{"id":7561,"date":"2026-03-12T12:33:16","date_gmt":"2026-03-12T11:33:16","guid":{"rendered":"https:\/\/hermix.com\/?p=7561"},"modified":"2026-03-12T12:33:16","modified_gmt":"2026-03-12T11:33:16","slug":"aeroports-de-paris-startet-achtjahriges-rahmenabkommen-zur-lieferung-von-elektromaterialien-im-wert-von-30-millionen-euro-2","status":"publish","type":"post","link":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/","title":{"rendered":"A\u00e9roports de Paris startet achtj\u00e4hriges Rahmenabkommen zur Lieferung von Elektromaterialien im Wert von 30 Millionen Euro"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><em>Ein umfangreiches Rahmenabkommen mit einer Laufzeit von 96 Monaten zur Standardisierung der elektrischen Infrastruktur an den Pariser Flugh\u00e4fen nach einer strategischen Neubewertung der betrieblichen Erfordernisse.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Erstellen Sie ein kostenloses Konto und sehen Sie hier die vollst\u00e4ndigen Details der \u00f6ffentlichen Ausschreibung: <a href=\"https:\/\/app.hermix.com\/opportunities\/00110820-2026\">https:\/\/app.hermix.com\/opportunities\/00110820-2026<\/a><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A\u00e9roports de Paris (ADP) hat eine bedeutende Ausschreibung f\u00fcr die Lieferung elektrischer Ausr\u00fcstung an allen Standorten im gesch\u00e4tzten Wert von 30 Millionen Euro ver\u00f6ffentlicht. Diese Ausschreibung stellt eine wichtige Infrastrukturinvestition f\u00fcr den Betreiber dar und gew\u00e4hrleistet die kontinuierliche Modernisierung und Instandhaltung der elektrischen Systeme in einem der verkehrsreichsten Flughafennetze Europas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Was diese Gelegenheit neben ihrem hohen Wert besonders bemerkenswert macht, ist ihr Kontext. Diese Ausschreibung folgt auf eine zuvor abgesagte Konsultation vom M\u00e4rz 2025 und signalisiert eine gezielte Pr\u00e4zisierung der betrieblichen Anforderungen von ADP. Mit einer Vertragslaufzeit von acht Jahren (96 Monaten) bietet diese Rahmenvereinbarung Lieferanten die seltene Gelegenheit, eine zehnj\u00e4hrige Partnerschaft mit einem f\u00fchrenden franz\u00f6sischen Verkehrsknotenpunkt zu sichern. Da die Einreichungsfrist jedoch deutlich verk\u00fcrzt ist und Anfang M\u00e4rz 2026 endet, m\u00fcssen interessierte Bieter umgehend handeln.<\/p>\n\n\n\n\n\n\n<h2 class=\"wp-block-heading\">\u00dcBERBLICK \u00dcBER DIE M\u00d6GLICHKEITEN<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Dieser Abschnitt enth\u00e4lt die wichtigsten Fakten zur Ausschreibung. Alle Zahlen stammen ausschlie\u00dflich aus der offiziellen Bekanntmachung (Referenz 00110820-2026).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Auftraggeber: <\/strong>A\u00e9roports de Paris (ADP)<br><strong>Referenznummer:<\/strong> 00110820-2026 (Interne Referenz: SPA023036)<br><strong>Ausschreibungstitel:<\/strong> Fourniture de mat\u00e9riels \u00e9lectriques sur tous les sites d&#039;A\u00e9roports de Paris (Lieferung elektrischer Ausr\u00fcstung f\u00fcr alle Standorte des A\u00e9roports de Paris)<br><strong>Arbeitsumfang:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lieferung von Elektromaterialien und Zubeh\u00f6r.<\/li>\n\n\n\n<li>Lieferungen im Rahmen eines Rahmenabkommens (Accord-Kader) durchf\u00fchren.<\/li>\n\n\n\n<li>Vereinbarung mit mehreren Attributen (maximal zwei Inhaber).<\/li>\n\n\n\n<li>Erf\u00fcllung von Bestellungen auf Basis technischer Klauseln (CCTP).<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Grundst\u00fccksstruktur:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Los 1: Elektrom\u00f6bel f\u00fcr alle Standorte der Pariser Flugh\u00e4fen.<\/li>\n\n\n\n<li>Loswert: 30.000.000,00 \u20ac.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Veranstaltungsort:<\/strong> Frankreich (insbesondere Val-de-Marne und Seine-Saint-Denis).<br><strong>Gesch\u00e4tzter Gesamtwert:<\/strong> 30.000.000,00 \u20ac ohne MwSt.<br><strong>Vertragsdauer: <\/strong>96 Monate.<br><strong>Verfahrensart: <\/strong>Ausgehandelt mit vorheriger Ver\u00f6ffentlichung einer Ausschreibung \/ Wettbewerbsf\u00e4hig mit Verhandlung.