u201d indica expl\u00edcitamente que se trata de un relanzamiento. Una consulta anterior (Referencia JOUE 191318-2025, publicada el 25\/03\/2025) fue declarada \u201csin \u00e9xito\/cancelada\u201d tras una \u201cmodificaci\u00f3n de la necesidad operativa\u201d de A\u00e9roports de Paris.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Valor anterior: 35.000.000,00 \u20ac<\/li>\n\n\n\n<li>Valor actual: 30.000.000,00 \u20ac<\/li>\n\n\n\n<li>Implicaci\u00f3n: ADP ha revisado a la baja sus requisitos en 5 millones de euros. Los licitadores que participaron en la ronda de 2025 deben analizar detenidamente las nuevas CCTP (cl\u00e1usulas t\u00e9cnicas) para comprender con exactitud qu\u00e9 se ha recortado o modificado en el alcance.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Estructura del Acuerdo Marco El contrato es un \u201cacuerdo marco\u201d con \u00f3rdenes de compra. Es multiatributo, lo que significa que ADP seleccionar\u00e1 un m\u00e1ximo de dos titulares.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Se\u00f1al estrat\u00e9gica: ADP no quiere depender de un solo proveedor durante 8 a\u00f1os. Est\u00e1n creando redundancia. Ser el segundo clasificado es casi tan valioso como ser el primero, ya que garantiza el acceso al marco contractual durante casi una d\u00e9cada.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Presi\u00f3n de tiempo extrema<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Publicaci\u00f3n: 17 de febrero de 2026.<\/li>\n\n\n\n<li>Fecha l\u00edmite: 3 de marzo de 2026.<\/li>\n\n\n\n<li>Intervalo: Solo 14 d\u00edas.<\/li>\n\n\n\n<li>Implicaci\u00f3n: Este es un plazo excepcionalmente corto para un contrato de 30 millones de euros, especialmente uno que implica negociaci\u00f3n. Esto sugiere firmemente que ADP cuenta con un conjunto de requisitos bien definidos y, posiblemente, con una lista de proveedores preseleccionados que esperan que presenten sus ofertas. Los nuevos participantes deben actuar con suma rapidez para preparar un expediente que cumpla con los requisitos.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">PERSPECTIVA NARRATIVA \/ INTERPRETACI\u00d3N<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La publicaci\u00f3n de esta licitaci\u00f3n de 30 millones de euros por parte de A\u00e9roports de Paris es m\u00e1s que una simple orden de compra de cables y conmutadores; representa una recalibraci\u00f3n estrat\u00e9gica de su cadena de suministro. La reducci\u00f3n del valor, desde la licitaci\u00f3n cancelada de 35 millones de euros en 2025 hasta la cifra actual de 30 millones de euros, indica un alcance m\u00e1s preciso y espec\u00edfico. ADP ha dedicado casi un a\u00f1o a replantear este requisito, y el resultado es un mecanismo \u00e1gil y a largo plazo dise\u00f1ado para garantizar precios y disponibilidad durante el resto de la d\u00e9cada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La decisi\u00f3n de utilizar un procedimiento negociado para un contrato de suministro es reveladora. Normalmente, los suministros se adquieren mediante licitaciones p\u00fablicas donde el precio es el factor determinante. Al optar por la negociaci\u00f3n, ADP indica que la compatibilidad t\u00e9cnica, la log\u00edstica y, posiblemente, la capacidad de integraci\u00f3n con los sistemas aeroportuarios existentes son tan importantes como el costo unitario. Buscan la flexibilidad para discutir el &quot;c\u00f3mo&quot; de la entrega, no solo el &quot;qu\u00e9&quot;.\u201c<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Adem\u00e1s, la duraci\u00f3n de 96 meses representa una estrategia ambiciosa para lograr estabilidad. En una \u00e9poca de fluctuaciones en los costos de las materias primas (cobre, componentes electr\u00f3nicos), establecer un marco contractual a ocho a\u00f1os proporciona a ADP previsibilidad presupuestaria. Sin embargo, para los licitadores ganadores, esto plantea un desaf\u00edo en la gesti\u00f3n de riesgos: \u00bfc\u00f3mo fijar el precio de los materiales para 2034 en 2026? La \u201cmodificaci\u00f3n de las necesidades operativas\u201d, citada como motivo de la cancelaci\u00f3n anterior, bien podr\u00eda estar relacionada con estos compromisos de indexaci\u00f3n y volumen a largo plazo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Los usuarios de Hermix que analizan esta licitaci\u00f3n pueden observar que, si bien el plazo es ajustado, el premio es un contrato fundamental que sustenta los ingresos de la empresa en el sector p\u00fablico durante casi una d\u00e9cada. Los datos sugieren que, aunque el panorama actual est\u00e1 bien definido, la estructura de &quot;m\u00faltiples ganadores&quot; abre la puerta a que un competidor ocupe ese segundo puesto junto al principal.<\/p>\n\n\n\n\n\n\n<h2 class=\"wp-block-heading\">CONSEJOS PR\u00c1CTICOS PARA LOS LICITADORES<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">En funci\u00f3n de las estrictas restricciones y los datos que figuran en el PDF, esto es lo que los licitadores deben saber para poder optar a la licitaci\u00f3n.