<br><strong>Vergabekriterien:<\/strong> In der Kurzmitteilung nicht angegeben (\u201cUnbekannt\u201d).<br><strong>Wichtige Termine:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ver\u00f6ffentlichungsdatum: 17.02.2026<\/li>\n\n\n\n<li>Einsendeschluss: 03.03.2026<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Sprachliche Anforderungen: <\/strong>Franz\u00f6sisch.<br><strong>EU-F\u00f6rderung:<\/strong> NEIN.<br><strong>Kontaktdaten:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ansprechpartner: DHATI<\/li>\n\n\n\n<li>E-Mail: dhati@adp.fr<\/li>\n\n\n\n<li>Telefon: +33 0174221567<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Einreichungsportal \/ URL<\/strong>:<a href=\" https:\/\/fournisseurs.aeroportsdeparis.fr\/\"> https:\/\/fournisseurs.aeroportsdeparis.fr\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Bereit, Ausschreibungen wie diese schneller zu qualifizieren? Erstellen Sie Ihr kostenloses Hermix-Konto unter <a href=\"https:\/\/hermix.com\/de\/registrieren\/\">https:\/\/hermix.com\/sign-up\/<\/a> und nutzen Sie KI-gest\u00fctzte Ausschreibungsanalysen, Wettbewerbsbeobachtung und automatisiertes Monitoring auf dem europ\u00e4ischen Markt f\u00fcr das \u00f6ffentliche Beschaffungswesen im Wert von 2 Billionen Euro.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">AUTORIT\u00c4T &amp; GESCHICHTE<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A\u00e9roports de Paris (ADP) ist die zentrale Betreibergesellschaft der wichtigsten Pariser Flugh\u00e4fen, darunter Charles de Gaulle, Orly und Le Bourget. Als Auftraggeber ist ADP im Bereich \u201cFlughafenbezogene Aktivit\u00e4ten\u201d t\u00e4tig und verwaltet umfangreiche Infrastrukturportfolios, die st\u00e4ndige logistische und technische Unterst\u00fctzung erfordern.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Die im Ausschreibungsdokument enthaltenen Daten unterstreichen, dass ADP ein Gro\u00dfabnehmer mit einer bedeutenden Pr\u00e4senz im europ\u00e4ischen Beschaffungswesen ist.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Gesamtzahl der offenen Ausschreibungen: Derzeit hat ADP 8 offene Ausschreibungen mit einem Gesamtwert von ca. 243 Millionen Euro.<\/li>\n\n\n\n<li>Verl\u00e4ngerungsprognose: Die Beh\u00f6rde verf\u00fcgt \u00fcber eine umfangreiche Pipeline von 301 Verl\u00e4ngerungen im Wert von 8,4 Milliarden Euro, was auf einen stetigen Strom zuk\u00fcnftiger M\u00f6glichkeiten hindeutet.<\/li>\n\n\n\n<li>\u00c4hnliche Verl\u00e4ngerungen: speziell im Rahmen dieser Ausschreibung gibt es 14 Verl\u00e4ngerungen im Wert von 173 Millionen Euro.<\/li>\n\n\n\n<li>Auftragsvergabe: Die Daten weisen auf 50 einzelne Auftragsvergaben mit einem Gesamtwert von 266 Millionen Euro hin.<\/li>\n\n\n\n<li>\u00c4hnliche Auftragsvergaben: Das System kennzeichnet 360 \u00e4hnliche Auftragsvergaben, was darauf schlie\u00dfen l\u00e4sst, dass die elektrische Versorgung und Instandhaltung f\u00fcr diesen K\u00e4ufer eine wiederkehrende und h\u00e4ufige Beschaffungskategorie darstellt.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Dieses Aktivit\u00e4tsprofil zeichnet das Bild einer Organisation, die f\u00fcr ihren Gesch\u00e4ftsbetrieb stark auf strukturierte, langfristige externe Vertr\u00e4ge angewiesen ist. Das enorme Volumen der Vertragsverl\u00e4ngerungen (8,4 Milliarden Euro) deutet darauf hin, dass das Potenzial f\u00fcr wiederkehrende Einnahmen und Vertragsverl\u00e4ngerungen au\u00dferordentlich hoch ist, sobald ein Lieferant in das ADP-\u00d6kosystem aufgenommen wird. Die aktuelle Ausschreibung mit ihrer Laufzeit von 96 Monaten f\u00fcgt sich perfekt in dieses Muster langfristiger Lieferantenbindung ein.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">WETTBEWERBSUMFELD<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">F\u00fcr potenzielle Bieter ist es unerl\u00e4sslich zu wissen, wer aktuell Auftr\u00e4ge von ADP erh\u00e4lt. Die Daten zu \u201cGewinnern \u00e4hnlicher Auftr\u00e4ge\u201d bieten eine Momentaufnahme der bestehenden Marktsituation im Bereich Elektrotechnik und Beleuchtung.