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A qui\u00e9n va dirigida esta licitaci\u00f3n:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Grandes distribuidores de material el\u00e9ctrico: El valor de 30 millones de euros y el amplio alcance (&quot;Materiales el\u00e9ctricos&quot;) favorecen a los grandes distribuidores en lugar de a los fabricantes especializados.<\/li>\n\n\n\n<li>Entidades franc\u00f3fonas: La oferta se presenta exclusivamente en franc\u00e9s. Toda la documentaci\u00f3n t\u00e9cnica, las negociaciones y la gesti\u00f3n contractual se realizar\u00e1n en franc\u00e9s.<\/li>\n\n\n\n<li>Consorcios: Dada la regla de &quot;m\u00e1ximo 2 titulares&quot; y la amplitud de &quot;todas las ubicaciones&quot; (Val-de-Marne, Seine-Saint-Denis), un consorcio entre un especialista en log\u00edstica y un proveedor t\u00e9cnico podr\u00eda ser una estrategia s\u00f3lida.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Puntos clave a tener en cuenta:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Se requiere acci\u00f3n inmediata: Dispone de aproximadamente dos semanas desde la fecha de publicaci\u00f3n (17\/02) hasta la fecha l\u00edmite (03\/03). Este plazo es apenas suficiente para leer el CCTP y formular una oferta. Los documentos administrativos deben estar listos cuanto antes.<\/li>\n\n\n\n<li>Revise los cambios: Si accedi\u00f3 a la licitaci\u00f3n anterior (JOUE 191318-2025), no copie y pegue su oferta. El presupuesto se ha reducido en 5 millones de euros. Debe identificar d\u00f3nde se ha reducido el alcance del proyecto.<\/li>\n\n\n\n<li>Estrategia de precios a 8 a\u00f1os: El contrato tiene una duraci\u00f3n de 96 meses. Aseg\u00farese de que su oferta financiera incluya cl\u00e1usulas de revisi\u00f3n s\u00f3lidas o estrategias de cobertura para los costos de los materiales, ya que se trata de un acuerdo marco que le obliga a permanecer en \u00e9l.<\/li>\n\n\n\n<li>Preparaci\u00f3n para la negociaci\u00f3n: Prepare a sus equipos t\u00e9cnicos para las entrevistas. El procedimiento de &quot;negociaci\u00f3n&quot; implica que deber\u00e1 poder defender la fiabilidad de su cadena de suministro y su adaptabilidad t\u00e9cnica en persona (o por videoconferencia) tras la presentaci\u00f3n inicial.<\/li>\n\n\n\n<li>Estrategia de doble ganador: Aspira a estar entre los dos primeros. No necesitas ser el m\u00e1s barato para conseguir un puesto en la plataforma, pero debes ser una de las dos ofertas m\u00e1s ventajosas econ\u00f3micamente para asegurar el contrato de 8 a\u00f1os.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A\u00e9roports de Paris ha manifestado su clara intenci\u00f3n de asegurar su infraestructura de suministro el\u00e9ctrico a largo plazo. Este contrato de 30 millones de euros representa una oportunidad crucial para que los proveedores se integren en las operaciones de un centro de transporte de primer nivel hasta 2034. Aprovechando las particularidades del procedimiento, como el formato negociado y el alcance reducido derivado de la cancelaci\u00f3n anterior, los licitadores m\u00e1s astutos pueden convertir esta licitaci\u00f3n de alta presi\u00f3n y plazo ajustado en una victoria decisiva.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Crea tu cuenta gratuita hoy mismo <a href=\"https:\/\/hermix.com\/es\/registrarse\/\">https:\/\/hermix.com\/sign-up\/<\/a> y ganar m\u00e1s contratos p\u00fablicos con el enfoque basado en datos que ayuda a las empresas a tener \u00e9xito constante en las ventas B2G en toda Europa.<\/p>\n\n\n<figure class=\"wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1200\" height=\"628\" src=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"A\u00e9roports de Paris lanza un acuerdo marco de suministro de materiales el\u00e9ctricos de ocho a\u00f1os por valor de 30 millones de euros.\" style=\"object-fit:cover;\" srcset=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png 1200w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image-300x157.png 300w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image-1024x536.png 1024w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image-768x402.png 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":7562,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_angie_page":false,"content-type":"","inline_featured_image":false,"page_builder":"","footnotes":""},"categories":[35],"tags":[],"ppma_author":[17],"class_list":["post-7561","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tender-analysis"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Andreea Ilie\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"es_ES\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Hermix - Win Public Contracts with the Power of AI\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix\" \/>\n\t\t<meta property=\"og:description\" content=\"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-03-12T11:33:16+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-03-12T11:33:16+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/hermixapp\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:title\" content=\"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix\" \/>\n\t\t<meta