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Top-Auftragnehmer: Die verf\u00fcgbaren Daten heben einen bestimmten Auftragnehmer hervor, der f\u00fcr diesen Bereich relevant ist:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>FONROCHE BELEUCHTUNG\n<ul class=\"wp-block-list\">\n<li>Anzahl der Vertr\u00e4ge: 1<\/li>\n\n\n\n<li>Land: Frankreich<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Obwohl die Daten Fonroche Lighting als Gewinner eines vergleichbaren Auftrags ausweisen, zeigt der breitere Kontext \u201cAndere K\u00e4ufer mit \u00e4hnlichen Projekten\u201d eine Markttiefe von 681 Unternehmen mit einem Projektvolumen von 1 Milliarde Euro. Dies deutet darauf hin, dass der Markt f\u00fcr elektrische Ausr\u00fcstung f\u00fcr Flugh\u00e4fen trotz etablierter Anbieter bei ADP riesig und wettbewerbsintensiv ist.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Wichtige Muster:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Franz\u00f6sische Vorherrschaft: <\/strong>Die Daten zum Auftragnehmerland nennen Frankreich ausdr\u00fccklich als Herkunftsland des ausgew\u00e4hlten Gewinners. Angesichts der strikten Anforderung franz\u00f6sischer Sprache f\u00fcr Angebote in dieser Ausschreibung ist es sehr wahrscheinlich, dass inl\u00e4ndische Unternehmen oder internationale Unternehmen mit starken franz\u00f6sischen Niederlassungen den Bieterprozess dominieren werden.<\/li>\n\n\n\n<li><strong>Spezialisierung: <\/strong>Die Beauftragung eines auf Beleuchtung spezialisierten Auftragnehmers (Fonroche) deutet darauf hin, dass ADP seinen Elektrobedarf segmentieren k\u00f6nnte. Die aktuelle Ausschreibung umfasst jedoch den Begriff \u201cElektromaterialien\u201d sehr breit gefasst (CPV 31681410), was den Bedarf an einem Generalisten oder einem Konsortium nahelegt, das ein breites Sortiment an Elektroartikeln abdecken kann, nicht nur Beleuchtung.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">KOMMERZIELLE &amp; VERFAHRENSSIGNALE<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Diese Ausschreibung ist kein \u00fcbliches offenes Verfahren. Mehrere wichtige Hinweise in den Unterlagen bestimmen, wie dieses Beschaffungsverfahren ablaufen wird.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Das \u201cverhandelte\u201d Verfahren: Das Verfahren ist als \u201cVerhandlung nach vorheriger Ver\u00f6ffentlichung einer Ausschreibung\u201d aufgef\u00fchrt. Dies stellt eine deutliche Abweichung von herk\u00f6mmlichen offenen Ausschreibungen dar. Es bedeutet, dass ADP beabsichtigt, qualifizierte Bewerber in die engere Auswahl zu nehmen und anschlie\u00dfend in einen Dialog zu treten, um die technischen oder finanziellen Aspekte der Angebote zu pr\u00e4zisieren. F\u00fcr Bieter bedeutet dies, dass die erste Angebotsabgabe nur der erste Schritt ist; die F\u00e4higkeit, nach der Angebotsabgabe \u00fcber technische Spezifikationen und Preisstrukturen zu verhandeln, ist entscheidend f\u00fcr den Zuschlag.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Die Kurzbeschreibung der Neuausschreibung weist ausdr\u00fccklich darauf hin, dass es sich um eine erneute Ausschreibung handelt. Eine vorherige Konsultation (Referenz JOUE 191318-2025, ver\u00f6ffentlicht am 25.03.2025) wurde aufgrund einer \u00c4nderung des betrieblichen Bedarfs der A\u00e9roports de Paris als \u201csans suite\u201d (erfolglos\/abgebrochen) erkl\u00e4rt.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Vorheriger Wert: 35.000.000,00 \u20ac<\/li>\n\n\n\n<li>Aktueller Wert: 30.000.000,00 \u20ac<\/li>\n\n\n\n<li>Folge: ADP hat seine Anforderungen um 5 Millionen Euro nach unten korrigiert. Bieter, die an der Runde 2025 teilgenommen haben, m\u00fcssen die neuen technischen Klauseln (CCTP) sorgf\u00e4ltig analysieren, um genau zu verstehen, was im Leistungsumfang gek\u00fcrzt oder ge\u00e4ndert wurde.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Rahmenvertragsstruktur: Der Vertrag ist ein Rahmenvertrag mit Bestellungen. Er ist mehrattributiv, d. h. ADP w\u00e4hlt maximal zwei Vertragspartner aus.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Strategisches Signal: ADP will sich nicht acht Jahre lang auf einen einzigen Anbieter verlassen. Sie bauen Redundanz auf. Der zweite Platz ist fast genauso wertvoll wie der erste, da er den Zugang zum Rahmenvertrag f\u00fcr fast ein Jahrzehnt garantiert.