name=\"twitter:description\" content=\"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#blogposting\",\"name\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix\",\"headline\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework\",\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/author\\\/andreea-ilie\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\",\"width\":1200,\"height\":628,\"caption\":\"A\\u00e9roports de Paris Launches-\\u20ac30 Million Eight-Year Electrical Materials Supply Framework\"},\"datePublished\":\"2026-03-12T12:33:16+02:00\",\"dateModified\":\"2026-03-12T12:33:16+02:00\",\"inLanguage\":\"es-ES\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#webpage\"},\"articleSection\":\"Tender Analysis, Andreea Ilie\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hermix.com\\\/es\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/category\\\/tender-analysis\\\/#listItem\",\"position\":2,\"name\":\"Tender Analysis\",\"item\":\"https:\\\/\\\/hermix.com\\\/es\\\/category\\\/tender-analysis\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#listItem\",\"name\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#listItem\",\"position\":3,\"name\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/#organization\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"url\":\"https:\\\/\\\/hermix.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.hermix.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hermix_logo.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/hermixapp\",\"https:\\\/\\\/twitter.com\\\/Hermix_sw\",\"https:\\\/\\\/www.instagram.com\\\/hermix_sw\\\/\",\"https:\\\/\\\/be.linkedin.com\\\/company\\\/hermix\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/author\\\/andreea-ilie\\\/#author\",\"url\":\"https:\\\/\\\/hermix.com\\\/es\\\/author\\\/andreea-ilie\\\/\",\"name\":\"Andreea Ilie\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#webpage\",\"url\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/\",\"name\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix\",\"description\":\"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\\\/\\\/app.hermix.com\\\/opportunities\\\/00110820-2026 A\\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued\",\"inLanguage\":\"es-ES\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/author\\\/andreea-ilie\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/author\\\/andreea-ilie\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#mainImage\",\"width\":1200,\"height\":628,\"caption\":\"A\\u00e9roports de Paris Launches-\\u20ac30 Million Eight-Year Electrical Materials Supply Framework\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#mainImage\"},\"datePublished\":\"2026-03-12T12:33:16+02:00\",\"dateModified\":\"2026-03-12T12:33:16+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/hermix.com\\\/es\\\/\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"inLanguage\":\"es-ES\",\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/es\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"A\u00e9roports de Paris lanza un acuerdo marco de suministro de materiales el\u00e9ctricos de ocho a\u00f1os por valor de 30 millones de euros - Hermix","description":"Un acuerdo marco masivo de 96 meses para estandarizar la infraestructura el\u00e9ctrica en los aeropuertos de Par\u00eds tras una reevaluaci\u00f3n estrat\u00e9gica de las necesidades operativas. Cree una cuenta gratuita y vea todos los detalles de la licitaci\u00f3n p\u00fablica aqu\u00ed: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) ha publicado oficialmente una importante convocatoria de competencia en relaci\u00f3n con el suministro de equipos el\u00e9ctricos en todas sus instalaciones, valoradas en","canonical_url":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#blogposting","name":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix","headline":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework","author":{"@id":"https:\/\/hermix.com\/es\/author\/andreea-ilie\/#author"},"publisher":{"@id":"https:\/\/hermix.com\/es\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png","width":1200,"height":628,"caption":"A\u00e9roports de Paris Launches-\u20ac30 Million Eight-Year Electrical Materials Supply Framework"},"datePublished":"2026-03-12T12:33:16+02:00","dateModified":"2026-03-12T12:33:16+02:00","inLanguage":"es-ES","mainEntityOfPage":{"@id":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#webpage"},"isPartOf":{"@id":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#webpage"},"articleSection":"Tender Analysis, Andreea Ilie"},{"@type":"BreadcrumbList","@id":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/hermix.com\/es#listItem","position":1,"name":"Home","item":"https:\/\/hermix.com\/es","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/es\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/es\/category\/tender-analysis\/#listItem","position":2,"name":"Tender