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Extremer Zeitdruck<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ver\u00f6ffentlichung: 17. Februar 2026.<\/li>\n\n\n\n<li>Einsendeschluss: 3. M\u00e4rz 2026.<\/li>\n\n\n\n<li>L\u00fccke: Nur 14 Tage.<\/li>\n\n\n\n<li>Folgerung: F\u00fcr einen 30-Millionen-Euro-Auftrag, insbesondere einen mit Verhandlungen, ist das Zeitfenster au\u00dfergew\u00f6hnlich kurz. Dies deutet stark darauf hin, dass ADP \u00fcber ausgereifte Anforderungen und m\u00f6glicherweise einen Pool vorab identifizierter Lieferanten verf\u00fcgt, die Angebote abgeben werden. Neueinsteiger m\u00fcssen daher \u00e4u\u00dferst schnell handeln, um ein konformes Dossier zusammenzustellen.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Narrative Einsicht \/ Interpretation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Die Ausschreibung von A\u00e9roports de Paris \u00fcber 30 Millionen Euro ist mehr als nur ein Kaufauftrag f\u00fcr Kabel und Switches; sie bedeutet eine strategische Neuausrichtung der Lieferkette. Die Reduzierung des Auftragswerts von der urspr\u00fcnglich stornierten 35-Millionen-Euro-Ausschreibung im Jahr 2025 auf nunmehr 30 Millionen Euro deutet auf einen fokussierteren und pr\u00e4ziseren Rahmen hin. ADP hat sich fast ein Jahr Zeit genommen, um diese Anforderungen zu \u00fcberdenken. Das Ergebnis ist ein schlankes, langfristiges Instrument, das die Preisgestaltung und Verf\u00fcgbarkeit f\u00fcr den Rest des Jahrzehnts sichern soll.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Die Entscheidung f\u00fcr ein Verhandlungsverfahren bei einem Liefervertrag ist aufschlussreich. \u00dcblicherweise werden Lieferungen \u00fcber \u00f6ffentliche Ausschreibungen beschafft, bei denen der Preis im Vordergrund steht. Mit der Wahl des Verhandlungsverfahrens signalisiert ADP, dass technische Kompatibilit\u00e4t, Logistik und m\u00f6glicherweise die Integration in bestehende Flughafensysteme ebenso wichtig sind wie die St\u00fcckkosten. Sie m\u00f6chten die Flexibilit\u00e4t haben, nicht nur das \u201cWas\u201d, sondern auch das \u201cWie\u201d der Lieferung zu besprechen.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dar\u00fcber hinaus stellt die Laufzeit von 96 Monaten einen entschlossenen Schritt hin zu mehr Stabilit\u00e4t dar. Angesichts schwankender Rohstoffkosten (Kupfer, Elektronik) bietet die Festlegung eines Rahmenvertrags \u00fcber acht Jahre ADP Planungssicherheit. F\u00fcr die erfolgreichen Bieter bedeutet dies jedoch ein Risikomanagement: Wie sollen die Materialpreise f\u00fcr 2034 bereits 2026 festgelegt werden? Die als Grund f\u00fcr die vorherige Stornierung angef\u00fchrte \u201c\u00c4nderung des betrieblichen Bedarfs\u201d d\u00fcrfte durchaus mit diesen Indexierungs- und langfristigen Mengenverpflichtungen zusammenh\u00e4ngen.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Hermix-Nutzer, die diese Ausschreibung analysieren, erkennen, dass die Frist zwar knapp ist, der Gewinn jedoch ein wegweisender Vertrag ist, der die Einnahmen eines Unternehmens im \u00f6ffentlichen Sektor f\u00fcr fast ein Jahrzehnt sichert. Die Daten deuten darauf hin, dass sich der Markt der etablierten Unternehmen zwar konzentriert, die Struktur mit mehreren Gewinnern jedoch einem Herausforderer die M\u00f6glichkeit bietet, neben dem Hauptanbieter den zweiten Platz einzunehmen.<\/p>\n\n\n\n\n\n\n<h2 class=\"wp-block-heading\">PRAKTISCHE HINWEISE F\u00dcR BIETER<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Ausgehend von den strengen Vorgaben und Daten im PDF-Dokument m\u00fcssen Bieter Folgendes wissen, um sich zu qualifizieren.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">F\u00fcr wen diese Einladung geeignet ist:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Gro\u00dfe Elektrogro\u00dfh\u00e4ndler: Der Wert von 30 Millionen Euro und die breite Produktpalette (\u201cElektromaterialien\u201d) sprechen eher f\u00fcr Gro\u00dfh\u00e4ndler als f\u00fcr Nischenhersteller.