Analysis","item":"https:\/\/hermix.com\/es\/category\/tender-analysis\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#listItem","name":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework"},"previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/es#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#listItem","position":3,"name":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework","previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/es\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}}]},{"@type":"Organization","@id":"https:\/\/hermix.com\/es\/#organization","name":"Hermix","description":"Win Public Contracts with the Power of AI","url":"https:\/\/hermix.com\/es\/","logo":{"@type":"ImageObject","url":"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png","@id":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#organizationLogo"},"image":{"@id":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/hermixapp","https:\/\/twitter.com\/Hermix_sw","https:\/\/www.instagram.com\/hermix_sw\/","https:\/\/be.linkedin.com\/company\/hermix"]},{"@type":"Person","@id":"https:\/\/hermix.com\/es\/author\/andreea-ilie\/#author","url":"https:\/\/hermix.com\/es\/author\/andreea-ilie\/","name":"Andreea Ilie"},{"@type":"WebPage","@id":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#webpage","url":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/","name":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix","description":"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued","inLanguage":"es-ES","isPartOf":{"@id":"https:\/\/hermix.com\/es\/#website"},"breadcrumb":{"@id":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#breadcrumblist"},"author":{"@id":"https:\/\/hermix.com\/es\/author\/andreea-ilie\/#author"},"creator":{"@id":"https:\/\/hermix.com\/es\/author\/andreea-ilie\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png","@id":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#mainImage","width":1200,"height":628,"caption":"A\u00e9roports de Paris Launches-\u20ac30 Million Eight-Year Electrical Materials Supply Framework"},"primaryImageOfPage":{"@id":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#mainImage"},"datePublished":"2026-03-12T12:33:16+02:00","dateModified":"2026-03-12T12:33:16+02:00"},{"@type":"WebSite","@id":"https:\/\/hermix.com\/es\/#website","url":"https:\/\/hermix.com\/es\/","name":"Hermix","description":"Win Public Contracts with the Power of AI","inLanguage":"es-ES","publisher":{"@id":"https:\/\/hermix.com\/es\/#organization"}}]},"og:locale":"es_ES","og:site_name":"Hermix - Win Public Contracts with the Power of AI","og:type":"article","og:title":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix","og:description":"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued","og:url":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/","og:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png","og:image:secure_url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png","og:image:width":1200,"og:image:height":628,"article:published_time":"2026-03-12T11:33:16+00:00","article:modified_time":"2026-03-12T11:33:16+00:00","article:publisher":"https:\/\/www.facebook.com\/hermixapp","twitter:card":"summary_large_image","twitter:site":"@Hermix_sw","twitter:title":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix","twitter:description":"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued","twitter:creator":"@Hermix_sw","twitter:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png"},"aioseo_meta_data":{"post_id":"7561","title":null,"description":null,"keywords":null,"keyphrases":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-08-20 11:55:20","updated":"2026-08-20 11:55:20"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/es\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/es\/category\/tender-analysis\/\" title=\"Tender Analysis\">Tender Analysis<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tA\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/hermix.com\/es"},{"label":"Tender Analysis","link":"https:\/\/hermix.com\/es\/category\/tender-analysis\/"},{"label":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework","link":"https:\/\/hermix.com\/es\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/"}],"authors":[{"term_id":17,"user_id":3,"is_guest":0,"slug":"andreea-ilie","display_name":"Andreea Ilie","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/cb0674b58c82c13f3140f57ce6b238abab5257f06d482468c588e76c72b29e8c?s=96&d=mm&r=g","author_category":"","first_name":"","last_name":"","user_url":"","job_title":"","description":""}],"_links":{"self":[{"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/posts\/7561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/comments?post=7561"}],"version-history":[{"count":0,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/posts\/7561\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/media\/7562"}],"wp:attachment":[{"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/media?parent=7561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/categories?post=7561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/tags?post=7561"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/hermix.com\/es\/wp-json\/wp\/v2\/ppma_author?post=7561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}