<\/li>\n\n\n\n<li>Franz\u00f6sischsprachige Unternehmen: Die Angebotssprache ist ausschlie\u00dflich Franz\u00f6sisch. S\u00e4mtliche technische Dokumentation, Verhandlungen und die laufende Vertragsabwicklung erfolgen auf Franz\u00f6sisch.<\/li>\n\n\n\n<li>Konsortien: Angesichts der Regel \u201cmaximal 2 Inhaber\u201d und der Breite des Gebiets \u201calle Standorte\u201d (Val-de-Marne, Seine-Saint-Denis) k\u00f6nnte ein Konsortium zwischen einem Logistikspezialisten und einem technischen Zulieferer eine vielversprechende Strategie sein.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Kritische Aufmerksamkeitspunkte:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Sofortiges Handeln erforderlich: Vom Ver\u00f6ffentlichungsdatum (17.02.) bis zum Abgabetermin (03.03.) bleiben Ihnen etwa zwei Wochen. Dies ist kaum ausreichend Zeit, um die Ausschreibungsunterlagen zu lesen und ein Angebot zu erstellen. Die Verwaltungsunterlagen m\u00fcssen jetzt vorliegen.<\/li>\n\n\n\n<li>Beachten Sie die \u00c4nderungen: Falls Sie bereits auf die vorherige Ausschreibung (JOUE 191318-2025) zugegriffen haben, kopieren Sie Ihr Angebot bitte nicht. Das Budget wurde um 5 Mio. \u20ac gek\u00fcrzt. Geben Sie bitte an, wo der Leistungsumfang reduziert wurde.<\/li>\n\n\n\n<li>Preisstrategie f\u00fcr 8 Jahre: Der Vertrag hat eine Laufzeit von 96 Monaten. Stellen Sie sicher, dass Ihr Finanzangebot solide Anpassungsklauseln oder Absicherungsstrategien f\u00fcr Materialkosten enth\u00e4lt, da es sich um einen Rahmenvertrag handelt, an den Sie gebunden sind.<\/li>\n\n\n\n<li>Verhandlungsbereitschaft: Bereiten Sie Ihre technischen Teams auf die Interviews vor. Das \u201cverhandelte\u201d Verfahren bedeutet, dass Sie nach der ersten Einreichung in der Lage sein m\u00fcssen, die Zuverl\u00e4ssigkeit Ihrer Lieferkette und Ihre technische Anpassungsf\u00e4higkeit pers\u00f6nlich (oder per Video) zu verteidigen.<\/li>\n\n\n\n<li>Strategie f\u00fcr doppelten Erfolg: Streben Sie eine Platzierung unter den ersten beiden an. Sie m\u00fcssen nicht das g\u00fcnstigste Angebot abgeben, um einen Platz im Rahmenvertrag zu ergattern, aber Sie m\u00fcssen zu den beiden wirtschaftlich vorteilhaftesten Angeboten geh\u00f6ren, um sich die achtj\u00e4hrige Laufzeit zu sichern.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A\u00e9roports de Paris hat deutlich gemacht, dass sie ihre Stromversorgungsinfrastruktur langfristig sichern wollen. Dieser 30-Millionen-Euro-Vertrag bietet Lieferanten eine entscheidende Chance, sich bis 2034 in den Betrieb eines Weltklasse-Verkehrsknotenpunkts zu integrieren. Durch geschickte Nutzung der spezifischen Verfahrenskenntnisse, wie beispielsweise des ausgehandelten Formats und des reduzierten Umfangs im Vergleich zur vorherigen Stornierung, k\u00f6nnen clevere Bieter diese anspruchsvolle Ausschreibung mit kurzer Frist zu einem entscheidenden Erfolg machen.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Erstellen Sie noch heute Ihr kostenloses Konto <a href=\"https:\/\/hermix.com\/de\/registrieren\/\">https:\/\/hermix.com\/sign-up\/<\/a> und gewinnen Sie mehr \u00f6ffentliche Auftr\u00e4ge mit dem datengest\u00fctzten Ansatz, der Unternehmen dabei hilft, im B2G-Vertrieb in ganz Europa konstant erfolgreich zu sein.<\/p>\n\n\n<figure class=\"wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1200\" height=\"628\" src=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"A\u00e9roports de Paris startet achtj\u00e4hrigen Rahmenplan zur Lieferung von Elektromaterialien im Wert von 30 Millionen Euro\" style=\"object-fit:cover;\" srcset=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png 1200w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image-300x157.png 300w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image-1024x536.png 1024w, https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image-768x402.png 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":7562,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_angie_page":false,"content-type":"","inline_featured_image":false,"page_builder":"","footnotes":""},"categories":[35],"tags":[],"ppma_author":[17],"class_list":["post-7561","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tender-analysis"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Andreea Ilie\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"de_DE\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Hermix - Win Public Contracts with the Power of AI\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix\" \/>\n\t\t<meta property=\"og:description\" content=\"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-03-12T11:33:16+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-03-12T11:33:16+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/hermixapp\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:title\" content=\"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix\" \/>\n\t\t<meta name=\"twitter:description\" content=\"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@Hermix_sw\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#blogposting\",\"name\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix\",\"headline\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework\",\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/author\\\/andreea-ilie\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\",\"width\":1200,\"height\":628,\"caption\":\"A\\u00e9roports de Paris Launches-\\u20ac30 Million Eight-Year Electrical Materials Supply Framework\"},\"datePublished\":\"2026-03-12T12:33:16+02:00\",\"dateModified\":\"2026-03-12T12:33:16+02:00\",\"inLanguage\":\"de-DE\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#webpage\"},\"articleSection\":\"Tender Analysis, Andreea Ilie\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hermix.com\\\/de\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/category\\\/tender-analysis\\\/#listItem\",\"position\":2,\"name\":\"Tender Analysis\",\"item\":\"https:\\\/\\\/hermix.com\\\/de\\\/category\\\/tender-analysis\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#listItem\",\"name\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#listItem\",\"position\":3,\"name\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/category\\\/tender-analysis\\\/#listItem\",\"name\":\"Tender Analysis\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/#organization\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"url\":\"https:\\\/\\\/hermix.com\\\/de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.hermix.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hermix_logo.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/hermixapp\",\"https:\\\/\\\/twitter.com\\\/Hermix_sw\",\"https:\\\/\\\/www.instagram.com\\\/hermix_sw\\\/\",\"https:\\\/\\\/be.linkedin.com\\\/company\\\/hermix\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/author\\\/andreea-ilie\\\/#author\",\"url\":\"https:\\\/\\\/hermix.com\\\/de\\\/author\\\/andreea-ilie\\\/\",\"name\":\"Andreea Ilie\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#webpage\",\"url\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/\",\"name\":\"A\\u00e9roports de Paris Launches \\u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix\",\"description\":\"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\\\/\\\/app.hermix.com\\\/opportunities\\\/00110820-2026 A\\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued\",\"inLanguage\":\"de-DE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/author\\\/andreea-ilie\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/author\\\/andreea-ilie\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hermix.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#mainImage\",\"width\":1200,\"height\":628,\"caption\":\"A\\u00e9roports de Paris Launches-\\u20ac30 Million Eight-Year Electrical Materials Supply Framework\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\\\/#mainImage\"},\"datePublished\":\"2026-03-12T12:33:16+02:00\",\"dateModified\":\"2026-03-12T12:33:16+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/#website\",\"url\":\"https:\\\/\\\/hermix.com\\\/de\\\/\",\"name\":\"Hermix\",\"description\":\"Win Public Contracts with the Power of AI\",\"inLanguage\":\"de-DE\",\"publisher\":{\"@id\":\"https:\\\/\\\/hermix.com\\\/de\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"A\u00e9roports de Paris startet achtj\u00e4hrige Rahmenvereinbarung zur Lieferung von Elektromaterialien im Wert von 30 Millionen Euro \u2013 Hermix","description":"Nach einer strategischen Neubewertung des Betriebsbedarfs wurde ein umfangreicher Rahmenvertrag \u00fcber 96 Monate zur Standardisierung der elektrischen Infrastruktur an den Pariser Flugh\u00e4fen abgeschlossen. Erstellen Sie ein kostenloses Konto und sehen Sie hier alle Details zur \u00f6ffentlichen Ausschreibung: https:\/\/app.hermix.com\/opportunities\/00110820-2026. A\u00e9roports de Paris (ADP) hat offiziell eine bedeutende Ausschreibung f\u00fcr die Lieferung elektrischer Ausr\u00fcstung an allen Standorten ver\u00f6ffentlicht.","canonical_url":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#blogposting","name":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix","headline":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework","author":{"@id":"https:\/\/hermix.com\/de\/author\/andreea-ilie\/#author"},"publisher":{"@id":"https:\/\/hermix.com\/de\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png","width":1200,"height":628,"caption":"A\u00e9roports de Paris Launches-\u20ac30 Million Eight-Year Electrical Materials Supply Framework"},"datePublished":"2026-03-12T12:33:16+02:00","dateModified":"2026-03-12T12:33:16+02:00","inLanguage":"de-DE","mainEntityOfPage":{"@id":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#webpage"},"isPartOf":{"@id":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#webpage"},"articleSection":"Tender Analysis, Andreea Ilie"},{"@type":"BreadcrumbList","@id":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/hermix.com\/de#listItem","position":1,"name":"Home","item":"https:\/\/hermix.com\/de","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/de\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/de\/category\/tender-analysis\/#listItem","position":2,"name":"Tender Analysis","item":"https:\/\/hermix.com\/de\/category\/tender-analysis\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#listItem","name":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework"},"previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/de#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#listItem","position":3,"name":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework","previousItem":{"@type":"ListItem","@id":"https:\/\/hermix.com\/de\/category\/tender-analysis\/#listItem","name":"Tender Analysis"}}]},{"@type":"Organization","@id":"https:\/\/hermix.com\/de\/#organization","name":"Hermix","description":"Win Public Contracts with the Power of AI","url":"https:\/\/hermix.com\/de\/","logo":{"@type":"ImageObject","url":"https:\/\/www.hermix.com\/wp-content\/uploads\/2022\/04\/hermix_logo.png","@id":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#organizationLogo"},"image":{"@id":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/hermixapp","https:\/\/twitter.com\/Hermix_sw","https:\/\/www.instagram.com\/hermix_sw\/","https:\/\/be.linkedin.com\/company\/hermix"]},{"@type":"Person","@id":"https:\/\/hermix.com\/de\/author\/andreea-ilie\/#author","url":"https:\/\/hermix.com\/de\/author\/andreea-ilie\/","name":"Andreea Ilie"},{"@type":"WebPage","@id":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#webpage","url":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/","name":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix","description":"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued","inLanguage":"de-DE","isPartOf":{"@id":"https:\/\/hermix.com\/de\/#website"},"breadcrumb":{"@id":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#breadcrumblist"},"author":{"@id":"https:\/\/hermix.com\/de\/author\/andreea-ilie\/#author"},"creator":{"@id":"https:\/\/hermix.com\/de\/author\/andreea-ilie\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png","@id":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#mainImage","width":1200,"height":628,"caption":"A\u00e9roports de Paris Launches-\u20ac30 Million Eight-Year Electrical Materials Supply Framework"},"primaryImageOfPage":{"@id":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/#mainImage"},"datePublished":"2026-03-12T12:33:16+02:00","dateModified":"2026-03-12T12:33:16+02:00"},{"@type":"WebSite","@id":"https:\/\/hermix.com\/de\/#website","url":"https:\/\/hermix.com\/de\/","name":"Hermix","description":"Win Public Contracts with the Power of AI","inLanguage":"de-DE","publisher":{"@id":"https:\/\/hermix.com\/de\/#organization"}}]},"og:locale":"de_DE","og:site_name":"Hermix - Win Public Contracts with the Power of AI","og:type":"article","og:title":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix","og:description":"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued","og:url":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/","og:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png","og:image:secure_url":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png","og:image:width":1200,"og:image:height":628,"article:published_time":"2026-03-12T11:33:16+00:00","article:modified_time":"2026-03-12T11:33:16+00:00","article:publisher":"https:\/\/www.facebook.com\/hermixapp","twitter:card":"summary_large_image","twitter:site":"@Hermix_sw","twitter:title":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework - Hermix","twitter:description":"A massive 96-month framework agreement to standardize electrical infrastructure across Paris airports following a strategic re-evaluation of operational needs. Create a free account and see the full public tender details here: https:\/\/app.hermix.com\/opportunities\/00110820-2026 A\u00e9roports de Paris (ADP) has officially released a significant call for competition regarding the supply of electrical equipment across all its sites, valued","twitter:creator":"@Hermix_sw","twitter:image":"https:\/\/hermix.com\/wp-content\/uploads\/2026\/03\/Aeroports-de-Paris-Launches-E30-Million-Eight-Year-Electrical-Materials-Supply-Framework_article_featured-image.png"},"aioseo_meta_data":{"post_id":"7561","title":null,"description":null,"keywords":null,"keyphrases":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-08-20 11:55:20","updated":"2026-08-20 11:55:20"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/de\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hermix.com\/de\/category\/tender-analysis\/\" title=\"Tender Analysis\">Tender Analysis<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tA\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/hermix.com\/de"},{"label":"Tender Analysis","link":"https:\/\/hermix.com\/de\/category\/tender-analysis\/"},{"label":"A\u00e9roports de Paris Launches \u20ac30 Million Eight-Year Electrical Materials Supply Framework","link":"https:\/\/hermix.com\/de\/aeroports-de-paris-launches-e30-million-eight-year-electrical-materials-supply-framework-2\/"}],"authors":[{"term_id":17,"user_id":3,"is_guest":0,"slug":"andreea-ilie","display_name":"Andreea Ilie","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/cb0674b58c82c13f3140f57ce6b238abab5257f06d482468c588e76c72b29e8c?s=96&d=mm&r=g","author_category":"","first_name":"","last_name":"","user_url":"","job_title":"","description":""}],"_links":{"self":[{"href":"https:\/\/hermix.com\/de\/wp-json\/wp\/v2\/posts\/7561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hermix.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hermix.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hermix.com\/de\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/hermix.com\/de\/wp-json\/wp\/v2\/comments?post=7561"}],"version-history":[{"count":0,"href":"https:\/\/hermix.com\/de\/wp-json\/wp\/v2\/posts\/7561\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hermix.com\/de\/wp-json\/wp\/v2\/media\/7562"}],"wp:attachment":[{"href":"https:\/\/hermix.com\/de\/wp-json\/wp\/v2\/media?parent=7561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hermix.com\/de\/wp-json\/wp\/v2\/categories?post=7561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hermix.com\/de\/wp-json\/wp\/v2\/tags?post=7561"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/hermix.com\/de\/wp-json\/wp\/v2\/ppma_author?post=7561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}